ML20247Q593

From kanterella
Jump to navigation Jump to search
Notice of Issuance of Corrected Amend 36 to License NPF-43, Revising Tech Specs Re Source Range Monitors to Permit Complete off-loading During First Refueling Outage
ML20247Q593
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/19/1989
From: Stang J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20247Q561 List:
References
NUDOCS 8909290035
Download: ML20247Q593 (2)


Text

_ - _

+

7590-01 UNITED STATES NUCLEAR REGULTORY COMMISSION DETROIT EDISON COMPANY WOLVERINE POWER SUPPLY COOPERATIVE, INC.

DOCKET NO. 50-341 NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (Comission).has issued Amendment No.

36 to Facility Operating License No. NPF-43 issued to Detroit Edison-Company (the licensee), which revised the Technical Specifications for operation of Fermi-2, located in Monroe County, Michigan.

The amendment is effective as of the date of issuance.

The amendment revises the Technical Specification (TS) relating to the Source Range Monitors.(SRM) to permit complete core off-loaading during the first refueling outage. The proposed amendment also increases the minimum signal-to-noise ratio required for a reduced SRM minimum count rate requirement and eliminates a related TS provision which is no longer needed.

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Comission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Notice of Consideration of Issuance of Amendment and Opportunity for Hearing in connection with this action was published in the FEDERAL REGISTER on July 11,1989(54FR29117). No request for a hearing or petition for leave to intervene was filed following this notice.

89o9290035 s90g n PDR ADDCK 05000342 P

PNU

= _.

. _ _ ~

_ _. - _ _ - -. _ _ _ = _ _ _ _ _ -

'"y

~' '

i

.s-1 The Commission has prepared'an Environmental Assessment related to the action and hasl determined not to prepare an environmental' impact statement.

j; Based upon the environmental assessment, the Commission has concluded that the

. issuance of.this amendment will not have a significant effect on the. quality of

~

the human behavior environment.

For-further details with respect to the action, see (1)-the application-f for amendment dated April 3,'1989,'(2) Amendment No.

to License No.

NPF-43, (3) the Commission's related Safety Evaluation, and (4) the' Commission's Environmental Assessment. All of these items are available for

- public inspection at the~ Commission's Public Document Room, the Gelman Building, 2120 L Street, N.W., Washington, D.C.,'and at the Local Public Document. Room. A copy of items (2), (3) and (4) may be obtained upon request adcressed to the U.S. Nuclear Regulatory Comission, Washington, D.C. 20555, Attention:

Director, Division of Reactor Projects III, IV, V and Special Projects.

Dated at Rockville, Maryland,.this 30th day of August 1989.

FOR THE NUCLEAR REGULATORY COMMISSION O

d'

\\

A.

dohn F. Stan, Project Manager Project Directorate III-1 Division of Reactor' Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

.