ML20247Q098

From kanterella
Jump to navigation Jump to search
Mod 15 to Contract NRC-04-92-037
ML20247Q098
Person / Time
Issue date: 05/18/1998
From: Martin J, Pool S
NRC OFFICE OF ADMINISTRATION (ADM), SCIENCE APPLICATIONS INTERNATIONAL CORP. (FORMERLY
To:
References
CON-FIN-L-1852, CON-NRC-04-92-037, CON-NRC-4-92-37 NUDOCS 9805280203
Download: ML20247Q098 (4)


Text

-

C

' AMENDMENT'OF SOLICITA' TION / MODIFICATION! OF. CONTRACT

  1. ["

3

-., ~.

2 Al4ENDMENirMODeFICATION NO 3, EFEECalVE DATE,

l4 REOulS'TiONfuRCHASE REQ NO,

.'6 PROXCT NO pl applaesales 15 see bioCk 15C RES-92 037/RESC98368 i

7. ADMINISTERED BY.(If othee then hem si l

6 (SSulD BY

. U.S. Nuclear Regulatory COnimisslOn.

  • CODE I CODE Di.vistor) of Contracts and Property Mgt.,

Attn: T 7-1-2 Wishington DC 20555 8 NAME AND ADDRESS OF CONTRACTOR. Itdo. street, county Stats and ZIP Codel (X).9A. AMENDMENT OF SOLICITATION NO.

l 9a DA1ED rSEE ITEM 111 SAIC 10260 Canpus Point Drive San Dfego, CA 92121 10A. MOOsFICATION OF CONTRAC,T/ ORDER NO

. C/o SAIC, Technology' Anal' & Appl Group '

1710 Goodridge Drive, MClean VA 22102 Con # NRC-04 92-037

'10e DATED (SEE ITEM 13) 3 CODE jrAcit,Ty cooE x

08 18-1992'.

11. THIS ITEM ONLY APPLIES T O A' EN'DMENT$ OF SOLICITATIONS
  • M

. The above numbered solicitation is amended as set forth in item 14. The hour and date'specified for receipt af Offers [is extended. [is not extended.

Offsrs must acknowledge receipt of this am' ndment prior to the hour and date specified en the solicitation or as amended, by one of the following methods:

^

e (s) By Completing items B and 4 5, and returning Copies of the amendment; ft>) By ed nOwledging receipt of this amendment of each Copy of the offsr submitted; or (C) By separate letter or telegram which includes a reference to the sOhcru e and amendment numbers. FAILURE OF YOUR AC-l KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF Off LHS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to Change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date spec!je_d f

la ACCOUNTING ANo APPROPRIATION DATA IH eequiredi

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

f A THi$ CHANGE ORDER IS ISSuf D PURSUANT TO-ISpecify authontvl THE CHANGF.S SET FORTH fN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO IN ITEM LOA sul B THE ABOVE NUMBERED CONTRACT 10RDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES isuch as et anges m paymg offece, appropeistion date. etc)

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 431036bl C. THIS SUPPLEMENTAL AGREEMENT is ENTERED INTO PURSUANT TO AUTHORITY OF:

FAR 52.243-2 Changes and FAR 52.232 22 Limitation of Funds K

! D OTHER ISpecif y type of mod hcasion and authoney) t C is not. @ is required to sign this document and return tNo Copies to the issuing office.

E. IMPORTANT: Contractor 14 DESCRIPTION Of AMENDMENTrMODIFICATRON tOrgarwed Dv uCF section tieadmos. mcludeg solecuationtcontract subsect matter where leasible }

See attached Continuation sheet.

O(

p n

9805280203 980518 PDR CONTR NRC-04-92-037 PDR

~.

s Encept et prowded hereen. eli terms and conditions of the document referenced m item 9A or loa, as heretofore changed. eemains unchan' ged end in tull force and eHect 15A NAME AND TITLE OF SIGNER (Type or pfent) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or pnnt)

Q 4CC E /M fr/AI Stephen M. Pool SEunt* cc. nun u- (Keystarsrd:-

)

l$8 art # *T a T46D MERIC 16C Cell $4GNI.D se C 6RrOFFE ROR 16C. DATE SIGNED

/

d

.4.,._W,C_r.c.sm(. u lo515.,,,e j@y gy av

.e_._d,..,

)

k STANDARD $ORM 30 *EV 10 eh C-l

~

. bbdj IS

. Con # NRC-04-92-037 CONTINUATION PA.GE I

1 i

'The purpose of 'tliis m. modification is to ' increase the contract es.timate'd cost,

and fixed fee by $ as.a result of a cost growth.cn. task 2.and task 3 of this l

contract which.was caused'by. an. unforeseen increase in the amount of wor.k required to perform ta'sk 2 and 3 due to the cessation of cooperati'on.

(sharing of information and receipt of input on-technical matters) on the' part'of a collaborative participant to this joint rulemaking effort, i.e.

the Environmental Protection Agency. In addition, this' modification incorporates a within scope subtask for' task 2 on. slag. calculatio.ns, provides $200,000 in incremental funding for the contract and new contractor

-spending plan for' task 2. Accordingly, the contract ie modified as follows:

.p. In.accordance.with FAR clause 52,243-2' Changes'-Cost Reimbursement (AUG i

i 19.8 7 ). ALT V ' ( APR.19B 4 ). and 52. 2.3 2.- 22 Lim.itation of Funds ( APR '19.84 ) a'nd as"a i

result of the growth in the estimated costs for completion of tas.k two'and three of this contract, reasons for which are described'in SAIC's December 18, 1997 proposal, t.he contract estimated cost and fixed fee'are hereby i

increased as shown below.

In addition, the attached Statement of Work entitled " Specific Calculations, Comparison, and Additional Slag Scenarios" is hereby incorporated into the contract at Section C.1.3.B (2) (6). Previous verbal authority had been provided by the contracting officer for the contractor t'o commence' work on this subtask. As a result the contract estimated cost and fee are increased as shown separately below:

FROM:

INCREASED BY':

INCREASED BY:

TO:

l FOR COST GROWTH FOR SLAG SOW Est. Cost

$2,396,931

$ 112,899

$39,594

$2,549,424 Fixed Fee 176,5'92 9,032

$ 3,168 188,792 "CPFF'

$2;573',-523'

$ 121,931-

$42,762-

$2,738,216

2. This contract modification obligates FY 98 funds in the amount of

$200,000. As a result of this allotment and item #1 above, Section B.3.,

CONSIDERATION AND OBLIGATION - COST PLUS FIXED FEE LIQN 1988) ALTERNATE I GRJN 1991) paragraphs a.,

c. and d. are hereby deleted in their entirety and substituted with the following in lieu thereof:

a.

The total estimated cost to the Government for full performance of this contract is $2,738,216 of which the sum of $2,549,424 represents the total estimated reimbursable costs, and of $188,792 represents the fixed fee.

I c.

The amount currently obligated by the Government with respect to

~

this contract is $2,544,000, of which the sum of $2,368,599 represents the i

total estimated reimbursable costs, and of which $175,401 represents the fixed fee.

l l

d.

It is estimated that the amount currently allotted will cover performance through September 30, 1998."

3.

The Contractor's revised spending plan dated May 11, 1998 includi d' i

completion dates of subtasks described therein is hereby approved and I

incorporated into this contract by reference with the following exceptions and stipulations:

l

a. The purpose of this plan is to complement and actualize the task 2 task descriptions set forth by mod 14 and the basic contract and not to add any Page 2 of 4

Mod #f.15' Cod #' WRC" 92 - 0 3'?

i new work wh.ich was not. contemplated by thos,e sec'tions.

The plan.also revises the' deli'very. schedule of contract sect' ion C.

Thit spending. plan is predicated upon' utilizing'enntract' fonds originally earma'rke'd by'the contractor.for task 3. work,, but which ar.e now ne' ded 'to comple.te the complex e

.research. work of task.two and its report along with the. task one report.

Due to the: complexity'of thi's'fesearch, changes in NRC re' search. staffing, N

and previous substantial collaboration with EPA; and DOE'of this project, it

.'is not anticipated.that task'3, 4.or 5 will be completed.on this contract.

for deferred work is reserved.

b'. Review and. approval of, Section 3. 0.and 4.0

~

This work shall not be performed unless authorized by subsequent contract modification.

c'. The foll.owing is added to the'la'st paragraph of plan section.2.3.6: In cases of near-ties, all near-ties will be also ev'luated with an uncertainty a

analysis as'a potential critical population.

)

)

d. TheJfo11'owing.is added to t.he.end of the last sentence of the third tick

, mark.ite.m in'section 2'.7.2:. ".... incorporated.Jn thia'ne'w se'cEion is'ah

~

illustration'of the mithods to a specific case."

The following.is added to the'fifth tick meaked item at the end of the e.

words in parentheses

" intermediate results from the material flow model-will be added to the report (radionuclides concentrations in reused and recycled material and by-products of refining [ refined metal,' slag, baghouse dust and offgas] at the time each senario begins), including uncertanity analysis results such as mean, 5%, 50%, 95% values."

f. Add the words "NUREG or" just before "NUREG/CR", so that it reads "NUREG or NUREG/CR" in four places in the write-up:

1 section 2.3.9, second line of first paragraph; l

section 2.3.9, third line of second paragraph; section 2.7.1, last line of fourth paragraph; s e c t i o'n 2'. 7.'2, last line of second paragraph 4

g. To cover the possibility of publishing our final report as NUREG instead.

of a NUREG/CR, replace the last sentence of the third (last) paragraph in.

section 2.7.2 as follows.:

"If SAIC is authorized to begin work by May 18, a draft final NUREG/CR shall be completed by September 25, 1996. If a NUREG is published instead of a NUREG/CR, the NRC review time would likely be more lengthy than the two-to-three weeks anticipated for a NUREG/CR review.

In this case, publication of a draft final NUREG by September 25, 1998 is unlikely.

Also, more extensive comments may be generated by internal NRC review for publication of a NUREG instead of a NUREG/CR, and the resolution of more extensive comments would not be covered by this spending plan or current contract estimated cost."

4.

A summary of obligations for this contract from award date through the date of this action is provided below:

Total FY92 Obligation Amount:

$200,000.00 Total FY93 Obligation Amount:

$200,000.00

\\s,'

Total FY94 Obligation Amount:

$200,000.00 Total FY95 Obligation Amount:

$577,000.00 Total FY96 Obligation Amount:

$530,000.00 Total FY97 Obligation Amount:

$637,000.00 Total FY98 Obligation Amount:

$200,000.00 Cumulative Total of NRC Obligations: $2,544,000.00 Page 3 of 4 L

r - - o -- - u --

- - - - ~ - - - - - - - - - -

Mo.d#..

.. Con, # NRC- 04.-92.0 37 15' 5.

-All other t'erms end conditions remain unchanged.

O b

  • q 4

b*

4 m

4 OO e

I

~

i I

6 e

s l

Page 4 of 4

_,