ML20247P644

From kanterella
Jump to navigation Jump to search
Mod 6,revising Statement of Work & Provisional Indirect Rates for CY89 & Increasing Total Estimated Amount of Contract,To Test Specimens from Damaged TMI-2 Reactor Bottom Head
ML20247P644
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 06/27/1989
From: Stephen Bell, Chapin D
MPR ASSOCIATES, INC., NRC OFFICE OF ADMINISTRATION (ADM)
To:
Shared Package
ML20247P642 List:
References
CON-NRC-04-88-086, CON-NRC-4-88-86 NUDOCS 8908040250
Download: ML20247P644 (4)


Text

. _ - - _ _ - . . . ..

j~ ,

1. CON T R~Ci lD CODE -, PACE OF PAGLS
AMENDMENT OF SOLICITATION /MOOlFICATION OF CONTRACT i UMLNDMLNT/MODIF4 CATION two. 3. LF FECT tVE DAT L . 4 REQuestitON/ PURCHASE EEQ. NO.

I-l3

5. PROJECT NO. (t/ appi.coble) 6' ' 5-18-89 RES-88-086. 4-14 < . 6.855UCD HY 7. ADMINISTERED 15Y (If other chart item 6) l (U. 5. Nuclear Regulatory Commission Division of- Contracts & Property Management

'P-902 Washington, D.C. 20555

a. NAML AND ADDHL55 OF CON T R AC10R (No., street, county, State and 2f1* Code) y) 3 9A. AMLNOMENT OF SOLtC AT AT #ON NO.

MPR Associates, Inc. .

1050 Connecticut Avenue, N.W. ee. oATcD esee ntu isi .

Washington, D.C. 20036 2 0A. MODIFICATION OF CON T H ACT/ORDE.R .

NO.

x NRC-04-88-086 S OU. DAT LD (SEE ITEM 2 3)

CODE l FACILITY CODE 1-15-h8

11. THIS ITEM ONLY AP" LIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Ite. 14. The hour and date specified for receipt of Offers is extended, is no: ex.

tended.

Offers enust acknowledge receipt of this amendment prior to the hour an.1 date specified in the solicitation or as amended. by one of the following methods:

' (a) By completing items 8 and 15. and returning copies of the amendment: (b) By acknowledging receipt of this amerv1 ment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILUdE OF YOUR ACKNOWLECG-

' MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THCHOUR AND DATE sPECIFIED MAY RESULT IN hEJECTION OF YOUFI OFFER. If by virtue of this amendment you desire to change an of fer already sutimitted,such change may be made by telegram or fetter, provided each telegram or letter makes reference to the solicitation and this amendmerit.and is received prior to the opening hour ard date specified.

12. ACCOUN1ING AND APPROPRIAT 60N DAT A (if regaared) not applicable 13 THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS.

IT MODIFIES THE CONTRACT / ORDER NO AS DESCRIBED IN ITEM 14.

g A.1Ht$ CHANGE 04 DER 85155ULD PURSUANT T0: (Specify authoritys THE CHANGL5 SET FORTH IN STCM Ja ARE MADC (N T HE CON-T R ACT ORDE R NO, IN IT EM 3 DA.

D. THE ADOVE NUMDC RED CONTR ACT/ ORDER 15 MODIFIED TO REFLECT'T HE ADMINISTR ATIVE CHANGES (such as changes en paying office.

oppropraarnm date, etc.) SET F ORT H IN IT EM 3 a. PURSUANT 10 T HE A4)THORIT Y OF F AR 43.103(D).

C. THth SUPi LCMENT AL AGREEMENT 15 LNTLRED 4NTO PUR5UANT TO AUTHORITY OF:

x. 52.243-2, Changes--Cost Reimbursement; 52.244-2, Subcontracts (Cost-Reimbursemegd
b. 01 HC R iSpecnly type-of moanfacetnon and authorityy

. E. IMPOR T ANT: Contractor O is oot. x is ,eauirea to sign inis eocument ene reto,n 3 Copies to the issuing of fiCc.

n a. DCSCR 6PTlON OF AMLhDMLN1(MODeVl CAT SON (Organized by UCF sectron headmes, includicag schcitotson) contract outvect unatter schere leasible.)

MODIFICATION 6 FOLLOWS ON PAGE 2 0908040250 890627E PDR CONTR NRC-04-88-OB6 PNU-

- L acersi as ovovioco nevein. au se m. and conostions of the cocument eeferenceo in 4 tem 9A of IDA. as heactofore (nanged. eemeens unchangee 70 en f ull fonte ano ettect.

3 54. N Aut, thND is1 LL Of' 56G4( H tT ype n e criar) 16A. NAML AND TIT LE OF CONT 54 ACT aNG Of f IC( 4 flype or kwan t s DOUGLAS M. Ched Sharon Bell, Contracting Officer PRINCIPAL OFFICER A bC. OATL 5tGNLD 160. UN ti U ST AT E 5 0r AM ~ uCA It,C. D ATC SIC,rdLO 15 ' 'ON T Rt(CT OR/OF F L ROR W S SJ

.?

%f$ _

.t-,,e...... . .~ed t. s ,,n , n 7" ,

UY \

- n .t.,e o, C.n t.. tm, 0,,,,,,

f 6N Mao O! 15MM 30 105 ST AND ARD F ORM 't0 IREv. 2 0 e b

Contract NRC-04-88-086

, Modification 6

, Page 2 of 3 ,-

This modification is issued to:

o Revise Section C, Description / Specifications / Work Statement, to incorporate MPR Associates, Inc. 's March 1,1989 proposal; o To increase the total estimated amount of the contract; and o To revise the provisional overhead rate for calendar year 1989.

This modification confirms verbal authority provided to you on May 18, 1989 to commence performance of Modification 6.

Accordingly, the following changes are hereby made:

1. SectionB,SuppliesorServicesandPrices/ Costs,Subsect15nB.2, Consideration ard Obligation--Cost Plus Fixed Fee, is revised to read as follows:

i "8.2 Consideration ano Obligation ~-Cost Plus Fixed Fee

s. It is estimated that the total cost to the Government for full performance of this contract will be $3,266,546.00, of which the sum of $2,969,587.00 represents the estimated reimbursable costs, and of which $296,959.00 represents the fixed fee.,
b. There shall be no adjustment in the amount of the contractor's fixed fee by reason of differences between any estimate of cost for performance of the work under this contract and the actual cost for performance of that work.
c. The amount presently obligated by the Government with respect to this contract is $2,085,000.00."
2. Section C, Description /Specif; cations / Work Statement, Subsection C.1, S_tatement of Work, is revised to add the attached statement of work tc be performed in accordance with MPR Associates, Inc.'s Match 1,1989 proposal, incorporated into the contract by this reference.
3. Section G, Contract Administration Data, Subsection G.1, Indirect Rates, is revised to read as follows:

"G.1 Indirect Rates

a. Pending the establishment of final indt.oct rates which shall be negotiated based on audit of actual costs, the contractor shall be reimt' esed for allowable indirect costs as follows:

Applicable Period Category Rate. Cost Base CY 1988 Overhead 78.78% Direct Labor CY 1989 Overhead 80.62% Direct Labor

Contract NRC-04-88-086 Modification 6 Page 3 of 3 _

b. The Contracting Officer may adjust the above rates as appropriate during the term of the contract upon acceptance of any revisions proposed by the contractor It is the contractor's responsibility to notify the Contracting Officer in accordance with 52.232-20, Limitation of Cost, or 52.232-22, Limitation of Funds, as applicable, if such change (s) affect (s) performance of work within the established cost or funding limitations."

All othre terms and conditions of the contract remain unchanged.

Attachment:

3tatement of Work, Modification 6 ,

l O

I 1

.Y

ATTACHMENT  :

l~ .

'.,** MODIFICATION NO. 6 l

- . i

~

4 .

l

. MODIFICATIONS TO NRC-04-88-086 L. Write quarterly financial reports to be in accordance with OECD requirements. i i

1 l

2. Buy additional tools / equipment to permit extraction of lower head speci-mens. These tools are shown in Attachment 1. .

1 e J i

l

3. Reimburse GPU for additional costs incurred to complete subcontra' cts.

l (Attachment 2). 1 f-j r

-