Letter Sequence Approval |
---|
|
|
MONTHYEARML20247P1431989-05-31031 May 1989 Forwards Safety Evaluation & Inel Technical Evaluation Rept Re Licensee Response to Item 4.5.3, Reactor Trip Sys (RTS) ... of Generic Ltr 83-28.Existing Intervals Consistent W/Achieving High RTS Availability & Acceptable.W/O Encls Project stage: Approval ML20247P1391989-05-31031 May 1989 Forwards Safety Evaluation & Inel Technical Evaluation Rept Re Licensee Response to Item 4.5.3, Reactor Trip Sys (RTS) ... of Generic Ltr 83-28.Existing Intervals Consistent W/Achieving High RTS Availability & Acceptable.W/O Encls Project stage: Approval 1989-05-31
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N1931999-10-22022 October 1999 Forwards Insp Rept 50-298/99-12 on 990927-30.No Violations Noted.Insp Exam of Activities Under License as They Relate to Emergency Preparedness & to Compliance with Commission Rules & Regulations & with Conditions of License ML20217G8771999-10-14014 October 1999 Forwards Insp Rept 50-298/99-10 on 990920-24.No Violations Noted ML20217G7401999-10-14014 October 1999 Forwards MOR for Sept 1999 for Cooper Nuclear Station. Rept Includes Documentation of Challenges to Safety/Relief Valves,Iaw TS 5.6.4 ML20217C2671999-10-0808 October 1999 Forwards Insp Rept 50-298/99-03 on 990823-27 & 0907-10.No Violations Noted.Purpose of Insp to Ensure That Licensee Had Effective Programs for Identifying,Evaluating & Correcting Problems Which Could Impact Safe Plant Operations ML20212K9661999-09-30030 September 1999 Forwards Safety Evaluation Accepting plant-specific Safety Evaluation Rept for USI A-46 Program Implementation at Cooper Nuclear Station ML20216J1081999-09-28028 September 1999 Ltr Contract:Task Order 048, Cooper Safety Sys Design & Performance Capability Insp, Under Contract NRC-03-98-021 ML20212J5061999-09-27027 September 1999 Forwards Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted.Inspectors Focused on Implementation of Licensee Reactor Safety & Emergency Preparedness Programs ML20212F3641999-09-22022 September 1999 Forwards Insp Rept 50-298/99-09 on 990823-26.No Violations Noted ML20216J8061999-09-20020 September 1999 Forwards Rev 37 to Safeguards Plan,Iaw Provisions of 10CFR50.(p).Rev Withheld,Per 10CFR73.21 ML20212C4921999-09-15015 September 1999 Forwards Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station.Rept Includes Operating Data Rept,Unit SD Rept & Documentation of Challenges to Safety/Relief Valves ML20212A6061999-09-14014 September 1999 Forwards Insp Rept 50-298/99-08 on 9900816-20.No Violations Noted.Insp Focused on Implementation & Effective Performance of Access Authorization/Fitness-for-Duty (Behavior Observation) Program & Access Control of Personnel ML20211N5271999-09-0202 September 1999 Responds to NRC 990823 RAI Re Y2K Readiness at Cooper Nuclear Station,Per GL 98-01,Suppl 1 05000298/LER-1999-006, Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl1999-08-26026 August 1999 Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl ML20211F1311999-08-24024 August 1999 Forwards Rev 1 to Calculation Nedc 97-044, NPSH Margins for RHR & CS Pumps, in Support of 990615 Proposed Amend to DPR-46 Re Containment Overpressure Contribution to ECCS Pumps NPSH Requirements 05000298/LER-1999-003, Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel1999-08-23023 August 1999 Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel ML20211F4661999-08-23023 August 1999 Discusses GL 98-01 Issued by NRC on 980511 & NPPD Responses for Cooper Nuclear Station & 990628 & Results of Visit to Plant on 990811-12.Staff Determined That Integrated Contigency Plan Incomplete & CNS Not Y2K Ready ML20210R0301999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Cooper Nuclear Station,Iaw Guidance Provided by GL 97-02.Rept Also Includes Documentation of Challenges to Srvs,Per TS 5.6.4 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P6761999-08-10010 August 1999 Requests That Following Changes Be Made to Distribution on NRC Correspondence ML20210P6861999-08-0909 August 1999 Forwards Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted.During Insp,Inspectors Identified Two Issues Categorized as Being Low Risk Significance & within Licensee Response Band ML20210N1331999-08-0606 August 1999 Forwards Notice of Withdrawal of Application for Amend to FOL DPR-46.By Ltr Licensee Withdrew Amend Request Which Would Have Revised Usfar to Reflect as-built Configuration of Reactor Bldg Isolation Dampers ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K6071999-08-0202 August 1999 Submits Withdrawal of Proposed License Amend Re Secondary Containment Isolation Description & Refueling Accident Analysis Results ML20210K3811999-08-0202 August 1999 Forwards Listed Info,Which NPPD Believes Demonstrates Ability to Obtain Funds in Amount of $10 Million for Payment of Such Premiums within Specified Three Month Period,Iaw 10CFR140.21 ML20210G5101999-07-28028 July 1999 Forwards fitness-for-duty Program semi-annual Performance Rept for Period of 990101-0630,per Provisions of 10CFR26.71(d) ML20210D2541999-07-21021 July 1999 Forwards Insp Rept 50-298/99-02 on 990628-0702.Purpose of Insp Was Primarily to Evaluate Effectiveness of Licensed Operator Requalification Program.No Violations Were Identified ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20209H8191999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear Station ML20209E6951999-07-12012 July 1999 Discusses Response to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Recommends Review of New Database Diskettes on Listed Website.Comments Due by 990901 or Data Entered Into Rvid for Plant Will Be Acceptable ML20209D8731999-07-0808 July 1999 Refers to 990707 Meeting Re Licensee Recent Maintenance Program self-assessment.Also Discussed How Licensee Incorporated Assessment Findings Into Rev of Maintenance Performance Improvement Plan.List of Attendees Encl ML20209B7851999-07-0101 July 1999 Forwards Corrected Occupational Radiation Exposure Repts, for Cys 1996 & 1997.Util Stated That Repts Did Not Properly Tabulate Number of Personnel Receiving Exposures Less than 100 Mrem by Work & Job Functions in CY96 & CY97 05000298/LER-1999-005, Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl1999-07-0101 July 1999 Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl ML20196J2471999-06-29029 June 1999 Discusses Completion of Licensing Action for GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, 05000298/LER-1999-004, Forwards LER 99-004-01.Commitments Made by Util Are Encl1999-06-28028 June 1999 Forwards LER 99-004-01.Commitments Made by Util Are Encl ML20209B5451999-06-28028 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20196H0331999-06-24024 June 1999 Informs NRC of Deletion of 1991 Commitment Contained in Ltr Re Feedwater Nozzle Bypass Leakage Monitoring at Plant ML20196F7511999-06-24024 June 1999 Discusses 990622 Meeting with Public at Arbor Manor, Alburn,Ne to Provide Overview of Pilot Insp Program ML20209A7221999-06-23023 June 1999 Submits Revised Pages to Proposed Change to Plant TS Previously Submitted in ,Per 990615 Telcon with NRC ML20196F5331999-06-22022 June 1999 Forwards Examination Summary Rept for FW Nozzle Examinations Performed During 1998 Fall Refueling Outage at Cooper Nuclear Station.Rept Covers Past Examinations Up to & Including 1998 Fall Refueling Outage ML20196B4681999-06-17017 June 1999 Forwards TS Bases Changes Made at Plant Subsequent to Receipt of License Amend 178,dtd 980731,for Conversion to Its,Through 990610.List of Effective Pages for TS Bases, Encl ML20196E1411999-06-16016 June 1999 Forwards Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified ML20195H8891999-06-14014 June 1999 Forwards Response to NRC 990315 RAI Re GL 95-07, Pressure Locking & Thermal-Binding of SR Power-Operated Gate Valves, 180-day Response Submitted by District on 960213 ML20195F6171999-06-0909 June 1999 Informs That GE Rept, Matl Presented by GE 970709 Meeting at Cooper Nuclear Power Station Re Replacement of ECCS Pump Suction Strainers Between Nppd,Ge & NRC Staff, Will Be Withheld from Public Disclosure as Requested ML20207G3031999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure EPIP 5.7.1, Emergency Classification,Rev 24,under 10CFR50,App E,Section V Provisions.No Violations Identified ML20195E2351999-06-0808 June 1999 Forwards Response to NRC 990517 RAI Re Util Proposed Change to TS Re Calibr Frequency of Reactor Recirculation Flow Transmitters Associated with APRM ML20207G4481999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure,Epip 5.7.1, Emergency Classification,Rev 23 C2,under Provisions of 10CFR50,App E,Section V ML20207G3001999-06-0707 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station Ep,Rev 33,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required Based on Determination That EP Effectiveness Not Affected by Changes ML20207G4531999-06-0707 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure EPIP 5.7.1, Emergency Classification,Revision 25,under Provisions of 10CFR50,App E,Section V ML20207D3811999-05-27027 May 1999 Informs That During Next 6 to 12 Months,Starting 990530,NRC Plans to Conduct Insps Shown in Attached Insp Plan.Insps Include Both Planned Baseline & Supplemental Insps (Formerly Core & Regional Initiative Insps) ML20207A5191999-05-19019 May 1999 Forwards Insp Rept 50-298/99-04 on 990321-0501.Four Violations Identified & Being Treated as non-cited Violations 1999-09-30
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217N1931999-10-22022 October 1999 Forwards Insp Rept 50-298/99-12 on 990927-30.No Violations Noted.Insp Exam of Activities Under License as They Relate to Emergency Preparedness & to Compliance with Commission Rules & Regulations & with Conditions of License ML20217G8771999-10-14014 October 1999 Forwards Insp Rept 50-298/99-10 on 990920-24.No Violations Noted ML20217C2671999-10-0808 October 1999 Forwards Insp Rept 50-298/99-03 on 990823-27 & 0907-10.No Violations Noted.Purpose of Insp to Ensure That Licensee Had Effective Programs for Identifying,Evaluating & Correcting Problems Which Could Impact Safe Plant Operations ML20212K9661999-09-30030 September 1999 Forwards Safety Evaluation Accepting plant-specific Safety Evaluation Rept for USI A-46 Program Implementation at Cooper Nuclear Station ML20216J1081999-09-28028 September 1999 Ltr Contract:Task Order 048, Cooper Safety Sys Design & Performance Capability Insp, Under Contract NRC-03-98-021 ML20212J5061999-09-27027 September 1999 Forwards Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted.Inspectors Focused on Implementation of Licensee Reactor Safety & Emergency Preparedness Programs ML20212F3641999-09-22022 September 1999 Forwards Insp Rept 50-298/99-09 on 990823-26.No Violations Noted ML20212A6061999-09-14014 September 1999 Forwards Insp Rept 50-298/99-08 on 9900816-20.No Violations Noted.Insp Focused on Implementation & Effective Performance of Access Authorization/Fitness-for-Duty (Behavior Observation) Program & Access Control of Personnel ML20211F4661999-08-23023 August 1999 Discusses GL 98-01 Issued by NRC on 980511 & NPPD Responses for Cooper Nuclear Station & 990628 & Results of Visit to Plant on 990811-12.Staff Determined That Integrated Contigency Plan Incomplete & CNS Not Y2K Ready ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P6861999-08-0909 August 1999 Forwards Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted.During Insp,Inspectors Identified Two Issues Categorized as Being Low Risk Significance & within Licensee Response Band ML20210N1331999-08-0606 August 1999 Forwards Notice of Withdrawal of Application for Amend to FOL DPR-46.By Ltr Licensee Withdrew Amend Request Which Would Have Revised Usfar to Reflect as-built Configuration of Reactor Bldg Isolation Dampers ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210D2541999-07-21021 July 1999 Forwards Insp Rept 50-298/99-02 on 990628-0702.Purpose of Insp Was Primarily to Evaluate Effectiveness of Licensed Operator Requalification Program.No Violations Were Identified ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20209H8191999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear Station ML20209E6951999-07-12012 July 1999 Discusses Response to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Recommends Review of New Database Diskettes on Listed Website.Comments Due by 990901 or Data Entered Into Rvid for Plant Will Be Acceptable ML20209D8731999-07-0808 July 1999 Refers to 990707 Meeting Re Licensee Recent Maintenance Program self-assessment.Also Discussed How Licensee Incorporated Assessment Findings Into Rev of Maintenance Performance Improvement Plan.List of Attendees Encl ML20196J2471999-06-29029 June 1999 Discusses Completion of Licensing Action for GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, ML20196F7511999-06-24024 June 1999 Discusses 990622 Meeting with Public at Arbor Manor, Alburn,Ne to Provide Overview of Pilot Insp Program ML20196E1411999-06-16016 June 1999 Forwards Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified ML20195F6171999-06-0909 June 1999 Informs That GE Rept, Matl Presented by GE 970709 Meeting at Cooper Nuclear Power Station Re Replacement of ECCS Pump Suction Strainers Between Nppd,Ge & NRC Staff, Will Be Withheld from Public Disclosure as Requested ML20207G3031999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure EPIP 5.7.1, Emergency Classification,Rev 24,under 10CFR50,App E,Section V Provisions.No Violations Identified ML20207G4481999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure,Epip 5.7.1, Emergency Classification,Rev 23 C2,under Provisions of 10CFR50,App E,Section V ML20207G4531999-06-0707 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure EPIP 5.7.1, Emergency Classification,Revision 25,under Provisions of 10CFR50,App E,Section V ML20207G3001999-06-0707 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station Ep,Rev 33,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required Based on Determination That EP Effectiveness Not Affected by Changes ML20207D3811999-05-27027 May 1999 Informs That During Next 6 to 12 Months,Starting 990530,NRC Plans to Conduct Insps Shown in Attached Insp Plan.Insps Include Both Planned Baseline & Supplemental Insps (Formerly Core & Regional Initiative Insps) ML20207A5191999-05-19019 May 1999 Forwards Insp Rept 50-298/99-04 on 990321-0501.Four Violations Identified & Being Treated as non-cited Violations ML20206Q6171999-05-17017 May 1999 Forwards RAI Re 990301 & 10 Ltrs Re Proposed TS Changes to Calibr Frequency of Recirculation Flow Transmitters from Once Every 184 Days to Once Every 18 Months.Util Responses Should Be Provided within 30 Days of Ltr Date ML20206P0171999-05-12012 May 1999 Discusses GL 96-05 Issued on 960918 & NPPD Responses Submitted on 961118,970317,980504 & 990222 for Cooper Nuclear Station.Forwards Safety Evaluation Concluding That NPPD Adequately Addressed Actions Requested in GL 96-05 IR 05000298/19980091999-05-12012 May 1999 Refers to Insp Rept 50-298/98-09 Conducted Between 981227-990130.During Insp,Apparent Violation of 10CFR50.50 Identified & Being Treated as non-cited ML20206M1791999-05-11011 May 1999 Informs That NRC Ofc of NRR Reorganized Effective 990328. Reorganization Chart Encl ML20206H4191999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key,Encl for Info.Without Encl ML20206P8961999-05-0707 May 1999 Refers to Meeting Conducted at Region IV Office on 990506 Re Licensee Upcoming Rev to Strategy for Achieving Engineering Excellence & Plans to Achieve Performance Improvements.List of Attendees & Util Presentation,Encl ML20206H7541999-05-0505 May 1999 Forwards Insp Rept 50-298/99-01 on 990207-0320.Violations Being Treated as non-cited Violations ML20205R5541999-04-16016 April 1999 Submits Summary of 990330 Public Meeting in Brownville,Ne to Discuss Results of PPR Completed on 990211,which Allowed for Exchange on New Assessment Process,Current Performance Review & Upcoming Actions Taken in Response to Y2K Concerns IR 05000298/19980221999-03-19019 March 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/98-22 on 990107.Finds Reply Responsive to Concerns Raised in NOV ML20205E8991999-03-19019 March 1999 Advises of Completion of Plant Performance Review on 990209 to Develop Integrated Understanding of Safety Performance. Overall Performance Was Acceptable.Problems with Communication in CR Resulted in Several Minor Events ML20204D9451999-03-18018 March 1999 Forwards Insp Rept 50-298/98-09 on 981227-990206.Three Violations Identified & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy ML20207M9591999-03-15015 March 1999 Forwards Request for Addl Info Re Licensee Response to GL 95-07, Pressure-Locking & Thermal-Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear Station ML20204B6771999-03-15015 March 1999 Submits Withdrawal of Amend Request for Operating License DPR-46.Proposed Change Would Have Modified Facility TSs Pertaining to Neutron Monitoring Neutron Detectors ML20207M9811999-03-15015 March 1999 Advises That Which Withdrew 980415 Amend Request, Being Treated as Withdrawal.Proposed Change Would Have Modified Facility TSs Pertaining to Neutron Monitoring,Flow Biased Rod Block Monitor ML20204B3301999-03-11011 March 1999 Forwards SE Accepting Third 10-year Interval Inservice Insp Program Plan Requests for Relief Numbers RI-13,RI-17 & RI-25 for Plant ML20204B7061999-03-11011 March 1999 Requests Approval of Proposed Operability Criteria for Use in Evaluation & Interim Resolution of Degraded & Nonconforming Conditions with Piping & Pipe Supports at Facility ML20205A5811999-03-0909 March 1999 Forwards Exam Rept 50-298/99-301 for Exam Administered on 990212.Exam Included Evaluation of Four Applicants for Reactor Operator License ML20207K3231999-03-0808 March 1999 Discusses 990224 Meeting Re Staff Critique of Refueling & Equipment Outage RE-18 & Implementation Status of Improvement Strategy for Engineering.List of Attendees & Matl Used in Presentation Encl ML20202G1701999-02-0202 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam at Util Facility on 990407.Authorized Representative from Facility Must Submit Ltr Listing Names of Candidates ML20202E3121999-01-22022 January 1999 Forwards Insp Rept 50-298/98-08 on 981115-1226 & Notice of Violation.First Violation Re Staff Failure to Follow Procedures (Two in Operations,One in Maint & One in Plant Support) ML20199G6041999-01-19019 January 1999 Informs That Effective 990118,JN Donohew Has Assumed NRC Project Mgt Responsibility for Cooper Nuclear Station ML20199E1521999-01-0707 January 1999 Forwards Insp Rept 50-298/98-22 on 981116-1208 & Notice of Violation Re Lack of Effective Oversight by Plant Mgt 1999-09-30
[Table view] |
Text
-___
REDISTRIBUTED DUE l' . . TO COPY ERROR May 31, 1989 Docket ho. 50-298 Pr. George A. Trevors, Division Manager - Nuclear Support Uctraska Public Power District Fost Office Ecy 499 Columbus, Nebraska 08601
Dear Mr. Trevors:
SUBJECT:
SAFETY EVALUATION FOR GENERIC LETTER 83-28, ITEM 4.5.3 (REACTOR TRIP SYSTEP FUNCTIONAL TESTING FOR GE, CE, B&W, AhD K PLANTS) F0F COOPER NUCLEAR STATION (TAC NO. 53973)
The NRC staff has completed its review of Item 4.5.3, " Reactor Trip System functicnal Testing," in Generic Letter (GL) 83-28. With respect to Item 4.5.3, the licensee was to confirm that the reactor trip system testing intervals are consistent in achieving high reactor trip system availability. For item 4.5.3, the staff reviewed the Owners Group analyses, including the Ger.eral Electric Owners Group, and found that existing intervals are censistent with achieving high reactor trip system availability and are acceptable.
This cornpletes the staff's action for Item 4.5.3 of GL 83-28. Item 4.5.2 was previously reviewed by the staff and its acceptability was documented in our safety evaluation dated January 27, 1989. Copies of the staff's related safety evaluation and the Technical Evaluation Reports prepared by the staff's contractor, Idaho National Engineering Laboratory, are enclosed.
Sincerely,
/s/
Paul W. O'Conncr, Project Manager Project Directorate . IV ,
Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Enclosures:
As stated cc w/ enclosures:
See next page DISTRIBUTION Docket File NRC PDR Local PDR PD4 Reading G. Holahan L. Rubenstein F. Hebdon P. Noonan P. O'Connor OGC-Rockville E. Jordan B. Grimes ACRS(10) PD4 Plant File PD4/PM fd PD4/0Q PD4/LA PNoorar b'. P0' Conner:sr FHebdon 05/3/89 05/3 0/89 05 A /89
~
/g
/ Yr
/ b Q
( gc106 0 60ll L -
g
- --- i
+
/ pa tscg'o, UNITE D STATES E < m ']
- ' s NUCLEAR REGULATORY COMMISSION W ASHINGT ON, D. C. 20$$$
t i May 31, 1989 o,
gw.....f Docket No. 50-298 Mr. Gecrge A. Trevors, Division Ma'.6ger - Nuclear Support Nebraska Public Power District Post 0.'fice Box 499 Columbu;, Nebraska 68601
Dear Mr. Trevors:
SUBJECT:
SAFETY EVALUATION FDR GENERIC LETTER 83-28, ITEM 4.5.3 (REACTOR TRIP SYSTEM FUNCTIONAL TESTING FOR GE, CE, ,
B&W, AND W PLANTS) FOR COOPER flVCLEAR STATION (TAC NO. 53973)
The t;FC staff has corr.pleted its review of Item 4.5.3, ' Reactor Trip System FunctionalTesting,"inGenericLetter(GL)83-28. With respect to Item 4.5.3, the licensee was to cenfirm that the reactor trip system testing intervals are censistent in achieving high reactor trip system availability. For iten 4.5.3, the staff reviewed the Owners Gro a analyses, including the General Electric Owners Group, and found that existing intervals are consistent with achieving high reactor trip system availability and are acceptable.
This completes the staff's action for Item 4.5.3 of GL 83-28. Item 4.5.2 was previously reviewed by the staff and its acceptability was documented in our safety evaluation dated January 27 1989. Copies of the staff's related safetyevaluationandtheTechnicalEvaluationReportspreparedbythestaff's contractor, Idaho f ational Ergir.eering Laboratory, are enclosed.
Sincerely, Paul W. O'Connor, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Enclosures:
As stated cc w/ enclosures:
See next page i
4
-.._..____--_-A
l 4
j c
Mr. George A. Trevcrs Nebraska Public Power District Cooper Nuclear Station cc: 1 Mr. G. D. Watson, General Counsel l
Nebraska Public Power District 1 P. O. Box 499 Colurbus, Nebraska C8601 Cooper Nuclear Station ATTN: Mr. Guy R. Horn, Division Manager of Nuclear Operations P. O. Box 98 Brownville, hebraska 68321 1
Dennis Grams, Director i Nebraska Departnent cf Environmental l Ccrtrol i P. O. Box 9892^ '
Lincoln, Nebraska 685C9-8922 i Mr. Larry Bohlken, Chairman 1 Nemaha County Board of Commissioners I Nehaha County Courthouse 1824 N Street Auburn, Nebraska 68205 1 Senior Resident Inspector U.S. Nuclear Regulatory Comission P. O. Box 218 Brownville, Nebraska 68321 Regional Administrator, Region IV 1 U.S. Nuclear Regulatory Comission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Mr. Harold Borchart. Director Division of Radiological Health ;
Department of Health 301 Centennial Hall, South P. O. Box 95007 Lincoln, Nebraska 68509-5007