Ack Receipt of ,Notifying NRC of Planned Change to Commitment Made in ,In Response to Issues Identified in Insp Repts 50-373/96-11 & 50-374/96-11
ML20247N836
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 05/15/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
References
50-373-96-11, 50-374-96-11, NUDOCS 9805270236
Download: ML20247N836 (2)


See also: IR 05000373/1996011

Text

_

-

- --

-

- -

WDhDC[2>

May 15, 1998

l

Mr. Oliver D. Kingsley

President, Nuclear Generation Group

l-

Commonwealth Edison Company

i

ATTN: Regulatory Services

l

Executive Towers West til

i

1400 Opus Place, Suite 500

Downers Grove,IL 60515

SUBJECT:

REVISION OF RESPONSE TO INSPECTION REPORT 50-373/96011;

50-374/96011 REGARDING SERVICE WATER TUNNEL SAFETY

CLASSIFICATION UPGRADE

Dear Mr. Kingsley:

This acknowledges receipt of your letter dated April 24,1998, notifying us of a planned change

to a commitment made in your letter dated December 20,1996, in response to issues identified

in NRC inspection report 50-373/96011; 50-374/96011. In your original response, you indicated

that the 36-inch pipes and the manual isolation valves to the service water tunnel would be

upgraded in safety classification. However, during the course of the evaluation of the upgrade,

you determined that the upgrade had no benefit since the evaluation revealed that the 36-inch

pipes were located downstream of the nonsafety-related, non-seismic traveling screens.

We have reviewed your change to the response originally submitted and have no further

questions at this time. This change will be examined during future inspections.

Sincerely,

original /s/ by J. A. Grobe

John A. Grobe, Director

Division of Reactor Safety

Docket Nos.: 50-373;50-374

License Nos.: NPF-11; NPF-18

Enclosure: Ltr dtd 4/24/98 from F. Dacimo,

Comed to USNRC

See Attached Distribution

,

DOCUMENT NAME: G:\\DRS\\LAS05158.TY

\\

1

To receive a co py of this document, indicate in the box *C' = Copy w/o attach /enci *E' = Copy w/ attach /enci "N" = No copy

OFFICE

Rill

JN

Rlli

h

f\\,4tlli

C

Rlli aW,l

NAME

Duncan:sd4

Jacobsor)^ W g h Hills //./(4H pot

Grolife ff

DATE

5/p /98

5/6 /98 (

Jh

5/ir/98

5/1579 8/

'

OFFICIAL RECQRD COPY

/

9805270236 980515

-

PDR

ADOCK 05000373

?

G

PM

l

Z E01

~

.

. O. Kingsley

2

l

L

,

cc w/ encl:

M. Wallace, Senior Vice President

D. Helwig, Senior Vice President

G. Stanley, PWR Vice President

J. Perry, BWR Vice President

l

D. Farrar, Regulatory

' Services Manager

'

I.' Johnson, Licensing Director

. DCD - Licensing -

F. Dacimo, Site Vice President

T. O'Connor, Station Manager

l

P. Bames, Regulatory Assurance

Supervisor

Richard Hubbard .

Nathan Schloss, Economist

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce

Commission

Distnbution:

Project Mgr., NRR w/ encl

A. Beach w/enci

J. Caldwell w/enci -

B. Clayton w/enci

SRI LaSalle w/enci

' DRP w/ encl

TSS w/enci

DRS w/enci

Rlil PRR w/ encl

PUBLIC IE-01 w/enci

Docket File w/enci

GREENS

!

l

m

,

i.ommonw cann uh,on o>mpan>

{

,.

Imalle Generating Station

2wI Nonh 2 bt Road

,

i ,j

Wrwilic=. II (il 4 4 lar%-

l

1 ci m 4s .<, <,i

i

PRIORITY ROUTitC

_

First

f*H4

RA

N

RC

/

DRA

\\ EfC/

DRP

\\ 26A

!

' April 24,1998

>

DRS

/'D.

OtWS / }PhD

United States Nuclear Regulatory Commission

DRMA/

\\

Attention: Document Control Desk

j

Washington, D.C. 20555

FILE

Subject:

Clarification to System Operational Performance

Inspection, (NRC Inspection Report No. 50.373/96011

(DRS); 50-374/96011(DRS))

LaSalle County Station, Units 1 and 2

Facility Operating License NPF-11 and NPF-18

NRC Docket Nos. 50-373 and 50-374

References:

1.

G. E. Grant Letter to W. T. Subalusky, dated

!

November 15,1996, Transmitting NRC

l

Inspection Report 50-373/374-96011

2.

W. T. Subalusky to U. S. NRC letter dated

December 20,1996, transmitting LaSalle

,

County's response to NRC Inspection Report

{

50-373/374-96011

l

l

In the Reference 2 letter, LaSalle County stated that the 36-inch pipes and

the manual isolation valves to the Service Water Tunnel were being

,

upgraded in safety classification.

I

l

During the course of evaluating the upgrade, it was determined that the

I

upgrade had no benefit. The evaluation showed that the 36-inch pipes were

located downstream of the non safety related, non-seismic traveling water

screens. The traveling water screens are not supplied from essential

)

busses, which would result in their loss of function during a loss of offsite

power. Therefore, no credit is taken for the 36-inch pipes for supplying

safety related service water following a loss of offsite power event.

Additionally, the upgrade of the 54-inch CSCS Bypass line and associated

valve to safety related status is adequate to ensure a safety-related supply

of cooling water to the plant. Based on this, upgrading the commercial

grade components currently installed on the 36-inch inlet lines to the Service

Water Tunnel is not technically justified and LaSalle will not upgrade the

safety classification of the 36-inch inlet lines.

1

MAY 0 6 tD3

3 i n,o m i omn.nn

~

D

{

.

'

'

,,' . .e

-.

'LaSalle Station is on sch d l to complete the upgrade of the 54-inch CSCS

e ue

bypass line to safety-related status prior to Unit 1 restart.

If there are any questions or comments concoming this letter, please refer

them to Harry Pontious, Regulatory Assurance Manager, at (815) 357-6761,

extension 2383.

Res

ully,

,

)uk-

Fred Dacimo

Site Vice President

LaSalle County Station

VA. B. Beach, NRC Region lil Administrator

ec:

i

M. P. Huber, NRC Senior Resident inspector - LaSalle

D. M. Skay, Project Manager - NRR - LaSalle

F. Niziolek, Office of Nuclear Facility Safety - IDNS

9

4

1

4

1

4

9

9