_ _ - _ _ _. _
e f "Gg UNITED STATES y.(
,ft NUCLEAR REGULATORY COMMISSION REGloN IV j
Sg g
611 RYAN PLAZA DRIVE, SUITE 400 0
ARLINGTON, TEXAS 76011-8064 g.... #
May 22, 1998 Otto L. Maynard, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, Kansas 66839
SUBJECT:
SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP)
REPORT 50-482/98-99
Dear Mr. Maynard:
Enclosed for your review is the SALP report for the Wolf Creek Generating Station, for the period April 6,1997, through April 18,1998. A public meeting to discuss this report with you and your staff has been scheduled at the Dwight D. Eisenhower Leaming Center on June 17,1998, at 9 a.m. (CDT). During this meeting, you are encouraged and expected to candidly comment on our report. Although this meeting is a forum between Wolf Creek Nuclear Operating Corporation and the NRC, it will be open to observation by members of the public and other interested parties.
In accordance with NRC's policy, I have reviewed the recommendations of the SALP Board and concur with their ratings and views. The functional areas of Operations, Maintenance, Engineering, and Plant Support were each rated as Category 2, reflecting overall good safet/
performance.
In the Operations area, competent performance by the control room staff was noted during both routine and nonroutine activities. Improvements were noted in the formality by which control room activities were conducted. Management continued to work on establishing high performance standards at all levels of the Operations organization and then ensuring that these standards were applieo io all site activities.
Performance in the Maintenance area has improved, with the overall material condition of the plant considered to be very good. The skill of the individual craft continued to be noteworthy; however, during surveillance activities, there were a number of instances of procedural noncompliance and procedural inadequacy, problems noted in the previous SALP assessment.
Performance in the Engineering area improvea during this assessment period and was considered to be good, due in part to strong involvement of system and design engineers in maintaining system performance, improvements in engineering information systems, and thorough self-assessments. While initiatives were undertaken to sustain these performance improvements, inconsistency in the quality of support provided to operations and maintenance remains a challenge.
k In the Plant Support area, it was determined that all constituent sub-areas were, on the whole, performing well. The radiation protection program was well managed and effective, as was the 9905270232 990522 f
PDR ADOCK 05000482 G
PM I
L.;
Wolf. Creek Nuclear Operating Corporation ' emergency preparedness area; however, the classification of emergencies, based on plant
' conditions, continued to challenge operators. Security continued to perform at a high level and improvement was noted in the area of fire protection.
- The ability to self-diagnose and correct problems was noted to be an area of site-wide focus.
Extensive training was provided to all site personnel as part of the overall efforts to reduce human performance orrors. The implementation of a Corrective Action Review Board has helped to improve the quality of corrective actions developed to address problem areas. While
, improvement initiatives in this area are apparent, the extent of their success has yet to be determined.
It should be noted that this assessment period was reduced to a 12-month period to evaluate the engineering performance shortcomings that were identified during the previous SALP report.
Also, two special inspections and three public meetings were held to focus on specific engineering issues. Altogether, this allowed the NRC to develop additional and timely insights.
into WCNOC engineering performance.
In accordance with Section 2.790 of the NRC's " Rules of Practice," a copy of this letter and the SALP report will be placed in the NRC Public Document Room. Should you have any questions or comments, I would be pleased to discuss them with you.
Sincerely, Ellis W. Merscho Regiornal Admi rator Docket No.: 50-482-License No.: NPF-42
Enclosure:
SALP Report 50-482/98-99 j
cc w/ enclosure:
I Chief Operating Officer -
Wolf Creek Nuclear Operating Corp.
' P.O. Box 411 Burlington, Kansas 66839 l
Jay Silberg, Esq.
)
. Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW Washington, D.C. 20037 3
4 Wolf Creek' Nuclear Operating Corporation Supervisor Licensing l
Wolf Creek Nuclear Operating Corp.
P.O. Box 411 Burlington, Kansas 66839 i
Chief Engineer
' Utilities Division Kansas Corporation Commission
. 1500 SW Arrowhead Rd.
Topeka, Kansas 66604-4027 Office of the Govemor.
State of Kansas Topeka, Kansas 66612 Attomey General l
Judicial Center 301 S.W.10th 2nd Floor Topeka, Kansas 66612-1597 County Clerk
' Coffey County Courthouse
' Busiington, Kansas 66839-1798 Vick L. Cooper, Chief Radiation Control Program Kansas Department of Health and Environment Bureau of Air and Radiation I
Forbes Field Building 283 Topeka, Kansas'66620
- Mr. Frank Moussa Division of Emergency Preparedness 2800 SW Topeka Blvd Topeka, Kansas 66611-1287 O
n
\\.
Wolf Creek Nuclear Operating Corporation E-Mail report to T. Frye (TJF) 7 l
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK) bec to DMB (IE40) bec distrib. by RIV:
Regional Administrator Resident inspector DRP Director SRI (Callaway, RIV)
Branch Chief (DRP/B)
MIS System Project Engineer (DRP/B)
RIV File Branch Chief (DRP/TSS)
Records Center, INPO The Chairman (MS: 16-G-15)
Deputy Regional Administrator Commissioner Dicus RIV PAO Commissioner Diaz Director, DRP Commissioner McGaffigan SRis at all RIV sites L. J. Callan, EDO (MS: 17-G-21)
B. Murray, DRS/PSB Associate Dir. for Projects, NRR C. A. Hackney Associate Dir. for Insp., and Tech. Assmt, NRR Carol Gordon SALP Program Manager, NRR/lLPB (2 copies)
W. H. Bateman, NRR Project Director (MS: 13E17)
K. Thomas, NRR Project Manager (MS: 13E16) 4 i
DOCUMENT NAME: R:\\_WC\\WC899SF.WDJ To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:C:DRP/B DD:DRP D:DRS NRR:PDIV-2 WDJohnson*
KEBrockman*
ATHowell*
WHBateman
- 5/15/98 5/15/98 5/15/98 5/15/98 (T) muunummmmagummu 1
mimmu
/
RA []
DRA JEDyer F' EWldMhoff Di d SE$98
- previously concurred OFFICIAL RECORD COPY
]
i
______________________-_a
W g
i 4
i
. Wolf Creek Nuclear Operating Corporation ;
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (! PAS)
E-Mail report to Document Control Desk (DOCDESK) bec to DMB (IE40) l bec distrib. by RIV:
Regional Administrator Resident inspector CRP Director SRI (Callaway, RIV)
Branch Chief (DRP/B)
MIS System Project Engineer (DRP/B)
RIV File Branch Chief (DRP/TSS)
Records Center, INPO The Chairman (MS: 16-G-15)
Deputy Regional Administrator Commissioner Dicus RIV PAO Commissioner Diaz Director, DRP i
Commissioner McGaffigan SRis at all RIV sites i
L. J. Callan, EDO (MS: 17-G-21)
B. Murray, DRS/PSB Associate Dir. for Projects, NRR C. A. Hackney l
Associate Dir. for insp., and Tech. Assmt, NRR Carol Gordon j
SALP Program Manager, NRR/lLPB (2 copies) i W. H. Bateman, NRR Project Director (MS: 13E17)
K. Thomas, NRR Project Manager (MS: 13E16)
I
!70127 DOCUMENT NAME: R:\\_WC\\WC899SF.WDJ To receive copy of document, indicate in box: C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:C:DRP/B DD:DRP -
D:DRS NRR:PDIV-2 WDJohnson*