ML20247M654
| ML20247M654 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 03/08/1989 |
| From: | Earnestine Clay, Mcalpine E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19297H476 | List: |
| References | |
| 70-1113-89-01, 70-1113-89-1, NUDOCS 8904060097 | |
| Download: ML20247M654 (1) | |
Text
_ - - _ _ -
r i
'a, 3
~..
^
.W Yj H ',... pn nco%' i UNITED STATES.
.p
...,g :c.
. NUCLEAR REGULATORY COMMISSION i
p N' '
h.
i (IEGION 11
'5'
~ :
g - ;.
k
{ y:
101 MARIETTA STREET, N.W.
's
, ATLANTA, GEORGI A 30323
%[;$
$$$Q w,jn J
g l
4 a
t x
Report No.:- 70-1113/89-01
~
[
Licensee: General Electric Company 4
Wilmington NC 28401 4
Docket No.: 70-1113 m
Facility Name: Nuclear Fuel andLComp'onent Manufacturing Inspection Conducted: January 9-13, 1989 Inspector:
bi I/d/09 E.L. Clay,SafeguardsEngineer Date S~1gned Approved By:
M' @
3 MIN 9 E. J. McAlpine, Chief U Date Signed Material Control and Accountability Section Division of Radiation Safety and Safeguards'
SUMMARY
Scope: 'This-routine, unannounced inspection was conducted at the site in the areas of measurement systems and MC&A system management and assessment.
Results: No violations or deviations were identified.
The facility Labortory Enrichment Analyzer system is performing measurements, using calibrations-based upon reference standards, which ' were capable of substantiating the quantities of U-235 isotope measured. The facility management structure 'is functioning effectively as defined in their approved FNMC plan and the facility's independent assessroents of the MC&A program did not. reveal regula-tory deficiencies.