ML20247M620
Jump to navigation
Jump to search
| ML20247M620 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 01/04/1989 |
| From: | Gido R LOS ALAMOS NATIONAL LABORATORY |
| To: | Guo J NRC |
| Shared Package | |
| ML20246A841 | List: |
| References | |
| CON-FIN-A-7272 NUDOCS 8906050090 | |
| Download: ML20247M620 (1) | |
Text
. _ - _
. i,7, &
>y; ;
y y
s 4mN M
-Q January 4, 1989 1
a amm ""*
N-6-89-297 (R969) 5 LosAlamosNahonalLaborat K557 l.os Alamos,NewNico 87*
505/667-0505 FTS/843-0505 y,
Engineering Analysis
=
w r k.
Mr. J. S. Guo White Flint North Room BD1 US Nuclear: Regulatory Commission Washington, D.C.
20555 3
i
Dear Mr. Guo:
.y
SUBJECT:
Haddam Neck Combustion Gas Control C0 GAP Analysis k
Enclosed is our letter report on the subject analysis.
Please contact me if you have any questions or coments about this or any other matter.
Sincerely.
C trh
).
^'
s i
R. G. Gido RGG/odrg.
Cy:
'H. E. Polk, NRC A
C. G. Tinkler NRC R. J. Bohl, N-DO, MS K560 L. H. Sullivan, N-6, MS K557 W. S. Gregory, N-6, MS K557 CRM-4 (2), MS A150 N-6 File 1
i e
pwsxm 4A Jp-
=
w M
_ _ _ _