Advises That Closed Circuit Television Camera Installation at Intake Structure Will Be Completed on 890929 Instead of 890731,per 890127 Commitment Re Security Violations.Delay Due to Extension of 1989 Refueling Outage.Encl Withheld
ML20247M455
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 07/26/1989
From: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8908020111
Download: ML20247M455 (2)


Text

,

j

l SAFEGUARDS INFORUlATION f

m amm mumm T

m.m C ortand GeneralElectricCorprsyy P

David W. Cockfield Vice President. Nuclear July 26, 1989 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555

Dear Sirs:

Closed Circuit Television (CCTV) camera installation at the Intake Structure By letter dated January 27, 1989, in response to a Notice of Violation (NOV) concerning Security violations, Portland General Electric Company (PGE) committed to install additional CCTV cameras at the Trojan Intake Structure. At the time of this response, the work was scheduled to be completed by July 31, 1989.

In order to perform this work, it is necessary to transfer the functions of the Trojan Central Alarm Statiun (CAS) and Secondary Alarm Station (SAS) to alternate locations. Due to a Fuclear Regulatory Commission (NRC) concern regarding how this would be accomplished (subsequent to the NOV response),

it was decided that the modifications would be completed following restart from the 1989 refueling outage.

The purpose of this it ? ter is to notify you that due to the extension of the 1989 refueling outage, the CCTV camera installation at the Intake Structure will not be complete by July 31, 1989.

Based on the current restart schedule, it is expected that this work will be complete by September 29, 1069.

      • SAFEGUARDS INFORMATION ***

Unclassified When separated From Safeguards Information 8908020111 890726 Q

PDC

{00 [/

PDR ADOCK 05000344 m <s m ss m m, m

,a L

.SAEEGUARDS INFORMATION Portland GeneralBedricCormany i

Document Control Desk July 26, 1989 Eagg 2 In addition, Attachment 1 to this letter provides a detailed description of the planned compensatory measures and alcernate CAS and SAS locations while this work is being performed. This work will not result in a degradation of Security Program effectiveness, and PGE will continue to be in compli-ance with all applicable regulatory requirements.

Sincerely, Attachment c:

Mr. John B. Martin l

Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr.

R.,

C. Barr NRC Resident Inspector Trojan Nuclear Plant l-l l

      • SAFEGUARDS INFORMATION ***

Unclassified When Separated From Safeguards Information

- _ _