Text
.-
UNITED STATES 1
g
. g n
NUCLEAR REGULATORY COMMISSION
]g zo L 3 ij
- r!ASHINGTON, D. C. 205$5
\\...../
September 12, 1989
. MEMORANDUM FOR: Charles E. Rossi, Director Division of Operational Events Assessment Office of Nuclear Reactor Regulation FROM:
Carl H. Berlinger, Chief Generic Communications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation
SUBJECT:
AUGUST MEETING WITH ROSEMOUNT REGARDING t' MALFUNCTIONS OF ROSEMOUNT TRANSMITTERS The Generic Communications Bra'ich (0GCB) and the Instrumentation and Control Systems Branch (SICB), with support from the Vendor Inspection Branch (VIB),
met with Rosemount, Incorporated, and several industry representatives to further. discuss the loss of oil malfunctions of Rosemount models 1153 and 1154 pressure and differential. pressure transmitters and the status of the Rosemount program to address this issue. A listing of the meeting attendees and the meeting agenda are provided in Enclosures 1 and 2 respectively.
I began the meeting by reiterating NRC's perspective on the issue and stating that this meeting was intended to update the NRC and the industry on the status of the Rosemount program to address the loss of oil issue.
In addition, I commented that progress on the resolution of this issue has been slower than anticipated.
I urged Rosemount and other industry representatives to increase their efforts on addressing and resolving this issue in a timely manner.
Mr. Steve Wanek, Vice President, Operations, as well as other Rosemount repre-sentatives, presented additional information on the loss of oil malfunctions and the test results that have been compiled during the last several months. provides the slides presented by Rosemount during their presenta-tion. Mr. Wanek reiterated Rosemount's commitment to resolve the loss of oil issue as quickly as possible and to support their customers in addressing these potential malfunctions.
Rosemount commented that their test program is making progress and as a result they have issued two technical bulletins to their customers that provide test program results and that a third bulletin is expected to be issued within the CONTACT: Jack Ramsey, NRR q
$D' A,l (301)492-1167 ses R8'"888"4 ERP" NRC FILE CENTER COPY PNU
' Charles E. Rossi september 12, 1989 s
4 next few weeks.
In addition, Rosemount indicated that they plan to begin preparing and distributing for comment draft guidelines, diagnostic procedures, and recommendations for identifying and monitoring potentially defective transmitters to their customers in October 1989.
Once comments are received, these guidelines, procedures, and recommendations will be issued to customers so that they may take appropriate actions at their respective plants to resolve the loss of oil issue.
Rosemount added that they have instituted additional quality control and quality assurance steps in the manufacturing process that they believe minimizes the potential for transmitter malfunctions due to a loss of oil. As a result, Rosemount stated that all transmitters manufactured after July 11, 1989, are not subject to the 10 CFR Part 21 notification issued in May 1989 regarding potential transmitter malfunctions due to a loss of oil.
Mr. Paul Blanch, Chairman of the BWR Owners' Group (BWROG) Subcommittee on Rosemount Transmitters, presented a brief overview of the subcommittee's plans and objectives. provides the slides presented by Mr. Blanch.
He stated that the subcommittee met on August 22, 1989, and plans to address this issue in two major phases.
Phase I will consist of gathering and evaluating industry data, understanding the failure mechanism, and identifying the failure population.
Phase 2 will consist of detecting failures and developing guide-lines for addressing potentially defective transmitters. Mr. Blanch added that the BWROG has been working with Rosemount on the loss of oil issue and they 1
will continue to work together until this issue is resolved.
The NRC will continue to monitor Rosemount and industry progress on this issue and continue to consider regulatory action if it is deemed necessary.
Original Signed By Carl H. Berlinger Carl H. Berlinger, Chief Generic Communications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation
Enclosures:
1.
Meeting Attendees 2.
Meeting Agenda 3.
Slides Presented by Rosemount 4.
Slides Presented by P. Blanch cc: Steve Wanek, Rosemount Paul Blanch, Northeast Utilities Joe Weiss, EPRI Ray Fain, Analysis and Measurement Service Corporation DISTRIBUTION w/ enclosures FJMiraglia, NRR CERossi, NRR JZwolinski, NRR JGuillen, NRR CHBerlinger, NRR EWBrach, NRR BRaymond, RI AThadani, NRR SNewberry, NRR
{
JMauck, NRR VThomas, NRR CHaughney, HRR j
l KNaidu, NRR JACalvo, NRR JRamsey, NRR l
JRamsey R/F PDR Central files' l
l DCS DOEA R/F OGCB R/F JGuil
.n R/F OGCB,0.A:NRR CGCB' OEA:NRR C/SI
- DEST:NRR C/0GCB:D0EA:NRR JGui len JRam ey SNeherry CHBerlinger l
08/M 89 09/$/89 09/$/89 09/#/89 l
)
MEETING WITH ROSEMOUNT REGARDING MALFUNCTIONS OF ROSEMOUNT TRANSMITTERS WEDNESDAY AUGUST 23, 1989 WHITE FLINT 2-F-17 NAME ORGANIZATION TELEPHONE l
J vk e-f. \\_Cyi _.__ _ Mb N
-@Cb
.bD__1 1_^..Uk_i.
j 2ou'me b il\\tn N S-d (Sbb ' OC b -
b%O_$11GO
.. _ __ [
. N.% %.l.OCa h
.. 1300 A G : O W _.
Dob mse3
..(QEC.-
c Jctme> 0. Oe6 k rncin _
__.._c53~/&:grg.f.lert.
._h.u )_.159 -$ 73 7a CE'l I EAb d TBa.Ku.._...d & E4'V-CB___.
_30t 29.2 -pt79 Doncdch ?. Richurca 3Fio /Pilyim.-
.-.. 6G - 8.49 - 663'7 b
T*. h @ l _.._.
. _ N.' k S%'53.*thwna..
3.\\'l).64'Z ' M ?
Y kV5.b YPD'hil1
_. SEAcys'teceng&clht
~5 or - 2.s a - goho.
SoncaA E. Regers
_. T V&.1.i_ n s,'n sis-3ss_ n52 Yr DUK' Ak, llse
[LIA b/ s ~ 7S! - 4 7 yL 6 e R M r=:s s a beeAm w - s, s -n>2
&ay u %s6 za/Be sy..
Jos) vs 3ta'1
!. c-,L v c sentrA fvA /tSrP GM-632-f613 llin Yl%N
.. S!M ONDIRC 6G).
_..$7!03b8~_?/33 4 - r a % e h i-zww., La ceuana) _
m wem um JAch C11REV PSElG HOPE CrTEY6 609-337-4'93'l Meln) t h e m />
/Sc 46 6ci-5st-444/
SL L~~
N.,,
%g u - m-209 3rtru 7 d h M G(y ra w M k 2c'2#i[oS-l7k m
Ly.
C= wt_
we fac_y cAk
.3c i - o n-c yn S.s O-n...n 7$,e n /. fc-x 30, 2 w z < re u~ar u.
Yousisesn; cs
. _.. _ 4'ss-9z s-i ro e Y
Y'Y -
$S
_.lh'?.9)fl.G-S30
~
t m a ra.,
-n ~ as~
- su me
- T~..
. : L.:- +
' l,L'I
"'b c' O '
l-(
/- [ [, *I 8[r[
l 26; f J.? /
/
t
MEETING WITH ROSEMOUNT REGARDING MALFUNCTIONS OF ROSEMOUNT TRANSMITTERS WEDNESDAY AUGUST 23, 1989 WHITE FLINT 2-F-17 NAME ORGANIZATION TELEPHONE ne J. 4gox__ _ _
sur-ea w ear 6, c m - m o.__ _
._ h.wm crar tesiftss-nsa
&c)L Yd6 f9tl..
,& rs e~'>s^ h (bI2) AW:MZy
~
%ww
.. _..... J%.c ~ 4 k'% 9 * - 1 1 o k _..
. _ ES
@ud...._..
00 sew?
.)* _N - R 91
. TERT.y ktaat--.....-._.
. Ruuwnr.=.wauuwr _ _ c a. - ea.e-ayy i -....
/i E L mLs.
. _ i,s /t%lm:. L.wl
__su g2.-21@
.l.WCC 0.
c HAS. __
//_4Cl.5 !.C 6.-. _.
3afrt/f2.Q Zf(
M 1.vh sa./ ace r e - v n-a u: -/ _ _..
_ __JerrYrtSawcj__.
... Xos
...zawes.
(a si M S k (d o o D~a r ac ei wa
- m - m..g w w w
~
Swb l'G-31%' M %G n$xkw<-U _...-_
SE..__.
VOT' fkr-lL1i PAUL. R W /cf.l hhtsca
& & f/f-d'/JV 19yecJhuan Atme?am saia cv (6u,Ls.n-mr
] vie.fina
. _.. ifukyse no n&pswu& ale. A/C Hi-/?a h i $ Sci $.. _
E 6.il. _.
..... J os 2 6 o f.o 3 f b
r
- t. h,u.
E4.aM, La
..._ _ __ e n a sue
' e.a>u-b, v2
_. ___ _ _.. _ 9# - 6 6 / - 6 $/ 6 /
hah 9. %qs-() s e t G -
w ~ ps-vaca
$*TCS Viu;,,
1 J64 bt1 -009-O ["
0
}kn }dcJ. TBC C-Nf_.b 7
db :Sem yegL
_ 91-m -am
$w& ZO
_ A PO. Ala.eha e Doi 58.- 7 Suy Pihicid%vwm C4sw-w w-n sny cr r
C. %s.RL.vw uu%
zo 3 - sc.r-SW <
s u M te p a v bdM zoi-as8-34 n
_ __ __ L
1 j
)
MEETING WITH ROSEMOUNT REGARDING MALFUNCTIONS OF ROSEMOUNT TRANSMITTERS WEDNESDAY AUGUST 23, 1989 WHITE FLINT 2-F-17 NAME ORGANIZATION TELEPHONE 3
sa J:a i
~nuan-u, m a fiD_'
aw'a~~;
GLa) seews_
~
=
l Ke s D Am.......... -Adrsid.nbue-niiaat-.
isss -sze--..... _...
.e-
-e p+ e eedom e
me m W-p amp w e w,aw s.p.e 4 pas m em
.hmenopspeu.< ge g-p N
e m.
pg.a de a
.e em ___
_.e. - -
p-e.
e.
e e m sum.glspuesne-e -
6+
eewee e
oss e
e N+h*9 W M e6.
- gs -_
e.amew eapp e
e em.m ee Nap sww 9 69 93-h*
Ge =*
w e-e eeew e,
m,
,e nem h
.--se m +
+m e
m w
=
e O
eas e
++srums-e M
es eetuse e s e ts.
m e
-O eh W-+
, die es e e.
ges ween n Owhm,
- g. hm w mesp. eem
~m
- e6 e6 ede h
e
==
=
m.mme-em.
ae
+
ess.
e.
e==,
,*m..
= emmass
--e=
ese W -
m.
- e me e
em.m a eh w
ye h.- a g e.g
- ea hgW e
6 "W
M unEW*.
W
- e M-4 6e eegm-w ee si emp y
e
==un m.-
- e h eem>=- e m.ee w=-.
=
.e
=
gy a
hw e
M h ewu he WO.
9 l
w w*--
M
-w eM
.m a
e eme p
- P e~-
e
Er:dlosure 2 s
e MEETING WITH ROSEMOUNT REGARDING MALFUNCTIONS 0F ROSEMOUNT 1153 AND 1154 TRANSMITTERS 1
l
' AUGUST 23, 1989 l-WHITE FLINT 2-F-17 9:00 A.M.
CARL H. BERLINGER, NRC l
L INTRODUCTION OF ATTENDEES BRIEF INTRODUCTORY REMARKS-9:15 A.M.
- STEVE WANEK, ET AL., ROSEMOUNT BRIEF REITERATION OF ROSEMOUNT TRANSMITTER PROBLEMS (NUCLEAR AND NON-NUCLEAR APPLICATIONS)
DISCUSSION ON NEWLY REPORTED FAILURES
- 1 PRESENT HIGHLIGHTS OF TESTING PROGRAM RESULTS j
~
OVERVIEW OF THE MAY 1989 AND JULY 1989 TECHNICAL BULLETINS DISCUSSION ON UTILITY PROBLEMS IN IMPLEMENTING BULLETIN RECOMMENDATIONS DISCUSSION OF CHANGES TO MANUFACTURING PROCESS (QA/QC/ TESTING)
DIRECTION OF FUTURE TESTING PROGRAM LONG TERM ACTIONS TO RESOLVE TRANSMITTER DEFICIENCY I
12:15 P.11.
LUNCH 1:30 P.M.
MEETING ATTENDEES i
OPEN DISCUSSION (POSSIBLE PRESENTATION BY BWR OWNERS GROUP SUBCOMMITTEE) 3:30 P.M.
CARL H. BERLINGER, NRC CLOSING REMARKS l,
m,----.--,-----u-----_--_--,.--------
_---___--_--__-------------_.------_-.---------------.-a-----
--.-------,--,-b
1
^
I ROSEMOUNT 1153/1154 FILL FLUID LOSS UPDATE TO THE NRC, AUG 1989 1
AGENDA
- 1. INTRODUCTION I
A.- ROSEMOUNT ATTENDEES 1
B.- ROSEMOUNT TASK FORCE DIRECTION
- 11. STATUS OF REPORTED FAILURES AND PRA ANALYSIG A.- REVIEW OF FILL FLUID LOSS B. - UPDATE ON CONFIRMED 1153/1154 FILL FLUID LOSS FAILURES C. - PRA ANALYSIS 111. ROSEMOUNT IN FIELD DIAGNOSTIC TEST RESULTS A.- STATUS OF DIAGNOSTIC TEST PROGRAM B. - LABORATORY TEST SIMULATION Rosemount i
j
S e
o IV.1153/1154 MANUFACTURING PROCESS IMPROVEMENTS A. - OVERVIEW OF PROCESS IMPROVEMENTS B. - ADDITIONAL OlL LOSS SCREENING TEST C. - INCREASED TOLERANCE CONTROL ON MACHINED PARTS D. - REDUCED STRESS ON SENSOR DURING MODULE ASSEMBLY E.-
SUMMARY
OF PROCESS IMPROVEMENTS k
6 Rosemount-
4
- 1. INTRODUCTION A. ROSEMOUNT ATTENDEE'S STEVE WANEK - VICE PRESIDENT OPERATIONS MEASUREMENT DIVISION BOB KOOIMAN - VICE PRESIDENT STAN RUD - SENIOR PRINCIPAL ENGINEER TERRY KROUTH - CONSULTANT JANE SANDSTROM - NUCLEAR PRODUCT MARKETING MANAGER MARK VAN SLOUN - NUCLEAR BUSINESS UNIT MANAGER 1
i Rosemount a
- 11. INTRODUCTION B. ROSEMOUNT TASK FORCE DIRECTION ON 1153/1154 FILL FLUID LOSS SITUATION
- SENIOR ROSEMOUNT ENGINEERING STAFF DIRECTING TASK FORCE EFFORTS
- SPECIALIZED CONSULTANTS RETAINED TO SUPPORT INTERNAL ROSEMOUNT ENGINEERING ACTIVITY
- MULTI-FACETED PROBLEM BEING ADDRESSED BY MULTIPLE PROJECT TEAMS
- CONTINUED OPEN DISCUSSION WITH THE INDUSTRY ON PROGRESS BEING MADE
- REGULARLY SCHEDULED STATUS REVIEW BY ROSEMOUNT UPPER MANAGEMENT ON RESOLUTION PROGRESS O
Rosemount-
~
- 11. STATUS OF REPORTED FAILURES AND PRA ANALYSIS A. REVIEW OF FILL FLUID LOSS e SLOW LOSS OF FILL FLUID INTERNAL TO SENSOR MODULE THAT CAUSES TRANSMITTER DEGRADATION.
THE TRANSMITTER DEGRADATIObt CAN INCLUDE:
- SLOW RESPONSE TO PRESSURE CHANGE
- SPAN OR ZERO OUTPUT SHIFTS
- REDUCTION IN RESPONSE TO CHANGING INPUT " NOISE" - FREQUENCY RESPONSE Rosemount-
6
- 11. STATUS OF REPORTED FAILURES AND PRA ANALYSIS l
A. REVIEW OF FILL FLUID LOSS e LOSS OF FILL FLUID IS CAUSED BY A GLASS l
METAL SEAL FAILURE e PRIMARY CAUSE OF THE GLASS TO METAL SEAL FAILURE IS THE HIGHER FORCES PLACED ON SENSOR BY USE OF STAINLESS STEEL PROCESS 0-RINGS e STAINLESS STEEL PROCESS 0-RINGS ARE ONLY USED IN MODEL 1153 AND 1154 TRANSMITTERS. ALL OTHER ROSEMOUNT TRANSMITTERS USE ELASTOMERIC 0-RINGS i
O Rosemount
9 e
e SENSOR CROSS SECTIONAL VIEW
.,~,9 i.. 's, h
Y- /,
/
\\
-I'j f
5: "',;,,
gfl'i s'S
. ais,
'Vl,
? +',';;
s', *' S :::
,:,::,s g ':#q
-:9y x
- ceuren amAcu
! N
- t 5
~;
l S, SI,'S M, %
A
' "r" <
r OIL FILL
- ','s';
W/ '
N
,, $ ;,s,;f
-ISOLATING DIAPHRAGM j' ss '
- < S
's
's S :',
si
'p//
s/ //t
,' p /, $
/
ll/ /' '
N
,6,
'SiI '*
,. s,,.
bbdN
,,/f
/,, '
- CONVOLUTION PLATE cu,,:
p
$ ','1 h
'!SI,g$}
i, i
Rosemount-
2
=
l
\\
/
(
o 3
(
o J
- =,
t j
[f 3]
SENSOR HOUSING
/
/
,/
6;xc
%(
. sx '
/
a LA STAINLESS STEEL 0-RING j
SIDE VIEW HALF SECTION
l II. STATUS 'OF REPORTED FAILURES & PRA ANALYSIS B. UPDATE ON CONFIRMED 1153/1154 FILL FLUID LOSS FAILURES 1
e APRIL 1989 78 TOTAL CONFIRMED OIL LOSS FAILURES l
e MAY 1989 2 ADDITIONAL OIL LOSS FAILURES CONFlRMED e JULY 1989 4 ADDITIONAL OIL LOSS FAILURES CONFlRMED e OTHER
-5 UNITS CURRENTLY IN FAILURE ANALYSIS
-8 SUSPECT UNITS YET TO BE RECEIVED BY ROSEMOUNT
-3' REPORTED SUSPECT UNITS THAT WERE DISPOSED OF BY PLANT Rosemount-
l-
- 11. STATUS OF REPORTED FAILURES AND PRA ANALYSIS l
C. PRA ANALYSIS l
1 e SPECIFIC UTILITIES HAVE REQUESTED THAT ROSEMOUNT CONDUCT A PRA ANALYSIS ON THE FILL FLUID LOSS SITUATION.
e THEY WILL BE USING THIS INFORMATION TO ESTABLISH ANY ADDITIONAL RISK THEY ARE INCURRING USING ROSEMOUNT TRANSMITTERS.
e ROSEMOUNT HAS RETAINED PICKARD, LOWE AND GARRICK TO PERFORM SUCH A PRA ANALYSIS ON THE OIL LOSS FAILURES OF THE MODEL 1153 AND 1154 TRANSMITTERS.
PRELIMINARY RESULTS HAVE BEEN RECEIVED AND ARE UNDER EVALUATION.
Rosemount
j i
111. ROSEMOUNT IN FIELD DIAGNOSTIC TEST RESULTS A. STATUS OF DIAGNOSTIC TEST PROGRAM
- 1. IDENTIFY ALL SYMPTOMS OF OIL LOSS e INCREASED RESPONSE TIME (SLUGGISH) o ZERO SHIFT e SPAN SHIFT e REDUCED FREQUENCY RESPONSE / PROCESS NOISE e COMPLETED o
Rosemount-
I i
i I
111. ROSEMOUNT IN FIELD DIAGNOSTIC TEST RESULTS A. STATUS OF DIAGNOSTIC TEST PROGRAM
- 2. QUANTIFY OIL LOSS SYMPTOMS IN LABORATORY e CONSTRUCTED SPECIAL VARIABLE OIL VOLUME SENSORS OF EACH RANGE e QUANTIFIED ALL FILL FLUID LOSS SYMPTOMS e PUBLISHED FINDINGS IN TECHNICAL BULLETINS i
e 90 + % COMPLETE 1
i 9
6 Rosemount
111. ROSEMOUNT IN FIELD DIAGNOSTIC TEST RESULTS l
A. STATUS OF DIAGNOSTIC TEST PROGRAM 1
- 3. DEFINE DIAGNOSTIC TEST PLANS FOR INDUSTRY COMMENT e DRAFT PROPOSED TEST PROCEDURES e REVIEW WITH INDUSTRY e ACTIVITY HAS BEEN INITIATED Rosemount
Ill. ROSEMO'UNT IN FIELD DIAGNOSTIC TEST RESULTS A. STATUS OF DIAGNOSTIC TEST PROGRAM
- 4. FIELD TEST OIL LOSS DIAGNOSTIC PROCEDURES e EVALUATE PROPOSED TEST PROCEDURES VIA FIELD TESTING e ACTIVITY COMMENCING LATE AUGUST l
1 O
Rosemount-
Ill. ROSEMOUNT IN FIELD DIAGNOSTIC TEST RESULTS A. STATUS OF DIAGNOSTIC TEST PROGRAM
- 5. PUBLISH ROSEMOUNT RECOMMENDED OIL LOSS DIAGNOSTIC PROCEDURES e TARGET OCTOBER 1
1 1
Rosemount-
Ill. ROSEMOUNT 114 FIELD DIAGNOSTICS TEST RESULTS B. LABORATORY TEST SIMULATION e INCREASED RESPONSE TIME l
e ZERO SHIFT e SPAN SHIFT e FREQUENCY RESPONSE e REVIEW OF TECHNICAL BULLETIN DATA e
e Rosemount
I 111. ROSEM6UNT IN FIELD DIAGNOSTIC TEST RESULTS B. LABORATORY TEST SIMULATION TIME RESPONSE vs. LOSS OF OIL e SPECIAL VARIABLE VOLUME SENSOR MODULES HAVE BEEN BUILT FOR EACH RANGE TO ASSIST IN LABORATORY SIMULATIONS.
e USING THE VARIABLE VOLUME SENSOR MODULE A PRESSURE STEP INCREASE OR DECREASE WAS APPLIED TO TRANSMITTERS.
e AS LOSS OF OIL WAS SIMULATED A SIGNIFICANT INCREASE IN TIME RESPONSE WAS NOTED.
\\.
Rosemount
.v i
Response to 750' Hao Step Pressure input Mange 5 24 -
cs 01 Less 20 --
/
45%
16 -
50 %
ass-Output 12 +
p) ets-8--
7ss-4 0
0 5
10 15 28 26 30 36 e
- lene) e Rosemount
Ill. ROSEMOUNT IN FIELD DIAGNOSTIC TEST RESULTS B. LABORATORY TEST SIMULATION TIME RESPONSE vs. LOSS OF OIL e SY INCREASING THE PRESSURE STEP CHANGE THE TEST RESOLUTION CAN BE INCREASED TO POTENTIALLY FIND PROBLEM TRANSMITTERS EARLIER OR MAKE SUSPECT TRANSMITTERS EASIER TO DIAGNOSE.
Rosemount-
1 Reepones to 110F H2O Step Pressure input mange s l
l o us a to 28 ~
29%
24 - -
l l
20 --
l
=
Outpm 16 --
m-ImA) 12 --
'8 +
4 0
0 5
10 15 20 25 30 35 40 h (sec)
Rosemount-
Ill. ROSEMOUNT IN FIELD DIAGNOSTIC TEST RESULTS B. LABORATORY TEST SIMULATION TIME RESPONSE vs. LOSS OF OIL e RESPONSE TIME IS UNAFFECTED FOR A STEP DECREASE IN PRESSURE FOR A HIGH SIDE OIL LOSS e RESPONSE TIME IS UNAFFECTED FOR A STEP INCREASE IN PRESSURE FOR A LOW SIDE OIL LOSS 9
Rosemount-
[.
o Respone to 750' H2O Decreasing Pressure stop inpg Ran0s5 24 -
l 20 16 4 Ou:put 12 +
N
'~'
.7s 81 %
4--
ygw_
0 I
0 5
10 15 3
25 30 3
g U
y h [sec]
1 l
)
i l
l Rosemount-i
Ill. ROSEMOUNT IN FIELD DIAGNOSTIC TEST RESULTS B. LABORATORY TEST SIMULATION ZERO AND SPAN SHIFT vs. LOSS OF OIL.
e THE VARIABLE VOLUME SENSOR MODULES WERE ALSO USED IN THE ANALYSIS OF OUTPUT PARAMETERS vs. FILL FLUID LOSS.
e A ZERO OR SPAN OUTPUT SHIFTS CAN BE A TOOL TO GIVE AN EARLY INDICATION OF SUSPECT OIL LOSS TRANSMITTERS.
e ZERO AND SPAN SHIFTS WERE MEASURED BY CALIBRATING THE SPECIAL SENSOR MODULES AT FULL OIL THEN REDUCING THE OIL FILL VOLUME AND RETAKING MEASUREMENTS.
Rosemount
Ill.'ROSEMOUNT IN FIELD DIAGNOSTIC TEST RESULTS i
l B. LABORATORY TEST SIMULAllON I
ZERO AND SPAN SHIFT vs. LOSS OF OIL e DEFINITION OF ZERO SHIFT: A ZERO SHIFT IS A CHANGE IN THE ZERO OUTPUT OF THE TRANSMITTER THAT IS NOT A FUNCTION OF APPLIED PRESSURE.
IF THERE IS NO SPAN SHIFT THEN A ZERO SHIFT WILL RESULT IN AN EQUAL SHIFT AT FULL SCALE OUTPUT.
e DEFINITION OF SPAN SHIFT: A SPAN SHIFT IS A CHANGE IN THE OUTPUT SPAN OF THE TRANSMITTER. A SPAN SHIFT IS THE DIFFERENCE BETWEEN THE CALIBRATED SPAN AND 16 mA. A SPAN SHIFT DOES NOT AFFECT THE ZERO OUTPUT OF THE TRANSMITTER.
Rosemount-
TransmlMer Performance vs. ON Volume High Pressure Side. Range 5 2.00 -
E l
f 1.00 n
n
~
0.00 [
~
g
.i.00..
/
-2.00 --
0 20 40 00 osvdume um[ul O zero sut O span anst Rosemount
c.
1 Transmitter Performance va OilVolume Low Pressure Side. Range 5 I
teos umL 1
bW
~
_s' e-=
a
-m- ~.
y; Ef0.00I"
~
e
-.- x -
~
op T
e-0 20
,5g 0
Ck
- 1.00 +
o
+
2.00 -
Of Volume t.oa [%j 1
0 zero shet O span anst I
Rosemount-
4 4
Transmitter Performance vs. Oil Volume Range 8 %gh see 4 -
3-Ix2-T 1 -
3 D
C
-C CMM-im%%
g%%_
3, 1 -
$2-
.5 3-4 -
0 to 20 30 40 50 60 70 80 90 100 Od Volume Lost (%)
i C. Zero 0 Span {
f i
This vi'sual aid was used to support a verbal presentation and is preliminary information.
Interpretations of this overhead in its preliminary form may lead to inappropriate conclusions.
Please direct any questions regarding this information to Rosemount Inc.,
Jane Sandstrom (612) 828-3286 i
I l
1
)
l l
Rosemount-l t
______________________a
111. ROSEMOUNT IN FIELD DIAGNOSTIC TEST RESULTS B. LABORATORY TEST SIMULATION ZERO AND SPAN SHIFT vs. LOSS OF OIL l
e A NUMBER OF TRANSMITTERS WITH GOOD SENSORS WERE PLACED IN A LONG TERM STABILITY TEST WITH FULL LINE PRESSURE APPLIED.
c NO OUTPUT SHIFTS WERE OBSERVED.
e KNOWN LEAKING SENSORS, BASED ON MANUFACTURING TESTS, WERE BUILT INTO COMPLETE TRANSMITTERS.
e THESE UNITS WERE ALSO PLACED INTO A LONG TERM DRIFT TEST WITH FULL LINE PRESSURE APPLIED.
e THESE UNITS DID EXHlBIT THE ZERO DRIFT OF THEIR OUTPUTS.
Rosemount
)
l l
l 9
x
=
__ g
(/)
=.
o I
1/ as E
__ g 1
5o
}- i o8 5E M E
-- 8 M O S
A Q. E S
w 7
E;
.E 53 i
rB
-- S cn 2 e
c:
O I
J i
h
__ e
._ g
[f o
1I I
o
~
9 N
q e
6 9
9 9
9 c;;
(UMS POMQ!!e3 %) wqs ciez S
9 e
e I
l a
e y
(
-- 8
/
a a
.. g bf l
,i I
f
--e l
bea E
fg&
l
--s 5
?
?
EE
/
l h?
=E bb ll 8
J
(
/
f
-- e g
h O
O 7
g O
9 9
(""* Pemques %) wqg ugg O
s s
l l
111. ROSEMOUNT IN FIELD DIAGNOSTIC TEST RESULTS B. LABORATORY TEST SIMULATION i
FREQUENCY RESPONSE vs. LOSS OF OIL i
e FREQUENCY RESPONSE DEFINITION: THE RATIO OF INPUT vs. OUTPUT OVER A FREQUENCY RANGE.
e A BODE DIAGRAM CAN BE USED TO GRAPHICALLY DISPLAY TEST RESULTS.
e A CUSTOMER RETURNED RANGE 5 WITH LOW LOW OIL SYMPTOMS WAS TESTED FOR FREQUENCY RESPONSE. THE FOLLOWING DETERMINATIONS WERE MADE:
- OIL LOSS WAS APPROXIMATELY 57%
- TRANSMITTER DISPLAYED SLOW RESPONSE
- THE FREQUENCY RESPONSE WAS SIGNIFICANTLY SHIFTED FROM A GOOD TRANSMITTER.
Rosemount-
O g
C llll3 l
8 W
G s
T f4 /
a A
Y h
9 g
ie li
/
,Ko i
.s m
I k
- 43
"*mM N (m Zkm apw I
l 4
j E
_________b
3 i
e V
Y A
e J
4 d
?
/
l
\\
T 2
s'</
4, w
Q M
,f
=
o a=
1 E
j EE
~
/
f m
w l
I j
s a
/
l l
/
f
//
s g
9 e
43
- =mm N <- zwm a,
l k
4 f
2 R
Y k
Y D
)
Y E
g
/
(#)
j h
s
?
/
,)/
1 a
4 W
C; I
G l
J k
E E
if
,/
en u
I
/
4
?
l l
//
l
\\
I 4
O W
h t_, -
e d
6 4
Response T1me, Flekt p,gg, 24..
)
Treamtw l
/
20 --
l te --
***'* Sh Output 12 IN}
a.
4..
e 0
^
0 60 120 180 240
~
Time [secJ 4
4 Rosemount-
Ill. ROSEM6UNT IN FIELD DIAGNOSTIC TEST RESULTS B. LABORATORY TEST SIMULATION FREQUENCY RESPONSE vs. LOSS OF OIL e THE VARIABLE VOLUME SENSOR MODULE FOR A RANGE 5 WAS PLACED IN SERVICE ON AN ORIFICE PLATE WITH A REFERENCE TRANSMITTER IN THE ROSEMOUNT FLOW LAB.
e FREQUENCY RESPONSE DATA WAS GATHERED.
e THE RESULTS INDICATE THAT A SUSPICIOUS TRANSMITTER CAN POTENTIALLY BE IDENTIFIED WITH A FORM OF FREQUENCY RESPONSE TESTING.
i Rosemount tL________-_____
s e,
Frequency Response Bode Plot to y '
4 A
e Amplitude 0.1 y Ratio
[in/out]
Reed Retum,57%
0.01 u 4
e C.001 01 1
to Frequency [H2]
e l
Rosemount j
f!
-- T'ARJ,B.L.E.~VbLtfME hENSOR
-r h h[
'~
l h-.j..
i f
4 1
i l
p
.I i
I 1
J..-
1p
. g.:
g i
z
.o0011m t _.4 l
.l
.,.....;..u ::.'
l I'
IL i
-te
}
s I....-li
..]. _q
~~:..r.l.i..
MONIT0kSENSdR.*.
~
i Q.j i
., !.a J.
i l
. '0W [
[ *\\* g' W. y 9
[. /J h y
r i:.
i'
}.._.. i:-
L.. _. L I-I Variable volume sensor set for 4% oil loss. Signal from in
{
l
. VARIABLE.Y0LUME SENSOR
_-l 7
i _.
l
}
l-I l
i i
t I
-..._. q-
,j i
._#..._ a,. :_. _.
t 4....._
t s
i
-i3 i
4 l
4 i
l.
l..
...j
-hl t-1 MC NITOR SENSOF
+
g_.
.t k
D, Nh f
~
t l
i
~'
_gg
., L :,
i
/
.I I
Signal from integral orifice plate in flow lab.
Variable volume sensor set for 55% oil loss.
Rosemount-
w z
H t
5 n
u D
E P
o O
m_
S e
TL U
S A
e P
s
)
o S3 m
l.
R U:
e s
L TS i
'iJ ii J iiia i
l J i
'iJ i. i J i i i i ' i J
S 1
V z
B H
d m
Y 5A 2
4 u
L P
7 ES 4
GI 7
ND 49 A
0 RA 9
i'iL I
t i. i t
i' L i.. L i l
i t i
'I 1
.ii
.W 6
B:
5 r
3 Y
G F
D z
E H
~
R m
O T
S 5
4..
2H
.z B
1 5
s V
sT2 5m BI 0mR 2r dD 5rA:
V
/
2VTr m
uSX ll
O S
e T
U S
A l
P g
i S3
\\
r U
i'iJ l
l i i i J i J i ' i i.
i 1
J l
1 1
J. i'.'
T S
{
A M
\\
I T R f
S V
z B
H d
m Y
5 A 2
L 4
7 P
E S G I 7
N D 4
A R A i '
it
. i i t
i t
t i '
it l
L 1
1 i t i i'.W 1
6 B
5 3
G F
D z
E H
m R
O T
5 S
- 4...
2 B
1 s
V sT2 5m BI 0 mR 2r dD 5rA:
V
/
2VTr m
uSX l<
l
!\\'
...........................I2 P
A S
n i
lB S3 U:
3 l
I a
TS
'l J
1 l
l J
1 i. J l
i l
J i
'l J i l
I J
l l
1 i
AM l
/
TR J
S i
l u
(
V z
B H
d m
Y 2
5A
'.4 L
P 7
(
GI ND 7
47 A
RA i'l L
l l
l L
i 1
i t
l 1
t i'l L i 1
i t l
i i I
1 1
,W 6
B 5
3 G
F
...... '............ ' i D
z E
H R
m O
T 5
S 25 B
1 s
V sT0 5m BI 0 mR 2r dD 5rA:
V
/
2VTr m
USX
l 111. ROSEMOUNT IN FIELD DIAGNOSTIC TEST RESULTS 1
B. LABORATORY TEST SIMULATION
SUMMARY
l e TIME RESPONSE TESTING CAN IDENTIFY AND CONFIRM ALL RANGES OF TRANSMITTERS THAT ARE LOSING FILL FLUID.
e ZERO OR SPAN OUTPUT SHIFTS CAN BE A LEADING INDICATOR TO IDENTIFY SUSPECT FILL FLUID LOSS TRANSMITTERS.
- EFFECTIVE FOR LOW RANGE MODULES
- NOT EFFECTIVE FOR HIGH RANGE MODULES e THE FREQUENCY RESPONSE FOR ALL RANGES OF TRANSMITTERS CAN BE USED TO IDENTIFY SUSPECTED FILL FLUID LOSS.
e Rosemount
I IV.1153/1154 MANUFACTURING PROCESS IMPROVEMENTS A. OVERVIEW OF PROCESS IMPROVEMENTS
- 1) MANUFACTURING TEST PROCESS IMPROVEMENTS e AUG '86 - MORE SENSITIVE CRITERIA INTRODUCED e JULY '87 - TESTING PARAMETERS REFINED e JULY '89 - ADD}TIONAL OIL LOSS SCREENING e JULY '89 - NEW TEST FIXTURE DEVELOPED e JULY '89 - NEW TEST PROCEDURES INTRODUCED
- 2) SIGNIFICANTLY REDUCED GLASS TENSILE STRESS e STAINLESS STEEL 0-RING FORCE REDUCED BY TIGHTER DlMENSIONING e MANUFACTURING ASSEMBLY FORCE REDUCED Rosernount
~
l IV.1153/1154' MANUFACTURING PROCESS IMPROVEMENTS B. ADDITIONAL OIL LOSS SCREENING TEST e A NEW TEST FIXTURE WAS DEVELOPED TO S!MULATE THE FORCES THE SENSOR SEES IN A COMPLETED TRANSMITTER.
e THE DATA FOR THE DESIGN OF THE FIXTURE AND TESTING PARAMETERS WERE DEVELOPED USING TWO DIFFERENT METHODS:
- INSTRUMENTED SENSOR
- DIMENSIONAL TOLERANCE ANALYSIS e SENSORS WITH FAILED GLASS TO METAL SEALS WILL SHOW CARKENING OF METAL OXIDE LAYER DUE TO EXTREMELY SMALL AMOUNTS OF OIL. ANY OXIDE DARKENING IS A CONFIRMED FAILED SENSOR.
I Rosemount-
o OIL LOSS LIFETIME ESTIMATES WERE MADE BASED ON THE FOLLOWING CRITERIA:
- THE RESOLVABLE AREA OF DARKENED METAL OXIDE WAS TRANSLATED INTO RESOLVABLE OIL VOLUME LOSS.
- A CRITICAL OIL VOLUME LOSS WAS DETERMINED FOR EACH RANGE BEFORE THE RESPONSE TIME.
- THE OIL LOSS LIFETIME WAS EXTRAPOLATED BASED ON TEST TIME, PRESSURE, RESOLVABLE OIL LOSS VOLUME, AND SENSOR CRITICAL OIL LOSS VOLUME.
s ANY SENSOR PASSING THE NEW TEST CRITERIA WILL HAVE AN OIL LOSS LIFE EXPECTANCY SIGNIFICANTLY GREATER THAN THE ELECTRONICS QU.ALIFIED LIFE.
I l
Rosemount I
\\
L
_------------__ _ --_-- _ _ _ _ _--_ o
N.1153/1154 MANUFACTURING PROCESS IMPROVEMENTS C. INCREASED TOLERANCE CONTROL ON MACHINED PARTS e THE STAINLESS STEEL PROCESS 0-RING DISTINGUISHES THE 1153/1154 FROM OTHER ROSEMOUNT TRANSMITTERS.
e THE STAINLESS STEEL 0-RING APPROXIMATELY DOUBLES THE FORCES SEEN BY THE SENSOR.
e' NEW MACHINING EQUIPMENT IS BEING USED TO REDUCE TOLERANCES AND RESULTS IN REDUCED FORCES ON THE SENSOR FROM THE STAINLESS STEEL 0-RING.
i l
1 Rosemount i
~
l l
IV.1153/1154 MANUFACTURING PROCESS IMPROVEMENTS D. REDUCED STRESS ON SENSOR DURING MODULE ASSEMBLY e THE SENSOR IS PLACED IN A STAINLESS STEEL HOUSING TO ALLOW PROCESS CONNECTION CAPABILITY AND ENVIRONMENTAL PROTECTION.
s BASED ON ENGINEERING REVIEW OF SIMILAR PRODUCTS THE FORCE APPLIED DURING MANUFACTURING OF THE
{
SENSOR MODULE WAS REDUCED.
l Rosemount-
[.
IV.1153/1154 MANUFACTURING PROCESS IMPROVEMENTS E.
SUMMARY
OF PROCESS IMPROVEMENTS e THREE SIGNIFICANT PROCESS IMPROVEMENTS HAVE BEEN IMPLEMENTED:
- ADDED SCREENING TEST
- REDUCTION IN FORCE AND VARIATION EXERTED ON SENSOR BY STAINLESS STEEL 0-RING
- REDUCED FORCE ON SENSOR DURING MODULE ASSEMBLY e A QUALITY CONTROL STEP, LONG TERM STABILITY TESTING UNDER PRESSURE, WAS IMPLEMENTED TO L
CHECK AND CONFIRM NEW PROCESS IMPROVEMENTS.
t e THESE PROCESS IMPROVEMENTS HAVE ADDRESSED THE DEFECT THAT CAUSED ROSEMOUNT TO ISSUE THE 10CFR PART 21 NOTIFICATION ON MAY 10,1989 Rosemount-
m 4
s aru i
s G
n o
lc n
n O
a E
n o
hi R
o Wict t
ela a
B uMup s
l Y
a e o e
r B
v uP nn El S
ie ol i
K
&ar ie t
Fu cd S
y ei l
A edia t
u T
v nF eG r
a D
D ut y
p sf e o E
Sri t
rl F
a e n ue I
de iv l
t IT and ae N
DUI FD E
D 1
2 I
k k
s s
a a
T T
ms i
G n n O
a n
o hi R
o Wict t
ela B
amu u
p s
l Y
a e o e
r B
v uP nn El S
ie oi l K
&ar ie t
Fu cd S
y ei l
A edia t
u T
v nF eG r
a D
D ut y
p sf E
Sri e o t
rl F
a e n ue I
de iv l
t IT and ae N
DUI FD E
D 1
2 I
k k
s s
a a
T T
i