Text
n-V l
- i t
- il.
q E
samm Pcttland General BectricCoiriptsy 3
U
{
i David W. Cockfield Vice President, Nuclear-l
'l May 25, 1989 Trojan Nuclear Plant Docket 50-344 License NPF-1 i
i U.S. Nuclear Regulatory Commission ATTN: Document Control Desk j
i
. Washington DC 20555' l
Dear Sirs:
1 Trojan Nuclear Plant j
Lonn-Term Pipe Support Design Verification Program 4
On April 28,'1989,-Portland Ceneral Electric Company (PCE) informed the Nuclear. Regulatory Commission (NRC) via telephone of further changes to l
commitments made in our letter of January!20,1989, Design Verification Program. The' Attachment provides the changes and explanations for them
{
as discusse.4 with Mr. Roby Bevan.
We would be 3. leased t'.,' discuss any questions or comments you may have l
regarding thic correspondence.
.l Sincerely, 9906050026 890525-I l
PDR ADOCK 05000344 l
P PNU t
Attachment c:
Mr. John B.' Martin Regional Administrator, Region V U.S. Nuclear. Regulatory Commission Mr. William T. Dixon J
State of Oregon Department of Energy Mr. R. C. Barr NRC Resident inspector I
Trojan Nuclear Plant
' I 121 S W Sa:rron Deet. Port and. Oregon 97204 4
p,
4 f*"
- Trojin Nucle 2r Plent.
Document Control Disk
' Docket 50-344 Attachment'
~.Licedse NPF-1 May 25, 1989 Page 1 of I CHANGES TO COMMITTED ACTIONS IN LETTER DATED JANUARY 20,-1989 Structural Analyses of Turbine and Pbel Buildings:
Portland General Electric Company (PCE) committed to completing confirma-s tory structural design adequacy ' evaluations for the Turbine Building and Fuel. Building by April 28, 1989 and May 15, 1989, respectively. The evaluations involve documenting comprehensive analyses of the structures for seismic and tornado loading conditions.
It has become apparent from the analyses completed to date that more rigorous analyses will be needed~
to' fully document the overall etractural adequacy of the buildings. The extended due dates shawn below for'the affected commitments will allow for' comp 19 tion of the additional ~ analyses.
Original Extended Item Description Due Date bue Date Formal. evaluation of the Turbine Building 04/28/89 08/31/89 structural framing and bracing.in the east-west ~ direction.for seismicfand tornado loads will be completed to confirm design adequacy.
Evaluation of the Turbine Building wind 04/28/89 08/31/89 columns. : metal. siding, and metal roof deck-ing will be completed to confirm design adequacy.
Formal evaluation of the Turbine Building 04/28/89 08/31/89 operating floor slab will be completed to demonstrate design adequacy as a diaphragm slab.
Evaluaticn.of the Fuel Building structural 05/15/89 08/31/89 framing and bracing system will be completed to confirm design adequacy.
Evaluation of the Fuel Building metal siding 05/15/89 08/31/89 and metal roof decking will be completed to confirm design adequacy.
Inspection of Pipe Whip Restraints:
PGE. committed to conducting an inspection of a representative sampic of pipe Whip restraints (PWRs) and adjacent pipe supports in Mode 5 during the 1989 Refueling Outage. The intent was to perform an inspection with the Plant in a cold condition as follow-on to the inspection in a hot condition (Mode 3), which was completed during the 1988 Refueling Outage.
The inspection this outage was actually performed in Mode 6.
The acceptance criteria was met in all cases.
LCD/mr/3092W.0589
[