Text
- _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ - _ _ _
p y
BALTIMORE j
GAS AND ELECTRIC f
\\/
CHARLES CENTER P.O. BOX 1475 BALTIMORE, MARYLAND 21203
' NUCLEAR ENG EERING SERVICES DEPARTMENT CALVERT CLIFFS P4UCLEAR POWER PLANT LUSBY, MARYLAND 20657 March 30,1989 U. S. Nuclear Regulatory Commission
- Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Unit 2 Cvele 9 Sinnie Pin Burnuo Gentlemen:
As requested by Mr. : S. A. McNeil, we are providing additional information concerning the single pin burnup limits for the Unit 2 Cvele 9 core. The Unit 2 Cycle 9 single pin burnup limit is dependent on the Unit 2 Cycle 8 end-of-cycle burnup. The end-of-cycle burnup for Cycle 8 is 17, 974 MWD /T. In Unit 2 Cycle 9, the most limiting fuel pin will reach a burnup of 52,000 MWD /T when the cycle 9 burnup is 14,600 MWD /T. This would occur approximately 450 days after stertup from the current refueling outage, assuming 100% continuous power operation.
If you have any questions, please contact P. S. Furio at (301) 260-4374.
Very truly youre, fik N_
W. J. Lippold General Supervisor - Technical Services Engineering WJL/ PSF /dtm cc:
D. A. Brune, Esquire J. E.
Silberg, Esquire R. A.Capra, NRC S. A.McNeil, NRC 0]
W. T. Russell, NRC 61 H. Eichenholz/V. L. Pritchett, NRC Q
I O T. Magette, DNR i
8904060026 890330 ADOCK0500g8 PDR P
_ _ _ _ _ _ - - -. _ _ _ _ _ _ _ -