Att2+ C Lt pm:g D-Ot23 A
UNITED STATES g
g j
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. enana many
- o April 9,1998 Mr. Nicholas J. Liparulo, Manager Nuclear Safety and Regulatory Analysis 1
Nuclear and Advanced Technology Division l
l Westinghouse Electric Corporation l
P.O. Box 355 Pittsburgh, PA 15230 N
SUBJECT:
FORWARDING OF CONTRACTOR REPORTS ASSOCIATED WITH THE REVIEW OF CHAPTER 3 OF THE AP600 STANDARD SAFETY ANALYSIS REPORT (SSAR)
Dear Mr. Liparulo:
The staff has asked contractors to perform analyses to support their review of Chapter 3 of the l
AP600 SSAR A brief discussion of the analyses contained in these reports will be included in the staffs final safety evaluation report. The reports from the contractors are attached for your information. Enclosure 1 is a report entitled " Confirmatory Soil-Structure Interaction Analysis of the Westinghouse AP600 Nuclear Island Structures" by Carl Costantino, and Quazi Hossain.
1 is a report entitled "Axisymmetric Buckling Analysis for the AP600 Standard Plant l
Containment Vessel" by L. Greimann, F. Fanous, R. Challa, and D. Bluhm. Enclosure 3 is a report entitled "Three-dimensional Buckling Analysis for the AP600 Standard Plant Containment Vessel" oy L. Greimann, F. Fanous, S. Safer, H. El-Arabaty, A. Khalil, and D. Bluhm.
Enciosure 4 is a report entitled "Three dimensional Analysis of AP600 Standard Plant Shield Building Roof" by L. Greimann, F. Fanous, S. Safer, A. Khalil, and D. Bluhm. If you have questions concoming these reports please contact Thomas Cheng of the civil engineering and geosciences branch at (301) 415-2770.
l You have requested that portions of the information submitted in the June 1992, application for l
design certification be exempt from mandatory public disclosure. While the staff has not completed its review of your request in accordance with the requirements of 10 CFR 2.790, that portion of the submitted information is being withheld from public disclosure pending the staffs final determination. The staff concludes that these follow on questions do not contain those portions of the information for which exemption is sought. However, the staff will withhold this letter from public disclosure for 30 calendar days from the date of this letter to allow
/
/
l NRC 1"ilf EDTE3 CCPY
% %r l
9805260221 990409
(
PDR ADOCK 05200003 A
PDR i
i
1 l
l Mr. Nicholas J. Liparulo Apri1 9, 1998 1
Westinghouse the opportunity to verify the staffs conclusions. If, after that time, you do not request that all or portions of the information in the enclosures be withheld from public i
l disclosure in accordance with 10 CFR 2.790, this letter will be placed in the Nuclear Regulatory Commission Public Document Room.
Sincerely, gY" Joseph M. Sebrosky, Project Manager Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No.52-003
Enclosure:
As stated cc w/ encl: See next page DISTRIBUTION:
- Enclosure to be held for 30 days
- Docket File PDST R/F TQuay l
- PUBLIC TKenyon JSebrosky l
ACRS (11)
TCheng,0-7 H15 GBagchi,0-7 H15 JMoore,0-15 B18 l
l DOCUMENT NAME: A:CHP3_RPT.RAI T3 receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy l
. with attachment / enclosure "N" = No copy OFFICE PM:PDST:DRPM l ECGB:DEng l
D:@ljk@E l
D:PDST:DRPM l NAME JMSebrosky:st(14Ti' TChen W 4!I8a W TRQuay 4M DATE 04/ 9 98
([
04/8/98 04/ 9 /98 04/ 6 /98 OFFICIAL RECORD COPY-i l
t
Mr. Nicholas J. Liparulo Docket No.52-003 Westinghouse Electric Corporation AP600 cc:
Mr. B. A. McIntyre Ms. Cindy L. Haag Advanced Plani Safety & Licensing Advanced Plant Safety & Licensing Westinghouse Electric Corporation Westinghouse Electric Corporation Energy Systems Business Unit Energy Systems Business Unit P.O. Box 355 Box 355 Pittsburgh, PA 15230 Pittsburgh, PA 15230 Enclosure to be distributed to the following addressees after the result of the proprietary evaluation is received from Westinghouse:
Mr. Russ Bell Ms. Lynn Connor Senior Project Manager, Programs DOC-Search Associates Nuclear Energy Institute Post Office Box 34 1776 i Street, NW Cabin John, MD 20818 Suite 300 Washington, DC 20006-3706 Mr. Robert H. Buchholz GE Nuclear Energy Dr. Craig D. Sawyer, Manager 175 Curtner Avenue, MC-781 Advanced Reactor Programs San Jose, CA 95125 GE Nuclear Energy 175 Curtner Avenue, MC-754 Mr. Sterling Franks San Jose, CA 95125 U.S. Department of Energy NE-50 Barton Z. Cowan, Esq.
19901 Germantown Road Eckert Seamans Cherin & Mellott Germantown, MD 20874 600 Grant Street 42nd Floor Pittsburgh, PA 15219 Mr. Charles Thompson, Nuclear Engineer AP600 Certification Mr. Frank A. Ross NE-50 U.S. Department of Energy, NE-42 19901 Germantown Road Office of LWR Safety and Technology Germantown, MD 20874 19901 Germantown Road Germantown, MD 20874 Mr. Robert Maiers, P.E.
Pennsy'vania Department of Mr. Ed Rodwell, Manager Environmental Protection PWR Design Certification Bureau of Radiation Protection Electric Power Research Institute Rachel Carson State Office Building 3412 Hillview Avenue P.O. Box 8469 Palo Alto, CA 94303 Harrisburg, PA 17105-8469
_______