ML20247L643

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept CP-89-018 Re Printed Circuit Boards in Elgar Inverters,Initially Reported on 890626.Further Evaluation Required to Establish Safety Significance
ML20247L643
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/26/1989
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CP-89-018, CP-89-18, TXX-89493, NUDOCS 8908010303
Download: ML20247L643 (1)


Text

-

-t',

M Log # TXX-89493 1

C File # 10110 C-

.C 908.3 Ref. # 10CFR50.65(e)'

TUELECliHC WHEens J. Cahul. Jr.'

Executive Mce hesiant U. S. Nuclear Regulatory Cemission Attn: Document Control Desk Washington,.D.. C.

20B55

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 SOLDERING IN ELGAR INVERTERS SDAR: CP-89-018 (INTERIM REPORT)

Gentlemen:

On June 26, 1989, TU Electric verbally notified the NRC of a potentially reportable deficiency under. the provisions of 10CFR50.55(e) concerning printed circuit boards in Elgar inverters.

During startup ectivities, cracks and broken solder joints have been identified on printed circuit boards in Elgar inverters.

Further evaluation is required to establish the safety significance of this issue.

l TU Electric will provide a final report on this issue prior to Unit 1 fuel load.

Sincerely, e

2:.

William J. Cahill, Jr.

WJH/vid c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) l I

l 8908010303 890726

.PDR ADOCK0500g5

/;9

.s.

\\ 0 400 North Olive Street LB81 Dallas, Texar 75201

.