ML20247L593

From kanterella
Jump to navigation Jump to search
Confirms That CEOG Participation in Forthcoming Briefing to Commissioners of NRC & to Provide Background & Guidance for Briefing
ML20247L593
Person / Time
Issue date: 05/15/1998
From: Sheron B
NRC (Affiliation Not Assigned)
To: Pilmer D
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
PROJECT-692 NUDOCS 9805260023
Download: ML20247L593 (6)


Text

-

l

/*

pn es:

v 1

UNITED STATES g

j g

j NUCLEAR REGULATORY COMMISSION l

t WASHINGTON, D.C. 20666 4 001 e%,,,,,l May 15,1998 l

l Mr. David Pilmer, Chairman Combustion Engineering Owners Group San Onofre Nuclear Generating Stat!on 14300 Mesa Road San Clemente, CA 92672 Dear M e-I am writing to confirm the Combustion Engineering Owners Group (CEOG) participation in a l

forthcoming briefing to the Commissioners of the U.S. Nuclear Regulatory Commission (NRC),

and to provide background and guidance for the briefing.

The briefing is currently scheduled for 10:00 - 11:30 on June 12,1998, in the Commissioners' Conference Room on he first floor of the White Flint One building.

As I discussed with you, the purpose of the briefing is to inform the Commissioners about the Owners Groups, their organization, budget, objectives, activities, recent successes, relationship

. with other Owners Groups, NEl, etc., and your presentations should address these areas as appropriate.

Although I am writing to you in your position as chairman of the CEOG, I recognize that your Owners Crcap organizational structure provides for executive oversight, etc. Hence, I will leave it up to each Owners Group to select the one individual who will represent them at the briefing table. I would encourage each of you to talk with vour counterparts in the other Owneis Groups to ensure consistency in the level of representation from each Owners Group, as well as presentation information. Enclosure 1 is a list of the other Owners Group Chairmen for your l

information.

l This Commission briefing is scheduled to be completed in 1% hours. I will be at the briefing table ar,d wi'.I give about a 13-12 minute presentation on the NRC's perspective. I suggest that each Owners Group represer.tative plan on a briefing of no more than about 10-12 minutes duration each phis translates to about 5-t> slides). This should allow about 30 minutes for questions and answers.

l l am enclosing as Enclosure 2 for your information and use, guidelines for presentations to the Commission. Note that you should identify the speaker by May 26,1998, and provide 20 copies l

of your slides by June 5,1998.

4 B C RLF CSH S CDP) 4-g#

grormoou98o32 pfD3 noR ORG NRRA ffa3~.67s gl n-

Mr. David Pilmer May 15, 1998 I appreciate your willingness to take time out of your schedule to participate in this briefing. I believe that the Owners Groups are playing an increasingly important role in proactively addressing potential safety issues that arise, and I believe it is appropriate that the Commission be informed of these activities.

If you have any questions, please feel free to call me at (301) 415-1274 or e-mail me at bws@nrc. gov. I will probably contact yors regarding any last minute details prior to the meeting.

Sincerely, 4

N Brian W. Sheron, Acting Associate Director for Technical Review Office of Nuclear Reactor Regulation Project No. 692

Enclosures:

As stated cc w/encis: See next page l

i Mr. David Pilmer May 15,1998 I appreciate your willingness to take time out of your schedule to participate in this briefing. I.

believe that the Owners Groups are playing an increasingly important role in proactively addressing potential safety issues that arise, and I believe it is appropriate that the Commission be informed of these activities.

If you have any questions, please feel free to call me at (301) 415-1274 or e-mail me at bws@nrc. gov. I will probably contact you regarding any last minute details prior to the meeting.

Sincerely, Original. Signed By:

)

Brian W. Sheron, Acting Associate Director for Technical Review Office of Nuclear Reactor Regulation l

Project No. 692

Enclosures:

As stated cc w/encis: See next page

/

DISTRIBUTION:

Central File PGEB R/F SCollins/FMiraglia,0-5 E7 PUBLIC BSheron,0-5 E7 BBoger,0-5 E7 JRoe DMattheus TEssig FAkstulewicz SMagruder WHill, SECY JBlaha, EDO GTracy, EDO OPA ACRS OGC DOCUMENT NAME: COMM-MTG.LTR To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure

6" = Copy I

with cttachment/ enclosure "N" = No copy OFFICE PM:PGEB:DRPM lE.ISC:PGEB:DRE$j (A)C:PGEBpRPM l l

l NAME SMagrudersg $.M FAkstulewicf'# '

TEssig (4,

F i

DATE 05 h,

05/

8 05

/98 l

OFFICE (A)D:DRPM

(

NAME JRoe BShkod DATE 05/ 19 8 05/lfl98 OFFICIAL RECORD COPY I

-____-________m_.._-___m.

OWNERS' GROUPS' CHAIRMEN 1.

Lou Liberatori, Chairman WOG Steering Committee Consolidated Edison Co. of NY Indian Point Unit 2

. Broadway & Bleakley Avenue Buchanan, NY 10511 (914) 734-5676 2.

David Pilmer, Chairman CE Owners Group San Onofre Nuclear Generating Station 14300 Mesa Road San Clemente, CA 92672 (714) 368-1486' 3.

Thomas J. Rausch, Chairman Boiling Water Reactor Owners' Group Commonwealth Edison Company Nuclear Fuel Services 1400 Opus Place,4th Floor ETWill Downers Grove, IL 60515 l

(630)663-3020 4.

C. Randy Hutchison, Chairman B&WOG Executive Committee Vice President Operations Arkansas Nuclear One Entergy Operations, Inc.

1448 S.R. 333 P.O. Box 1439 Russellville, AK 72801-0967 (501) 858-4888 i

l l

l l

j l

L___.

GUIDELINES FOR PRESENTATIONS TO THE COMMISSION This Commission meeting is scheduled for approximately 1% hours. Since there will be several other speakers and the Commission prefers time for questions following each presentation, please limit your prepared presentation to 10 to 12 minutes. If your formal statement would require more time, please submit it in writing for the record and summarize it within 10 to 12 minutes.

If someone other than yourself is the principal speaker, please provide his or her name and title to Mr. William Hill of the Office of the Secretary by Tuesday, May 26,1998. Bill Hill can be reached at 301-415-1661, facsimile 301-415-1672, or e-mail wmh@nrc. gov.

The Commission meeting facility has a sophisticated television graphics system. For optimum use, please follow the enclosed guidelines for preparing your briefing visuals. The system is unique, and you should follow the enclosed instructions closely. Should you require additional information on the format for your view graphs, please contact us. Our experience suggests that it is desirable to preview your viseals on our system several days prior to the meeting if possible.

Normally we anticipate that a member of your party familiar with your presentation will be in our Audiovisual Room to display your visuals, if this is not possible, we require a copy of your full written presentation and visuals as discussed below. One set of the text and visuals should be appropriately marked to indicate when your speaker desires each visual to be displayed. Your cooperation in this matter is requested so we can provide smooth coordination between the speaker and the graphics display.

Please provide 20 advance copies of your prepared statements, outlines, viewgraphs, and handouts by Friday, June 5 "98. This should be provided to Bill Hill of the Office of the Secretary. If possible, yos <t. y send an electronic version (Power Point version 4 (black and white only), Wordperfect, M.) via e-mail to Mr. Hill. We also require approximately 90 copies of your material at the meeting for members of the public. If you are unable to provide these copies, or would like help with them, please advise us.

As you may be aware, our office is iocated adjacent to the White Flint Metro Station on Rockville Pike. There is reserved visitor parking for Commission guests in the building garage. Entrance is at the rear of the building. Please check with the security staff at the entrance to the garage when you arrive. If you plan to use the reserved parking, it would be helpful if you notify us in advance.

1

l GENERAL GUIDELINES FOR VIEWGRAPHS 1.

, Arrange all visuals in a 3 by 4 configuration (e.g.,3 units in the y-axis and 4 units in the x-axis). This will conform your visuals to the 3 by 4 television monitors.

2.

Limit your alphanumeric script to 13 lines vertical and 40 characters I

horizontal per lines.

3.

Type sizes are BOLD 30-point for titles and no less that COLD 20-point for body text. Use no less than BOLD 24-point for body text if lower case letters are used.

4.

Maximum image area of 6- (vertical) by 8-inch (horizontal) on 8.5 x 11 sheet of paper.

4.

It may be helpful to number the viewgraphs.

t o

f

4 CE OWNERS GROUP Project No 692 cc:

. Mr. Gordon C. Bischoff CEOG Project Manager ABB Combustion Engineering M.S. 9615-1932 2000 Day Hill Road Windsor, CT 06095 Mr. David Pilmer, Chairman CE Owners Group San Onofre Nuclear Generating Station 14300 Mesa Road San Clemente, CA 92672 Mr. Charles B. Brinkman, Director Nuclear Systems Licensing

'ABB Combustion Engineering, Inc.

Post Office Box 500 2000 Day Hill Road Windsor, CT. 06095 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 l

l-i

(