W Y C:mm:nwrith Edison
(:- l aic f
~ / 72 West Adams Sireet, Chicago, Ilknois
- 7 KHdress Reply to: Post OTficiFET>F V
'b
\\
7 V Chicago, Illinois 60690 0767 i '
4..
{
[-
May 16, 1989 h
1:
L
'Dr. Thomas:E. Murley, Director Office of Nuclear Reactor Regulation U. S. Nuclear. Regulatory Commission l-Washington, DC 20555 l
Subject Byron Station Units 1 and 2-Braidwood Station Units 1 and 2 Leak-Before-Break Evaluation for Stainless Steel Piping NRC Docket Nos. 50-454/455 and 50-456/457 l l'
Dear Dr. Murley:
The purpose of this' letter is to provide the Leak-Before-Break (LBB) evaluation for stainless steel piping.for Bryon and Braidwood Stations. A meeting was held with members of your staff on May 3, 1989.
During the meeting, Commonwealth Edison presented the LBB program for stainless steel
. piping systems that included the reactor coolant bypass line, the s:2fety injection accumulator line,.and the residual heat removal uiuction piping. The report contained in Attachment A provides the detailed evaluation.
Commonwealth Edison requests approval of the LBB program for stainless steel piping by December 20, 1989, to allow the analysis to be used for the-1990 refueling outages for the Byron and Braidwood Stations.
Please direct any question on this matter to this office.
Very truly yours, N
A/Chrzanowski R.
Nuclear Licensing Administrator s.
'0137T 1 cca Byron Resident Inspector Braidwood Resident Inspector L. N. Olshan - NRR S. P. Sands - NRR 6l M. C. Parker - IDNS
}
' \\
8906020100 890516 PDR ADOCK 05000454 P
/