10CFR50.36-goutn,cergnni metric a nas ccmp:ny ogi.s.jr.anzm Nuclear Operations genk;n,s,vgsc 29065

" SCE&G f BChKR.5%Wsp September 11, 1989 i

Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 i

Attention:

Mr'. Learned W. Barry

SUBJECT:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 August Monthly Operating Report Gentlemen:

Please find enclosed the August 1989 Monthly Operating Report for the Virgil C.

-Summer Nuclear Station Unit No. 1.

This submittal is made in accordance with

.the requirements of Technical Specifications Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Very truly yours, O. S. Bradham RJB/JWH/OSB: led Attachments c:

D. A. Nauman/0. W. Dixon, Jr./T. C. Nichols, Jr.

E. C. Roberts W. A. Williams, Jr.

J. B. Knotts, Jr.

S. D. Ebneter J. W. Flitter J. J. Hayes, Jr.

INP0 Records Center General Managers ANI Library C. A. Price Marsh & McLennan R. B. Clary NPCF K. E. Nodland NSRC J. C. Snelson RTS (RG 890002)

R. L. Prevatte File (818.03-1) bk?lgggo ests

' I

l.

Document Control Desk

' August Monthly Operating Report Page 1 ATTACHMENT I l

AVERAGE DAILY UNIT POWER LEVEL l

l-DOCKET NO.: 50/395 UNIT:

V. C. SUMMER I DATE: 09/01/89 COMPLETED BY:

J. W. HALTIWANGER TELEPHONE:

(803) 345-4297 AUGUST 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

867 17.

868 2.

865 18.

867 3.

870 19.

869 4.

868 20.

861 5.

869 21.

868 6.

866 22.

868 7.

867 23.

868 8.

867 24.

867 9.

869 25.

342 10.

869 26.

-27 11.

869 27.

-24 12.

870 28.

-17 13.

870 29.

-17 14.

869 30.

-21 15.

869 31.

-32 16.

869 I

I

~

,'y^

f?

' Document Control Desk August Monthly Operating Report' 1-Page 2 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.: 50/395 UNIT:

V. C. SUMMER I DATE: 09/01/89 COMPLETED BY:

J. W. HALTIWANGER IELEPHONE:

(803) 345-4297 i

' OPERATING STATUS

1. Reporting Period:

Auaust 1989 Gross' Hours in Reporting Period:

744

2. Currently Authorized Power Level (MWt):- 2775 Max.. Depend. Capacity (MWe-Net):

885 Design Electrical Rating (MWe-Net):

900

3. Power Level to Which Restricted (If Any)(MWe-Net): N/A_
4. Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE
5. Number of Hours Reactor Critical 586.1 4682.1 37418.7
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator on Line 586.1 4596.1 36678.8
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 1624224 11295526 96144130
10. Gross Electrical Energy (MWH) 530360 3694950 31841779
11. Net Electrical Energy Generated (MWH) 504861 3497603 30184761
12. Reactor Service Factor 78.8 80.3 75.3
13. Reactor Availability Factor 78.8 80.3 75.3
14. Unit Service factor 78.8 78.8 73.8
15. Unit Availability Factcr 78.8 78.8 73.8
16. Unit Capacity Factor (Using MDC) 76.7 67.8 68.7
17. Unit Capacity Factor (Design MWe) 75.4 66.6 67.5
18. Unit Forced Outage Rate 21.2 21.2 8.5
19. Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each):

None

20. If Shut Down at End of Report Period Estimated Date of Startup:

September 1. 1989

21. Units in Test Status (Prior to Commercial Operation): N/A

l

's.

Document Control Desk

' August-Monthly Operating Report Page 3 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS l

DOCKET NO.:

50/395 UNIT:

V. C. SUMMER I DATE:

09/01/89 COMPLETED BY:

J. W. HALTIWANGER TELEPHONE:

(803) 345-4297 AUGUST 1989 Method of TYPE Shutting F or S Duration Down the Corrective Actions /

No.

Date Reason rorced or (Hours)

Reactor or Comments Scheduled Reducing Power 8

890825 F

157.9 A

2 Replace Pressurizer Safety Valve

, '.. c ;

. ~.

Document l Control Desk n

l<

August Monthly Operating Report Page 4' ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.:

50/395 ljNIT:

V. C. SUMMER I DATE:

09/01/89 COMPLETED BY:

J. W. HALTIWANGER TELEPHONE:

(803) 345-4297 AUGUST 1989 During the month of August, the unit operated at approximately 100% power until it was taken offline ori the 25th.

On August 25, leakage through a pressurizer safety valve had increased sufficiently to warrant a reactor shutdown. As the controlled shutdown progressed, the pressurizer safety valve lifted and a manual reactor trip was initiated at 1004 hours0.0116 days <br />0.279 hours <br />0.00166 weeks <br />3.82022e-4 months <br />. The subsequent pressure drop reseated the valve before reaching the safety injection (SI) setpoint.

The valve was replaced and-the unit was in Mode 3 in preparation for reactor startup at the end of the month.

- _ - - _ _ _ _ _ - _ _ _ _