ML20247K637

From kanterella
Jump to navigation Jump to search
Forwards Sser 8 for Plant,For Approval.All Comments Addressed to Satisfaction of Reviewers.W/O Encl
ML20247K637
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 05/24/1989
From: Wessman R
Office of Nuclear Reactor Regulation
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8906010346
Download: ML20247K637 (3)


Text

1

~

MAY 2 41989 Docket Nos. 50-443 and 50-444 L

MEMORANDUM FOR: Steven A. Varga, Director-Division of Reactor Frojects I/II i

THRU:

Bruce A. Boger, Assistant Director for Region I Reactors l

Division _of Reactor Projects I/II FROM:

Richard H. Wessman, Director i

Project Directorate I-3 4

Division of Reactor Projects I/II

SUBJECT:

ISSUANCE OF SEABROOK STATION UNITS 1 AND 2, SUPPLEMENT 8 TO THE SER He have prepared Supplement No. 8 (SSER 8) to the Safety Evaluation Report for-Seabrook Station, Units 1 and 2.

A draft copy of SSER 8 was initially dis-1 tributed to appropriate Assistant Directors, Branch Chiefs, and OGC on September 1, 1988. Since that time some additions, changes and corrections have been presented to appropriate branch reviewers and OGC. All comments have been addressed to the satisfaction of the reviewers and OGC.

Please signify your approval by signing below and by signing the enclosed Form I

426.

!l S

Dante) 4/vif DondJ l

ferRichardH.Wessman, Director Project Directorate I-3 j

Division of Reactor Projects I/II l

Enclosures:

I fjo 1.

Seabrook SSER #8 g

2.

Form 426

/

rio Rfn Approval:

g/

Ous C

k ate %s gg er Steven A. Varga, Director, Division of Reactor Projects I/II

-co l

5"

Contact:

Victor Nerses, PDI-3 X21441 DISTRIBUTION: DockeYFile,NRC& Loc:1PDRs,PDI-3r/f,SVarga,BBoger, og VNerses, MRushbrook, JSniezek i

[SEABROOK SUPLE. 8 TO SER]

pfD I i

  • See previous concurrence A

,,J/

/

DFC :PDI-3

PDf-p /

[

$ : AD h

p ; p-----

1...------:------------:

NAME :MRu rook :VNer es:mw :

ssman

B ger

~

4.....--:------------:------------:------------:-----------

1


:------------:- h 89

5/18/89 DATE:5/h69

]

5/%//89
5/

0FFICIAL RECORD COPY

Ol(

an arc f.

.,9,1 UNITED STATES g

NUCLEAR REGULATORY COMMISSION

': j WASHING TON, D. C. 20555 j

\\-

/

_ uw a

~~

Docket Nos. 50-443 an'd 50-444 ffEMORANDUM FOR: Steven A.-Varga, Director Division of Reactor Projects I/II THRU:

Bruce A. Boger, Assistant Directo for Region I Reactors j

Division of Reactor Projects I/I FROM:

Richard H. Wessman, Director Project Directorate I-3 Division of Reactor Projects I/II

SUBJECT:

ISSUANCE OF SEABROOK STATION UNITS 1 AND 2, SUPPLEMENT 8 TO THE SER We have prepared Supplement No. 8 (SSER 8) to the Safety Evaluation Report for Seabrook Station, Units I and 2.

A draft copy of SSER 8 was initially dis-tributed to appropriate Assistant Directors, Branch Chiefs, and OGC on September 1, 1988. Since that time some addition <, changes and corrections have been presented to appropriate branch reviewers and OGC. All comments have been addressed to the satisfaction of the reviewers and OGC.

Please signify your approval by signing below and by signing the enclosed Form 426.

w

=_ -

Richard H. Wessman, Director Project Directorate I-3 Division of Reactor Projects I/II

Enclosures:

1.

Seabrook SSER iP8 2.

Form 426 Approval:

{} ~

JtevenA.Varga,girector,DivisionofReactorProjectsI/II Contat.t:

Victor Nerses, PDI-3 X21441 l

,pDk' 4%gpnana k UNITED STATES ug

  • ! ) ').v, g

NUCLEAR REGULATORY COMMISSION j

WASHINGTON, D. C. 20SSG s. o[

.,nm Docket Nos. 50-443 and 50-444 f1EMORANDUM FOR: Steven A. Varga, Director Division of Reactor Projects I/II Bruce A. Boger, Assistant Directo [f<

THRU:

for Region I Reactors j

Division of Peactor Projects I/I FROM:

Richard H. Wessman, Director Project Directorate I-3 Division of Reactor Projects I/II

SUBJECT:

ISSUANCE OF SEABROOK STATION UNITS 1 AND 2, SUPPLEMENT 8 TO THE SER We have prepared Supplement No. 8 (SSER 8) to the Safety Evaluation Report for Seabrook Station, Units I and 2.

A draft copy of SSER 8 was initially dis-tributed to appropriate Assistant Directors, Branch Chiefs, and OGC on September 1, 1988. Since that time some additions, changes and corrections have been presented to appropriate branch reviewers and OGC. All coments have been addressed to the satisfaction of the reviewers and OGC.

l Please signify your approval by signing below and by signing the enclosed Form 426.

'I i

[

Richard H. Wessman, Director Project Directorate I-3 Division of Reactor Projects I/II

Enclosures:

1.

Seabrook SSER #8 2.

Form 426 Approval:

M JtevenA'.Varga, irector, Division of Reactor Projects I/II

Contact:

Victor Nerses, PDI-3 J

X21441 I

1 i

j