Informs of Completed Installation of Generator no-load Disconnect Switch Which Permits Backfeed to Be Acceptable Delayed Access Source of Offsite Power.Licensee Is Now in Full Compliance W/Requirements of 10CFR50.63
ML20247H553
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 05/12/1998
From: Wanczyk R
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BVY-98-71, NUDOCS 9805210196
Download: ML20247H553 (2)


Text

- _ _ _ _ _ _ _ - _ _ _ - _ - _ _ _

VERMONT YANKEE s

.-p NUCLEAR POWER CORPORATION 185 Old Ferry Road, Brattleboro, VT 05301 7002 (802) 257-5271 May 12,1998 BVY 98-71 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

References:

(a)

Letter, VYNPC to USNRC, BVY 97-57, dated April 29,1997 (b)

Letter, USNRC to VYNPC, NVY 97-62, dated May 1,1997 l

(c)

Letter, VYNPC to USNRC, BVY 97-67, dated May 29,1997 (d)

Letter, USNRC to VYNPC, NVY 94-85, Supplemental Safety Evaluation of Station Blackout Analysis, dated June 1,1994 (e)

Letter, VYNPC to USNRC, BVY 97-130 TS Proposed Change No.194, Revision of Offsite Power Requirements, dated October 10,1997 (f)

Letter, USNRC to VYNPC, NVY 98-39, Issuance of Amendment No.155 to Facility Operating License No. DPR-28, dated March 24,1998

Subject:

Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)

Cr.moliance With 10CFR50.63. Station Blackout i

In Reference (a), Vermont Yankee concluded that it was crediting the Vernon Tie Line as a source of offsite power to meet the offsite power system licensing basis for the station. As a result, the Vernon Tie could not also be credited as a Station Blackout source to meet the requirements of 10CFR50.63.

Reference (a) provided the NRC a copy of a Basis for Maintaining Operation (BMO), which addressed l

non-compliance with the Station Blackout Rule and indicated that we would restore full compliance prior to startup from the 1998 refueling outage.

In Reference (c) Vermont Yankee provided its plans to implement modifications to the existing backfeed through the main generator step-up transformer to make the backfeed an acceptable delayed access source l

of offsite power. With this modification now installed, the Vernon Tie, which was previously approved as an acceptable Station Blackout Alternate AC source by Reference (f), is no longer credited as a delayed access offsite power source and becomes available to meet the requirements of 10CFR50.63.

In Reference (e), Vermont Yankee submitted proposed Technical Specification changes which clarify offsite power system requirements and remove credit for the Vernon Tie as a delayed access offsite power source. Reference (f) issued an amendment to the Vermont Yankee Technical Specifications approvir g these changes.

This letter is written to inform the NRC that Vermont Yankee has completed installation of a generator no-load disconnect switch which permits the backfeed to be an acceptable delayed access source of offsite power. The Vernon Tie is now designated as the Station Blackout Alternate AC source and as a

\\u 10CFR50, Appendix R Alternative Shutdown AC Power Source. Vermont Yankee concludes that we are in full compliance with the requirements of 10CFR50.63 as previously approved in Reference (d).

g 9805210196 980512 PDR ADOCK 05000271 P

PDR

ERM m YAMEE NW1. EAR POWER CORPORADON

os Docket No. 50-271 BVY 98-71 Page 2 Should you have any questions concerning this matter, please contact us.

Sincerely, VERMONT YANKEE NUCLEAR POWER CORPORATION

/ Ws

~ lA~~

// (/

~

Robert J. Wan~ y Director of Sa and Regulatory Affairs cc:

USNRC Region 1 Administrator USNRC Project Manager - VYNPS USNRC Resident Inspector - VYNPS Vermont Department of Public Service