Text
l g
F tAs %
y.
- g NUCLEAR REGULATORY COMMISSION g
REGION IV g
611 RYAN PLAZA DRIVE. SUITE 400
'+9 ARLINGTON, T F XAS 760118064 May 14,1998 S. K. Gambhir, Division Manager Engineering & Operations Support Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 i
SUBJECT:
EMERGENCY RESPONSE PLAN CHANGES Dear Mr. Gambhir.
This letter acknowledges receipt of your "LIC-97-0173, Constitutes Initial Response within 30 Days Required by GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps. OPPD Plans to Submit Info Requested by [[generic letter" contains a listed "[" character as part of the property label and has therefore been classified as invalid.,within 90 Days|letter dated November 5,1997]], which transmitted changes the Fort Calhoun Station Radiological Emergency Response Plan submitted under the provisions of 10 CFR 50.54(q).
Based on your determinations that the changes do not decrease the effectiveness of your emergency plan, and that the plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to Part 50, NRC approvalis not required.
Our initial review of these changes indicates that the changes are in accordance with 10 CFR 50.54(q). Implementation of these changes will be subject to inspection to confirm that they have not decreased the effectiveness of your emergency plan and continue to meet regulatory requirements.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Public Document Room.
Sincerely, f
g Blaine Murray, Chief U
Plant Support Branch Division of Reactor Safety Docket No.:
50-285 License No.: DPR-40 9805200341 980514
/
fDR ADOCK 05000285 PDR
Omaha Public Power District cc:
James W. Tills, Manager Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 James W. Chase, Manager Fort Calhoun Station P.O. Box 399 Fort Calhoun, Nebraska 68023 Perry D. Robinson, Esq.
Winston & Strawn 1400 L Street, N.W.
Washington, D.C. 20005-3502 Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Cheryl Rogers, LLRW Program Manager Environmental Protection Section Nebraska Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 i
L
l
'l Omaha Public Power District I DISTRIBUTION:
DCD (A045)
Regional Administrator DRS-PSB DRP Director -
i Branch Chief (DRP/B)
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
Resident inspector MIS System RIV File DRS Action item File (2) (97-E-0046)(Hodges)
DOCUMENT NAME: G:\\DRSLTRS\\EP.MLD\\FC9807EP. LOO TAC #x03414 G:\\DRSLTRS\\EP.MLD\\FC9807EP.M00 To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy l
RIV:PSB E
C:DRS\\PSB f
THAndrews:nh -on<
BMurray &
l 05/W98 054t$8 OFFICIAL RECORD COPY l
l l
a
.t 9
6 l
o Omaha Public Power District DISTRIBUTION:
DCD (A045)??
Regional Administrator DRS-PSB DRP Director Branch Chief (DRP/B)
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
Resident inspector MIS System RIV File DRS Action Item File (2) (97-E-0046)(Hodges)
DOCUMENT NAME: G:\\DRSLTRS\\EP.MLD\\FC9807EP.L00 TAC #x03414 G:\\DRSLTRS\\EP.MLD\\FC9807EP.M00 To receive copy of document, indicate in box:"C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy RIV:PSB
.E C:DRS\\PSB THAndrews:nh -<*<
BMurray &
05/W98 054t$8 OFFICIAL RECORD COFY l
'1002.5