Supplemental Deficiency Rept CP-87-122 Re Nozzle Load Interfaces.Initially Reported on 880105.Corrective Action Completion Date for Unit 1 Revised Until Prior to Fuel Load. Unit 2 Status Unchanged
ML20247G583
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/24/1989
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CP-87-122, TXX-89519, NUDOCS 8907280119
Download: ML20247G583 (1)


Text

-

-l ja

.N Log # TXX-89519 1

F11# # 10110 i

l-r C

903.10 Ref. # 10CFR50.55(e) 7UELECTRIC l

WiHimm J. Cahill, Jr.

Executive Vice hesident U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N05. 50-440 AND 50-446 N0ZZLE LOAD INTERFACES

.SDAR: CP-87-122 (SUPPLEMENTAL REPORT) l Gentlemen:

On January 5,1988 TU Electric notified the NRC via report logged TXX-88026 of varf ous equipment nozzle loads which were deemed to be reportable under the provisions of 10CFR50.55(e).

The latest report on this issue was logged TXX-89045 dated January 30, 1989. The purpose of this report is to revise the.

Unit I corrective action implementation schedule for this item.

The Unit I corrective actions will be completed prior to Unit I fuel load.

l The Unit 2 sthtus has not changed.

l Sincerely, 1

William J. Cahill, Jr.

1 n

By:

D. R. Woodlan Docket Licensing Manager CBC/dje c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)