Applicant Exhibit A-78,consisting of Forwarding Global Reach,Inc Capabilities Brochure Detailing Svcs in Areaof Emergency Preparedness.W/O Brochure
ML20247G432
Person / Time
Site: Seabrook  
Issue date: 04/25/1989
From: Sikich G
GLOBAL REACH, INC.
To: Saldarini J
EBASCO SERVICES, INC.
References
OL-A-078, OL-A-78, NUDOCS 8905300399
Download: ML20247G432 (5)


Text

,

m y77 n

. Q.;

_ f:

^

GLOBAL REACH. lNC.

N-cotN a

a n.m ca unis.u. nu.

u us,m.u. isnus.unan umc L

'89 MY 23 P2 :01 '

L RECEIVND arm _ =:

n CUCnl M u T

NOV 2 c.1985 h-E Mr.-James Saldarini

.TEBAsCo.

O C SALDARINI ICE"World Trade Center

!Nrw' York, New York-10048 November 21, 1985

,cDsar Mr. Saldarini, p

I"am currently preparing my consulting schedule for 1986. I am

'also-in<the process of re-negotiating my consulting services-contract

>zwith Carolina Power & Light Co., where I have been providing consulting services in the area of Emergency Preparedness since Jonriy 1985. However, I contemplate some flexibility within the currently scheduled tasks.for 1986 at Carolina Power L Light Co.; and wich to expand the scope of my services for 1986 by providing consulting-services in the following areas:

  • Management Development
  • Procedure Development
  • Training I-have enclosed Global Reach's capabilities brochure detailing thn scope,of our services and a copy of my resume for your review.
Should you have any questions,or anticipate'a match between our
ssrvices and your needs call me at the following telephone numbers L

'(919) 362-2005 (Office), (919) 851-7665 (Assignment Residence), (219)

924-4885 (Residence).
Sincerely, NUCI
, EAR REGULATORY COMMISSION
  1. -q 3mc

.GEARY W. SIKICH e manet of bil.%_. Official Exh, no 7f

- I Prosident L CEO Sve.,

(o, jg

__ IDENDFIE0 2 3 ff RECEIVEDf}cly I

o ConVg O!!'r-

~

Contractor [~f.

Omer

~ pyg f

' i! ness _

j

'8905300399 Ev0 05 NW'kr PDR ADOCK 05000443e G

PDR s

.k,.!.I l.t u --.-

-=u-~=-=__-__---___-___-____

E g[y.,. '.

N

~ ~ ~ ~ ~ ' - ~ ~ ~

~~

- R b-Wj t

o-

)

s 9

-w o

GEARY.W.:SIKICH-S'*

i

.i

' '1646. Cardinal Drive-

'l

- Munster, LIndiana 46321

]

~

W (219) 924-4885 4

g

,c

. EDUCATION-gy M.A.,' MANAGEMENT WITE CONCENTRATION INLBUSINESS ADMINISTRATION Central. Michigan University,(ongoing)~

.p

-M.Ed., EDUCATIONAL PSYCHOLOGYl fqy University of Texas _at El Paso, 1981 g

.B.S.,. CRIMINOLOGY,' Indiana St' ate University, Terre Haute, Indiana,1973 g<

"t

. PROFESSIONAL EXPERIENCE' PRESIDENT and CHIEF EXECUTIVE OFFICER, GLOBAL REACH, Munster Indiana.

(

November 1984 to Present (r.;

{

KEY ACCOMPLISHMl:NTS:

-Initiated the start-up, procedures to establish a Chicago-based consulting. firm.

g

-Facilitated the design, development and implementation of Emergency Management programs.

v

-Successfully developed clients'in the following industries:

    • Public Utilities
    • Energy Consulting

-Developed in-house training programs on Time Management Techniques for middle and executive managers.

LEAD SENIOR ENGINEER, IMPELL CORPORATION, Bannockburn, Illinois i

January 1984 to November 1984 KEY ACCOMPLISHMENTS:

4

-Provided general management consulting services to two major electric utilities.

-Tormulated operating procedures for Texas Utilities Generating Company.

-Formulated management training programs for Texas Utilities Generating Company.

+

u.____.____.__..__

j

.0 J

1 GEARY W. SIKICH Page 2

-Designed and developed Emergency Resources Management-plan, procedures and executive training program for the State of Illinois.

SENIOR ENGINEER, IMPELL CORPORATION, Bannockburn, Illinois May 1983 to January 1984 KEY ACCOMPLISHMENTS:

-Formulated and implemented emergency management plan for Texas Utilities Generating Company.

-Responsible for project coordination, planning, scheduling, development of program goals, objectives and i

training of key management personnel.

-Successfully conducted NRC required emergency preparedness appraisal three months after being assigned proj ect.

-Successfully conducted NRC required emergency preparedness exercise five months after being assigned project.

SENIOR TRAINING SPECIALIST, DETROIT EDISON COMPANY, Detroit, Michigan. August 1981 to May 1983 KEY ACCOMPLISHMENTS:

-Responsible for the design, development and implementation of self-paced / group-paced mediated instruction programs for corporate and operational staff.

-Facilitated the development of long-range goals, plans and budgets.

-Conducted presentation's to corporate management and a

public officials.

-Successfully conducted NRC required emergency preparedness exercise four months after being assigned project.

-Developed and implemented a training workbook rated by industry regulators as being years ahead of current industry standards.

RESEARCH ANALYST, SCIENCE APPLICATIONS, El Paso, Texas March 1979 to August 1981 KEY ACCOMPLISHMENTS:

6*

e Geary W. Sikich Page 3

-Responsible for management of training programs designed for the largest U.S. Army training c_e,nter.

I

-Developed data analysis methodologies designed to determine organizational effectiveness of large units.

-Developed a Supervised On-The-Job. Training (50JT) system for the senior staff of the Royal Saudi Navy.

-Conducted job and task analysis for' electric utility power plant security as a consultant to the NRC.

U.S. ARMY OFFICER, July 1973 to February 1979 KEY ACCOMPLISHMENTS:

-Senior Representative.

U.S. Army Intelligence Center and School. Responsible for the design, construction and testing of a prototype training facility for the U.S.

Army.

-Executive Manager, Responsible for organization, management and implementation of a prototype system for collection, analysis and dissemination of intelligence information for senior executive decision-makers.

-Executive Training Manager, Designed, developed, scheduled, and implemented two courses of instruction utilizing Instructional System Development (ISD).

-Information Manager, U.S. Army. Responsible for strategic planning, management of technical analysis, developing trend data, conducting information analysis on telecommunications, electrical systems, highway, waterway, rail, air transportation and natural resource systems.

Supervised the maintenance of computer files and published weekly intelligence reports. Managed the security and disposition of classified documents.

-Chief Information Analyst, Directed strategic studies for Joint Chiefs of Staff (JCS) and Army Chief of Staff Intelligence (ACSI).

Supervised Lines of Communications / Telecommunication strategic studies.

Developed intelligence reports and strategic plans for world crisis areas.

REFERENCES References and additional information available upon request.

e n.

L

?-l -

I a

PUBLICATIONS / PAPERS Sikich, Geary'W... National Training Center Live Fire Exercicas:

Military Intelligence Magizine; 1978.

Sikich, Geary W., National. Training Center; Live Fire Phase I

~

Comp 1etion: Military Intelligence Magazine;.1979.

-Sikich, Geary W., Royal Saudi. Navy. Supervised.On-The-Job Training (S0JT), Vol. I-VIII, Science Applications, Inc.; 1981.

Sikich, Geary W.,

Radiological Emergency Response Preparedness 3

Training Instruction Manual, Detroit Edison Company; 1982.

Sikich, Geary W., Global Reach: : Lifestyle Management Planning (unpublished pending copywright); 1982.

Sikich, Geary W., Aspects of Strategic / Managerial Planning; Impe11 Corporation; 1983.

Sikich, Geary W., Developing Strategic Plan for Emergency Planning at Impe11 Corporation: Impe11 Corporation; 1983.

' Sikich, Geary W.

. Surviving in a Competitive Environment: - The Need for Strategic Planning in Small and Medium-Sized Oil and Gas Companies: Submitted for publication to 011 and Gas 2nvestor Magazine; February,1984.

1 M

.