ML20247G235
| ML20247G235 | |
| Person / Time | |
|---|---|
| Site: | Mcguire, Catawba, McGuire, 05000000 |
| Issue date: | 03/28/1989 |
| From: | Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19302D796 | List: |
| References | |
| NUDOCS 8904040172 | |
| Download: ML20247G235 (1) | |
Text
..
l-p..
e.
_ [ j, y.,
=
-6 DUKE POWER GOMPAhT f'
P.O. BOX 33180 l4 CHARLOTTE, N.C. 28f612 MAL B. TUCKER Teternown vmm renameNT.
(704) 373-4531 NUCL&AS PRODUCTION March 28,.1989 l
p U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington,;.D. C.
20555
Subject:
McGuire Nuclear Station Docket Numbers 50-369 and -370 Catawba Nuclear Station Docket Numbers 50-413 and -414 Topical Report DPC-NE-2011P,
" Nuclear Design Methodology for Core Operating Limits of Westinghouse Reactors";
Response to Request for Additional Information Attached are responses to questions regarding the subject topical report, which were transmitted.by letter dated March 3, 1989.
Please note that the proprietary nature of the original topical report, as identified in my April 27, 1988 transmittal letter and accompanying affidavit, is maintained in the responses to these questions. Therefore, they should be:
withheld from public disclosure.
Very truly yours, s#,h /d M
H. B. Tucker SAG 154/lcs xc:
Mr. Darl S. Hood, Project Manager Mr. W. T. Orders Office of Nuclear Reactor Regulation NRC Resident Inspector U. S. Nuclear Regulatory Commission Catawba Nuclear Station Washington, D. C.
20555 Mr. P. K. Van Doorn Dr. Kahtan Jabbour, Project Manager NRC Resident Inspector Office of Nuclear Reactor Regulation McGuire Nuclear Station U. S. Nuclear Regulatory Commission Washington, D. C.
20555 1
1 Mr. S.-D. Ebneter, Regional Administrator U. S. Nuclear Regulatory Commission Region II go[
101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 I
3 8904040172 890328 PDR ADOCK 05000369 P
.-__b