Category:CORRESPONDENCE-LETTERS
MONTHYEARML20155H9301998-11-0404 November 1998 Forwards Listed Canceled Financial Assurance Documents Re Decommissioning of Cintichem Facility in Tuxedo,Ny.Without Encls ML20154H6341998-10-0505 October 1998 Responds to Requesting That Order on Consent for Case D200059005 Be Terminated.Released from All Requirements Set in Order,Effective 981005 ML20237C4981998-08-19019 August 1998 Informs That Commission Has Issued Encl Order Terminating FOL R-81 for Cintichem 5 Megawatt Open Pool Nuclear Research Reactor IAW 901019 Application.Copies of Amend 16 to Idemnity Agreement B-14 Encl for Signature.Se & EA Encl ML20237C5491998-08-19019 August 1998 Informs That NRC Completed Review of Info Submitted by Cintichem,Inc to Support Decommissioning of Tuxedo,Ny Facility.No Further Remediation or Actions W/Respect to NRC Regulated Matl Required,Based on Conclusions ML20197C7691998-07-28028 July 1998 Responds to Requesting Amend to Order on Consent Case D200059005.Amend 10 Which Requires That Sampling of 001 Outfall & Retention Pond Continue Encl ML20236L7321998-06-0808 June 1998 Informs of Completed Review of Final Status Survey Rept for Decommissioning of Bldg 4.Facility May Be Released from Radiological Control.License Termination,Encl ML20236S0211998-06-0202 June 1998 Forwards Confirmatory Surveys of Bldgs & Areas of Cintichem Facility Located in Tuxedo,Ny.Radionuclide Concentration in Bedrock Soil Samples & Orise Resrad Calculation,Encl ML20248D6681998-05-27027 May 1998 Requests That Process for Terminating Licenses R-81 & SNM-639 Be Resumed Due to All Radioactive Matl Having Been Removed as Final Condition for Termination Subject Licenses ML20216C5311998-04-15015 April 1998 Forwards Results of NRC TLD Direct Radiation Monitoring Around Cintichem Facility for Fourth Quarter of 1997.Final Rept Due to Termination of Program ML20217Q6411998-02-10010 February 1998 Responds to Requesting Mod to Ref Order on Consent.Amend 9 to Order,Authorizing Most Changes Requested Enclosed ML20202A8051998-02-0202 February 1998 Forwards Amend 10 to License SNM-639,in Resonse to 971204 Request to Amend Decommissioning Plan for Tuxedo,Ny Facility to Reduce off-site Environ Monitoring Program ML20202E1941998-01-28028 January 1998 Forwards Amended Table Which Includes Sr-90 Data Re Final Survey of Soils at 001 Outfall.Conclusion That Survey Results Meet Soils Acceptance Criteria Has Not Changed ML20202E1841998-01-28028 January 1998 Forwards Revised Tables Including Sr-90 Analytical Results. Five Individual Samples from Adjacent Locations Consolidated Into One Sample for Sr-90 Analysis ML20202E4781998-01-19019 January 1998 Forwards Cintichem Final Status Survey Plan & Rept,Per Section 7 of Licensee Radiopharmaceutical Facilities Decommissioning Plan.W/O Encl ML20199C2511998-01-0202 January 1998 Responds to Concerning Status of mixed-waste at Cintichem Site.Attached Table Presents Overview of Radioactively Contaminated Waste That Remains to Be Disposed of from Decommissioning Project ML20198C8521997-12-23023 December 1997 Forwards Result of NRC TLD Direct Radiation Monitoring Around Cintichem Facility, for Third Quarter of 1997 ML20199B6091997-10-22022 October 1997 Forwards Characterization Rept for Union Carbide Spoils Area Tuxedo,Ny.Area Meets Criteria for Unrestricted Use ML20217G2501997-10-0808 October 1997 Forwards Response to 970819 RAI Re Survey Repts of Hot Laboratory Support Bldgs & Outdoor Areas Inside & Outside of RCA ML20199B6151997-10-0303 October 1997 Responds to 971002 Request for Mod to Order on Consent Case D200059005.Amend to Order on Consent Authorizing Changes Encl ML20199B6601997-10-0202 October 1997 Requests That Order on Consent D200059005 Be Amended to Allow for Delay in Analysis of Water Samples from S-12 for Gamma Emitting Radionuclides,As Currently Done W/Analysis for Sr-90 ML20211C5501997-09-22022 September 1997 Forwards Bedrock Dose Assessment Rept, Which Completes Final Survey Process.W/One Oversize Drawing ML20210R8271997-08-22022 August 1997 Forwards Results of NRC TLD Direct Radiation Monitoring for Second Quarter of 1997 ML20210Q6631997-08-19019 August 1997 Requests That Listed Info Be Submitted in Order to Complete Preliminary Review of Sections 11-18 of Cintichem Final Plant & Rept Submitted by 970606,27,0703,25 & 30 Ltrs ML20210L8541997-08-0505 August 1997 Informs That Responsibility for Non-Power Reactor Insp Program Has Been Transferred from Regional Ofc to Nrr.All Activities Re Non-Power Reactors Including Licensing,Insp & Operator Licensing Will Be Responsibility of NRR ML20149G7981997-07-0303 July 1997 Forwards Chapters 15 & 16 of Final Survey Repts for Cintichem Outdoor Areas Outside Former RCA, Which Describes Cintichem'S Approach to Conducting Final Survey for Areas of Property ML20149G9111997-06-27027 June 1997 Forwards Chapters 13 & 14 Final Survey Repts for Cintichem Outdoor Areas Inside of Former Rca. Chapter 14 Presents Results of Survey ML20140H0591997-04-24024 April 1997 Informs of Completion of All Remediation Work & Final Surveys Per Cintichem Decommissioning Plan.Will Submit Last Sections of Final Survey Rept for Review & Approval in May ML20137W1391997-04-0303 April 1997 Discusses Radiological Characterization Plan for Union Carbide Spoils Area ML20135D1601997-02-21021 February 1997 Forwards Results of TLD Direct Radiation Environ Monitoring Around Facility for Fourth Quarter of 1996 ML20133A4641996-12-20020 December 1996 Forwards Results of NRC TLD Direct Radiation Monitoring Around Cintichem Facility ML20133N0281996-12-19019 December 1996 Informs of Agreement to Extension of Deadlines for Weekly & Monthly Repts in Response to 961206 Request Re Reporting Requirements in Order of Consent Case D200059005 ML20132B6591996-12-0606 December 1996 Informs That License SNM-639 Will Remain in Effect Until Completion of Decommissioning Operations ML20134K7041996-11-14014 November 1996 Advises That SNM-639 License Expires on 961215,per Amend 7 Issued 950118.Request License Remain Effective Through June 1997,allowing Sufficient Time for Completing Work Outlined ML20134F7571996-10-29029 October 1996 Submits Response to Re Radiological Status of Bedrock at Tuxedo,Ny Facility ML20134F7611996-09-25025 September 1996 Provides Comments Re Ground Water Issues Raised at Cintichem Inc Decommissioning Project ML20078N4221995-02-0202 February 1995 Submits Comments Re Cintichem,Inc Decommissioning Proposed Bedrock Criteria ML20078K4791995-02-0101 February 1995 Confirms Discussions Had Yesterday & Morning Re Strontium-90 Analyses of Water Discharged Through 001 Outfall at Cintichem Site ML20059K1891994-01-14014 January 1994 Forwards Insp Repts 50-054/93-03 & 70-0687/93-03 on 931116- 18.No Violations Noted ML20058C9821993-11-22022 November 1993 Provides Results of NRC TLD Direct Radiation Monitoring Around Cintichem Facility for Third Quarter of 1993 ML20057C7521993-09-24024 September 1993 Expresses Appreciation for J Mcgovern Addressing Town Board & Public Re Decommissioning of Cintichem ML20057B7701993-09-14014 September 1993 Forwards FRN Discussing 930726 Final Rule on Decommissioning Recordkeeping & Documentation.W/O Encl ML20056H4001993-09-0101 September 1993 Responds to Re Towns Request for Status Rept on Licensees Decommissioning Project.Advises That Town Board Meeting Will Commence on 930922 & Outline of Planned Presentation Will Be Issued ML20057A5751993-08-31031 August 1993 Forwards Results of TLD Direct Radiation Monitoring at Facility for Second Quarter 1993 ML20056H1131993-08-27027 August 1993 Provides Clarification Re 930715 Exemption Request from Requirements of Revised 10CFR20 ML20056H4061993-05-25025 May 1993 Suggests That Meeting Date Be Set Up for Sept to Hold Discussions on Closing of Cintichem Reactor Facilities ML20128L3931993-02-11011 February 1993 Forwards Potential Effects of Cintichem-Proposed Residual Soil Criteria on Water Quality of Indian Kill Reservoir ML20128F2901993-02-0303 February 1993 Provides Clarification Re Use of Proposed Subsurface Soil Criteria ML20128B8781993-01-28028 January 1993 Confirms Meeting Arrangement W/Cintichem on 930201 in Tuxedo,Ny to Discuss Unrestricted Release Criteria for Soil at Ny Facility ML20127C1521993-01-0707 January 1993 Requests Assistance in Obtaining Info Re Residual Radiation Exposure Criteria for Decontamination & Decommissioning of Licensed Sites.Author Employed by DOE to Provide Assistance ML20127J5791993-01-0404 January 1993 Forwards Listed Proprietary Procedures for Soil from Teledyne,Per .Procedures Withheld 1998-08-19
[Table view] Category:NRC TO VENDOR/MANUFACTURER
MONTHYEARML20055F9111990-07-17017 July 1990 Forwards Amend 26 to License R-81 & Safety Evaluation.Amend Deletes Surveillance Requirements When Reactor Defueled & Does Not Require Ph & Conductivity Measurements to Be Made Weekly If No Fuel in Pool ML20055G2391990-07-10010 July 1990 Advises That Proposed Repair Plan for Canal & Gamma Pit Acceptable to Make Transfer Canal & Gamma Pit Serviceable for Described Uses Re Decommissioning Activities,Per Listed Refs ML20248G9801989-09-27027 September 1989 Forwards Safeguards Insp Repts 50-054/89-04 & 70-0687/89-04 on 890829-30.No Violations Noted ML20246C4881989-08-15015 August 1989 Forwards Exam Rept 50-054/89-03OL of Exams Administered on 890718-20 IR 05000054/19890021989-05-25025 May 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-054/89-02 & 70-0687/89-02 ML20247H2161989-05-18018 May 1989 Forwards Listings of Open NRC Insp Items for Info & Use in Gathering Documentation of Corrective Actions.Items Include, Leaking Radwaste Drum Sent to State of Nv & Adequacy of Licensee Air Sampling Methods ML20245J3921989-04-27027 April 1989 Forwards Radiological Controls Insp Repts 50-054/89-02 & 70-0687/89-02 on 890328-31 & Notice of Violation. Understands That Action Plan to Address Identified Weaknesses Will Be Developed & Submitted to NRC on 890430 ML20247F0501989-03-23023 March 1989 Advises That Reactor Operator & Senior Reactor Operator Licensing Exams Scheduled for 890718-20.Ref Matls,Listed on Encl,Should Be Provided by 890515 & License Applications Should Be Submitted 30 Days Prior to First Exam Date ML20246N7731989-03-22022 March 1989 Submits Update on Status of Research & Test Reactor Seminar Scheduled for 890418 & 19 in Region I.Topics to Be Discussed Include,Nrc Research Reactor Insp Program,Operator Licensing & Fitness for Duty.Info Re Lodging Encl ML20236D2041989-03-14014 March 1989 Forwards Amend 25 to License R-81 & Safety Evaluation.Amend Corrects Inconsistencies in Tech Specs & Changes Resulting from NRC Insp ML20236D0351988-12-0101 December 1988 Forwards Ltr to Nuclear Util Executives Re New Rule on Site Access for NRC Inspectors to Facility ML20206C1621988-10-13013 October 1988 Forwards Safety Insp Rept 50-054/88-03 on 880906-09 & Notice of Violation ML20154S3301988-09-27027 September 1988 Forwards Safety Insp Repts 50-054/88-02 & 70-0687/88-06 on 880809-11.No Violations Noted ML20154E6691988-09-13013 September 1988 Requests That Licensee Review LA-CP-87-02, Nonpower Reactor Sabotage Study & Provide Listed Info IR 05000054/19880011988-08-23023 August 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-054/88-01 & 70-0687/88-04 ML20151B3081988-03-31031 March 1988 Advises That 871109 & 880217 Revs to Physical Security Plan Consistent w/10CFR50.54(p) & 70.32(e) & Acceptable.Revs Withheld (Ref 10CFR73.21) ML20236D0431988-01-11011 January 1988 Discusses NRC Needs & Cintichem,Inc Procedures for Admitting NRC Personnel to Facility ML20236X8871987-12-0303 December 1987 Forwards Safeguards Insp Repts 50-054/87-05 & 70-0687/87-06 on 870908-11.No Violations Noted ML20235V5541987-10-0707 October 1987 Forwards Combined Safety Insp Repts 50-054/87-04 & 70-0687/87-05 on 870810-13.Violation Re Failure to Post Airborne Radioactivity Area Noted.No Notice of Violation Being Issued ML20237H4071987-08-12012 August 1987 Responds to 870709 Request That Recipient Response to NRC 861230 & 870211 Requests for Addl Info Be Withheld Per 10CFR2.790.Request Approved IR 05000054/19870681987-06-12012 June 1987 Forwards Meeting Summary Rept 50-054/87-68 on 870528 to Discuss Proposed Corrective Actions for Weaknesses Identified in Requalification Program Evaluation Rept 50-054/87-02OL ML20215F6421987-06-11011 June 1987 Informs of Recent NRR Reorganization.Organization Now Called Standardization & Non-Power Reactor Project Directorate. T Michaels Is Project Manager ML20214Q1771987-05-27027 May 1987 Informs That Insp Responsibility for Individual Research & Test Reactor Facilities Now Distributed Throughout Region I Div of Reactor Projects as Discussed in Encl.Encl 10CFR50 & 51 Final Rule Also Discussed ML20213G2581987-05-0808 May 1987 Forwards Requalification Program Evaluation Rept 50-054/87-02OL of Exam Administered on 870327.Requests Review & Assessment of Info & Individual Exams within 30 Days of Ltr Date ML20214H5661987-05-0101 May 1987 Forwards Safety Insp Rept 50-054/87-01 on 870120-23.No Violations Noted.Steps Taken to Correct Violations Noted in NRC Verified ML20206H2091987-04-0707 April 1987 Ack Receipt of 870204 Response to NRC Re Insp Repts 50-054/86-04 & 70-0687/86-05 ML20210T0921987-02-11011 February 1987 Forwards Request for Addl Info Re 860918 Application for Unique Purpose Exemption from Use of Low Enriched U Fuel Per 10CFR50.64(c)(1).Requests Written Response within 30 Days ML20212D7601986-12-30030 December 1986 Forwards Request for Addl Info to Continue Review of 860918 Application for Unique Purpose Exemption to Convert from High to Low Enriched U Fuel.Response Requested No Later than 60 Days from Ltr Date ML20207P2651986-12-29029 December 1986 Advises That 861031 Rev to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & 70.32(e) & Acceptable ML20214L8491986-11-25025 November 1986 Forwards Insp Repts 50-054/86-02 & 70-0687/86-03 on 860806-08 & Notice of Violation.Measures Taken to Prevent Recurrence of Violation Re Inadequate Control of Access to Facility Should Be Addressed in Response ML20207A8001986-11-0404 November 1986 Forwards Exam Rept 50-054/86-03OL Administered on 860917-18 ML20211G4231986-10-31031 October 1986 Requests Remittance of Fee Due for 830808 Rev 1 to Facility Emergency Plan within 15 Days of Ltr Receipt IR 05000054/19860011986-09-0202 September 1986 Ack Receipt of 860513 & 29 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-054/86-01 & 70-0687/86-02.Understands Amended Responses Will Be Submitted by 860905,per 860828 Telcon ML20204J7761986-08-0505 August 1986 Requests Fee for 830803 Application Transmitting Rev 1 to Union Carbide Facility Emergency Plan ML20206N6121986-06-19019 June 1986 Informs That Reactor Operator & Senior Reactor Operator Licensing Exams Scheduled for 860917-18.Ref Matls Listed in Encls Should Be Furnished by 860715.License Applications Should Be Sent 60 Days Before Exam ML20203C7881986-04-14014 April 1986 Forwards Safeguards Insp Repts 50-054/86-01 & 70-0687/86-02 on 860210-14 & Notices of Violation ML20210H8821986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20141A1271986-03-27027 March 1986 Advises That TC Elsasser Will Replace EC Mccabe as Cognizant Section Chief,Based on Realignment of Region I Projects, Effective on 860331 ML20199F3761986-03-20020 March 1986 Discusses 860127 Unauthorized Shipment of Spent Fuel at Region 1 Research Reactor Subsequent to 851231 Expiration of License.Info Submitted as Reminder Re Responsibilities for Ensuring Timely Renewal of NRC-approved QA Programs ML20141K5471986-01-17017 January 1986 Lists Types of Applications Which Fall Under 6-month Billing Process,Per 840620 Rev to 10CFR170, Fees for Facilities & Matls Licenses & Other Regulatory Svcs.... Bills Will Be Issued in Dec & June IR 05000054/19850041985-12-13013 December 1985 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-054/85-04 & 70-0687/85-07 ML20137Q6571985-11-14014 November 1985 Forwards Exam Rept 50-054/OL-85-05 Administered During Wk of 851007 ML20135E0561985-08-19019 August 1985 Forwards Executed Amend 14 to Indemnity Agreement B-14 Reflecting Transfer of Indemnity from Union Carbide Corp to Cintichem,Inc.Signed Original Returned to H Bernard on 850909 ML20134B1191985-07-29029 July 1985 Forwards Safeguards Insp Repts 50-054/85-02 & 70-0687/85-03 on 850424-26.No Violations Noted ML20128M5521985-07-0202 July 1985 Forwards Amend 23 to License R-81,notice of Issuance & Safety Evaluation.Amend Changes Licensee Name from Union Carbide Subsidiary B,Inc to Cintichem,Inc ML20133B9961985-05-22022 May 1985 Partial Response to 850409 FOIA Request for All Background Matls on Proposed Sale of Reactor by Union Carbide to Hoffman-LaRoche & Hearing Date.Forwards Documents Listed in App A.Documents Also Available in PDR IR 05000054/19820021982-07-0909 July 1982 Forwards IE Safeguards Insp Repts 50-054/82-02 & 70-0687/82-04 on 820510-14.No Noncompliance Noted ML20055B6541982-07-0808 July 1982 Forwards IE Insp Rept 50-054/82-03 on 820601-04 & Notice of Violation ML20054H4271982-06-11011 June 1982 Forwards Corrected Page 2 of Safety Evaluation Transmitted on 820506 ML20125D8541980-01-0202 January 1980 Approves 791212 Request for Extension Until Jan 1980 to Complete Annual Requalification Examinations.All Future Examinations May Be Given in Jan 1990-07-17
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20155H9301998-11-0404 November 1998 Forwards Listed Canceled Financial Assurance Documents Re Decommissioning of Cintichem Facility in Tuxedo,Ny.Without Encls ML20237C5491998-08-19019 August 1998 Informs That NRC Completed Review of Info Submitted by Cintichem,Inc to Support Decommissioning of Tuxedo,Ny Facility.No Further Remediation or Actions W/Respect to NRC Regulated Matl Required,Based on Conclusions ML20237C4981998-08-19019 August 1998 Informs That Commission Has Issued Encl Order Terminating FOL R-81 for Cintichem 5 Megawatt Open Pool Nuclear Research Reactor IAW 901019 Application.Copies of Amend 16 to Idemnity Agreement B-14 Encl for Signature.Se & EA Encl ML20216C5311998-04-15015 April 1998 Forwards Results of NRC TLD Direct Radiation Monitoring Around Cintichem Facility for Fourth Quarter of 1997.Final Rept Due to Termination of Program ML20202A8051998-02-0202 February 1998 Forwards Amend 10 to License SNM-639,in Resonse to 971204 Request to Amend Decommissioning Plan for Tuxedo,Ny Facility to Reduce off-site Environ Monitoring Program ML20198C8521997-12-23023 December 1997 Forwards Result of NRC TLD Direct Radiation Monitoring Around Cintichem Facility, for Third Quarter of 1997 ML20210R8271997-08-22022 August 1997 Forwards Results of NRC TLD Direct Radiation Monitoring for Second Quarter of 1997 ML20210Q6631997-08-19019 August 1997 Requests That Listed Info Be Submitted in Order to Complete Preliminary Review of Sections 11-18 of Cintichem Final Plant & Rept Submitted by 970606,27,0703,25 & 30 Ltrs ML20210L8541997-08-0505 August 1997 Informs That Responsibility for Non-Power Reactor Insp Program Has Been Transferred from Regional Ofc to Nrr.All Activities Re Non-Power Reactors Including Licensing,Insp & Operator Licensing Will Be Responsibility of NRR ML20135D1601997-02-21021 February 1997 Forwards Results of TLD Direct Radiation Environ Monitoring Around Facility for Fourth Quarter of 1996 ML20133A4641996-12-20020 December 1996 Forwards Results of NRC TLD Direct Radiation Monitoring Around Cintichem Facility ML20132B6591996-12-0606 December 1996 Informs That License SNM-639 Will Remain in Effect Until Completion of Decommissioning Operations ML20134F7571996-10-29029 October 1996 Submits Response to Re Radiological Status of Bedrock at Tuxedo,Ny Facility ML20059K1891994-01-14014 January 1994 Forwards Insp Repts 50-054/93-03 & 70-0687/93-03 on 931116- 18.No Violations Noted ML20058C9821993-11-22022 November 1993 Provides Results of NRC TLD Direct Radiation Monitoring Around Cintichem Facility for Third Quarter of 1993 ML20057B7701993-09-14014 September 1993 Forwards FRN Discussing 930726 Final Rule on Decommissioning Recordkeeping & Documentation.W/O Encl ML20057A5751993-08-31031 August 1993 Forwards Results of TLD Direct Radiation Monitoring at Facility for Second Quarter 1993 ML20128B8781993-01-28028 January 1993 Confirms Meeting Arrangement W/Cintichem on 930201 in Tuxedo,Ny to Discuss Unrestricted Release Criteria for Soil at Ny Facility ML20125E5481992-12-0404 December 1992 Submits Request for Addl Info to Enable NRC to Continue Review of 921022 Responses to NRC 920923 RAI Re Proposed Residual Soil Contamination Limits for Facility.Procedures to Be Used to Collect Soil Samples Should Be Described ML20058G3621990-10-25025 October 1990 Forwards Insp Repts 50-054/90-04 & 70-0687/90-06 on 900727, 0823 & 1018.No Violations Noted.Reactor Pool Sys Can Be Operated at 10-ft Water Level for Uses Related to Decommissioning Activities,Per 901004 Telcon ML20055F9111990-07-17017 July 1990 Forwards Amend 26 to License R-81 & Safety Evaluation.Amend Deletes Surveillance Requirements When Reactor Defueled & Does Not Require Ph & Conductivity Measurements to Be Made Weekly If No Fuel in Pool ML20055G2391990-07-10010 July 1990 Advises That Proposed Repair Plan for Canal & Gamma Pit Acceptable to Make Transfer Canal & Gamma Pit Serviceable for Described Uses Re Decommissioning Activities,Per Listed Refs ML20248G9801989-09-27027 September 1989 Forwards Safeguards Insp Repts 50-054/89-04 & 70-0687/89-04 on 890829-30.No Violations Noted ML20246C4881989-08-15015 August 1989 Forwards Exam Rept 50-054/89-03OL of Exams Administered on 890718-20 IR 05000054/19890021989-05-25025 May 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-054/89-02 & 70-0687/89-02 ML20247H2161989-05-18018 May 1989 Forwards Listings of Open NRC Insp Items for Info & Use in Gathering Documentation of Corrective Actions.Items Include, Leaking Radwaste Drum Sent to State of Nv & Adequacy of Licensee Air Sampling Methods ML20245J3921989-04-27027 April 1989 Forwards Radiological Controls Insp Repts 50-054/89-02 & 70-0687/89-02 on 890328-31 & Notice of Violation. Understands That Action Plan to Address Identified Weaknesses Will Be Developed & Submitted to NRC on 890430 ML20247F0501989-03-23023 March 1989 Advises That Reactor Operator & Senior Reactor Operator Licensing Exams Scheduled for 890718-20.Ref Matls,Listed on Encl,Should Be Provided by 890515 & License Applications Should Be Submitted 30 Days Prior to First Exam Date ML20246N7731989-03-22022 March 1989 Submits Update on Status of Research & Test Reactor Seminar Scheduled for 890418 & 19 in Region I.Topics to Be Discussed Include,Nrc Research Reactor Insp Program,Operator Licensing & Fitness for Duty.Info Re Lodging Encl ML20236D0161989-03-14014 March 1989 Responds to Expressing Concerns Re Application of 10CFR50.70 to Nonpower Reactors.Listed Items Will Clarify Regulations & NRC Implementation as Applied to Nonpower Reactors ML20236D2041989-03-14014 March 1989 Forwards Amend 25 to License R-81 & Safety Evaluation.Amend Corrects Inconsistencies in Tech Specs & Changes Resulting from NRC Insp ML20236D0351988-12-0101 December 1988 Forwards Ltr to Nuclear Util Executives Re New Rule on Site Access for NRC Inspectors to Facility ML20206C1621988-10-13013 October 1988 Forwards Safety Insp Rept 50-054/88-03 on 880906-09 & Notice of Violation ML20154S3301988-09-27027 September 1988 Forwards Safety Insp Repts 50-054/88-02 & 70-0687/88-06 on 880809-11.No Violations Noted ML20154E7051988-09-13013 September 1988 Informs of Certain NRC Security Precautions & Procedures Re Use of Facility for Temporary Storage for Study on Radiological Sabotage in non-power Reactors ML20154E6691988-09-13013 September 1988 Requests That Licensee Review LA-CP-87-02, Nonpower Reactor Sabotage Study & Provide Listed Info IR 05000054/19880011988-08-23023 August 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-054/88-01 & 70-0687/88-04 ML20151W4941988-08-16016 August 1988 Forwards Amend 24 to License R-81 & Safety Evaluation. Amend Changes Tech Specs to Account for Substitution of Keithley Log-N Amplifier ML20151B3081988-03-31031 March 1988 Advises That 871109 & 880217 Revs to Physical Security Plan Consistent w/10CFR50.54(p) & 70.32(e) & Acceptable.Revs Withheld (Ref 10CFR73.21) ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20196K1521988-03-0808 March 1988 Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively IA-87-825, Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively1988-03-0808 March 1988 Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively ML20147D0421988-02-29029 February 1988 Requests That Recipient Resubmit Proposal to Convert to Low Enriched U Fuel to Meet 10CFR50.64(6)(2) or (3) Requirements by 880327.Identical Ltrs Sent to Listed Dockets ML20236D0431988-01-11011 January 1988 Discusses NRC Needs & Cintichem,Inc Procedures for Admitting NRC Personnel to Facility ML20236X8871987-12-0303 December 1987 Forwards Safeguards Insp Repts 50-054/87-05 & 70-0687/87-06 on 870908-11.No Violations Noted ML20235V5541987-10-0707 October 1987 Forwards Combined Safety Insp Repts 50-054/87-04 & 70-0687/87-05 on 870810-13.Violation Re Failure to Post Airborne Radioactivity Area Noted.No Notice of Violation Being Issued ML20238B1181987-08-12012 August 1987 Ack Receipt of Informing NRC of Organizational Changes.Changes & Heightened Attention to Radiation Safety Program Important to Developing Needed Improvements in Mgt of Facility ML20237H4071987-08-12012 August 1987 Responds to 870709 Request That Recipient Response to NRC 861230 & 870211 Requests for Addl Info Be Withheld Per 10CFR2.790.Request Approved IR 05000054/19870681987-06-12012 June 1987 Forwards Meeting Summary Rept 50-054/87-68 on 870528 to Discuss Proposed Corrective Actions for Weaknesses Identified in Requalification Program Evaluation Rept 50-054/87-02OL ML20215F6421987-06-11011 June 1987 Informs of Recent NRR Reorganization.Organization Now Called Standardization & Non-Power Reactor Project Directorate. T Michaels Is Project Manager 1998-08-19
[Table view] |
Text
-_ _ _ - . - . . . _ _ - _ _ _ _ _
.,; y.
1
.-u
[
- UNITED STATES NUCLEAR REGULATORY COMMISSION
- - j ,7 g
- REGION 1
Docket No. 50-54 Cintichem,:Inc.
ATTN: .Mr. James J.'McGovern Plant Manager P. O. Box 816
- Tuxedo, New. York 10987
. Gentlemen:
SUBJECT:
REACTOR OPERATOR AND SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation between Mr. M. Johnson, Reactor Supervisor, and Mr.
D.. Silk, Examiner, arrangements were made for the administration of licensing examinations at the Cintichem Reactor.
The written examinations are tentatively scheduled for July. 18,'1989. The
. operating examinations are scheduled for July 19-20, 1989.
To meet the above schedule, it will be necessary for you to furnish the reference material listed in Enclosure 1 " Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations," by May 15, 1989.. Any delay.in receiving approved, properly bound and indexed reference material, or the submittal of inadequate or incomplete reference material may result in the examination being rescheduled. Mr. Johnson has been advised of our reference material requirements, and the address where each set is to be mailed.
You are. responsible for providing adequate space and accommodations for administration of the written examinations. Enclosure 2, " Requirements for Administration of Written Examination,"- describes our requirements for conducting these examinations.
Enclosure 3 contains the Rules and Guidelines that will be in effect during the administration of the written examination. The facility management is responsible for ensuring that all applicants are aware of these rules.
The facility staff review of the written examination will be conducted in accordance with requirements specified in Enclosure 4, " Requirements for Facility Review of Written Examinations."
All completed reactor operator and senior reactor operator license applications should be submitted at least 30 days before the first examination dates so that we will be able to review the training and experience of the candidates, process the medical certifications, and prepare final examiner assignments after applicant eligibility has been determined. If the applications are not received at least 30 days before the examination dates, it is likely that a postponement will be necessary.
Mr. Johnson has been informed of the above requirements, p 8904030299 890323 f(
PDR ADOCK 05000054 0FFICIAL RECORD COPY V PDC ;
Cintichem, Inc. This request is covered by Office of Management and Budget Clearance Number 3150-0101 which expires May 31, 1989. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material. Comments on the accuracy of this estimate and suggestions to reduce the burden may be directed to the Office Of Management and Budget, Paperwork Reduction Project 3150-0101), Room 3208, New Executive Office Building, Washington D.C. 20503, and the U.S. Nuclear Regulatory Commission, Records and Reports Management Branch, Office of Information Resources Management, Washington, D.C. 20555.
Thank you for your consideration in this matter. If you have any questions regarding the examination procedures and requirements, please contact me at (215) 337-5327.
Sincerely, 9 J Peter W. Ese)/ roth, Chief Pressurized llater Reactor Section Operations Branch, DRS
Enclosures:
- 1. Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations
- 2. Requirements for Administration of Written Examinations
- 3. NRC Rules and Guidelines for Written Examinations
- 4. Requirements for Facility Review of Written Examinations cc w/ enclosures:
T. Vaughn, Manager, Health Safety and Environmental Affairs D. D. Grogan, Manager, Radiochemical Production W. G. Ruzicka, Nuclear Operations Manager Plant Manager Public Document Room (PDR)
Nuclear Safety Information Center (HSIC)
State of New York
}.'.
Cintichem, Inc. ,
ibec w/ enclosures: ..
Region I Docket Room (with concurrences)!
Training Manager DRP Section Chief
-Chief Examiner-Assigned Examiners OL Facility File-i l
l ..
h h 3/27/89 3/f.J/89 v'
0FFICIAL RECORD COPY l 1' l..,
E _ ----__ --_-_ __ _
~
ENCLOSURE 1 REFERENCE MATERIAL REQUIREMENTS FOR REACTOR / SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS
- 1. Existing learning objectives, Job Performance Measures and lesson plans (including training manuals, plant orientation manual, system descrip-tions, reactor theory, thermodynamics, etc.)
All Job Performance Measures (JPMs) used to acertain the competence of the operators in performing tasks within the control room complex and, as !
idenH fied in the facility JTAs, outside of the control room, i.e., local oper d ons.
Training materials shall include all substantive written material used for preparing applicants for initial R0 licensing. The written material shall include . learning objectives and the details presented during lectures, rather than outlines. Training materials shall be identified by plant bound, tabbed, and indexed. FAILURE TO PROVIDE COMPLETE, PROPERLY BOUND AND INDEXED PLANT REFERENCE MATERIAL MAY RESULT IN THE RETURN OF THE MATERIAL TO THE PERSON WHO IS THE HIGHEST LEVEL OF CORPORATE MANAGEMENT WHO IS RESPONSIBLE FOR PLANT OPERATIONS. ACCOMPANYING THE MATERIAL WILL BE A COVER LETTER EXPLAINING THE DEFICIENCIES IN THE REFERENCE MATERIAL AND THE FACT THAT THIS WAS THE REASON THE EXAMINATIONS WERE CANCELLED OR POSTPONED. Training materials which include the following shall be '
provided:
System descriptions including descriptions of all operationally relevant flow paths, components, controls and instrumentation.
System training material should draw parallels to the actual procedures used for operating the applicable system.
Complete and operationally useful descriptions of all safety-system interactions and, where available, system interactions under emergency and abnormal conditions, including consequences of antit cipated operator error, maintenance error, and equipment failure.
- Training material used to clarify and strengthen understanding of emergency operating procedures.
- Comprehensive theory material that includes fundamentals in the area of theory of reactor operation, thermodynamics, heat transfer and fluid flow, as well as specific application to actual in-plant components. For example, mechanical theory material on pumps shall include pump theory as well as descriptions of how these principles actually apply to major plant pumps and the systems in which they are installed Reactor Theory material shall include descriptions that draw explicit ties between the fundamentals and the actual operating limits followed in the plant (i.e., reactor theory material should contain explanations how principles relate to the actual curves used by operators to verify shutdown margin or calculate an ECP).
l
4
.w . .
i 2
- 2. Complete Procedure Index (including surveillance procedures, etc.)
~
All Administrative- Procedures (as : applicable -to reactor operation 'or 3.
safety) q.
All. integrated plant. procedures (normal or general operating procedures)
'4.
- 5. ' All . emergency procedures (emergency instructions, abnormal or special procedures).
- 6. Standing ' orders (important orders that are safety related and may super-sede the regular procedures)
- 7. Surveillance procedures (procedures that are run frequently, i.e. weekly or that can be run on the simulator)
- 8. Fuel-handling :and core-loading procedures, (initial core-loading procedure,-when' appropriate) 9 .' All annunciator / alarm' procedures
- 10. Radiation protection manual (radiation control manual or procedures)
- 11. Emergency plan implementing procedures
- 12. -Technical Specifications (and interpretations, if available).
- 13. System Operating Procedures
- 14. Piping and . Instrumentation diagrams, electrical single-line diagrams, or flow diagrams
- 15. Technical Data Book, and/or Plant curve information as used by operators and f acility precautions, limitations, and set points (PLS) for the facility
- 16. Questions and answers specific to the facility training program which may be used in the written or operating examinations (voluntary by f acility licensee)
- 17. Additional material required by the examiners to develop examinations that meet.the requirements of these standards and the regulations.
The above reference material shall be approved, final issues and shall be so marked. If a plant has not finalized some of the material, the Chief Examiner shall verify with the facility that the most complete, up-to-date material is available and that agreement has been reached with the licensee for limiting changes before the administration of the examination. All procedures and reference material shall be bound with appropriate indices or tables of contents so that they can be used efficiently. Failure to provide complete,
. properly bound and indexed plant reference material could result in cancellation or rescheduling of the examinations as discussed in the cover letter.
t ENCLOSURE ?, j l REQUIREMENTS FOR ACM.'NISTRATION OF WRITTEN EXAMINATIONS
- 1. A single room shall be prov,ded for administration of the written examination. The location of this room and supporting restroom facilities shall . be such as to prevent contact with all other facility and/or contractor personnel during the written examination. If necessary, the facility should make arrangements for the use of a suitable room at a local school, moi.el, or other building. Obtaining this room is the ;
responsibility of the licensee. !
- 2. Minimum spacing is required to ensure examination integrity as determined by the Chief Examiner. Minimum spacing should be one applicant per table, with a three foot space between tables.
- 3. Suitable arrangements shall be made by the facility if the applicants are to have lunch, coffee, or other refreshments. These arrangements shall comply with Item 1 above and shall be reviewed by the examinct and/or proctor.
- 4. The facility licensee shall provide pads of 8-1/2 by 11 inch lined paper in unopened packages for each applicant's use in completing the examination. The examiner shall distribute these pads to the applicants.
- 5. Applicants may bring pens, pencils, calculators or slide rules into the examination room. Only black ink or da"k pencils should be used for writing answers to questions.
- 6. The licensee shall provide one set of steam tables for each applicant.
The examiner shall distribute the steam tables to the applicants. No wall charts, models, and/or other training materials shall be present in the examination room. No other equipment or reference material shall be allowed unless provided by the examiner.
1 l
I
[
u .
ENCLOSURE 3 PROCEDURES FOR THE ADMINISTRATION OF WRITTEN EXAMINATIONS
- 1. Check identification badges.
- 2. Pass'out examinations and all handouts.. Remind applicants not to review examination until instructed to do so.
READ THE FOLLOWING INSTRUCTIONS VERBATIM:
During the administration of this examination the following rules apply:
- 1. Cheating on the examination means an automatic denial of your application end could. result in more severe penalties..
- 2. After.the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have not received or given assistance in completing the examination. This must be done after you complete the examinatt :.
READ THE FOLLOWING INSTRUCTIONS
- 1. Restroom trips are to be limited and only one applicant at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid'even the ypearance or possibility of cheating.
- 2. Use. black ink or dark pencil only to facilitate legible reproductions. '
- 3. Print your name in the blank provided in the upper right-hand corner of '
the examination cover sheet.
- 4. Fill in the date on the cover sheet of the examination (if necessary).
- 5. You may write your answers on the examination questior page or on e separate sheet cf paper. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.
- 6. If you write your answers on the examination question page and you need more space to answer a specific question, use a separatc sheet of the paper provided and insert it directly after the specific question. DO NOT WRITE ON THE BACK SIDE OF THE EXAMINATION QUESTION PAGE.
- 7. Print your name in the upper right hand corner of the first page of each l section of your answer sheets whether you use the examination question i pages or separate sheets of paper. Initial each page.
- 8. Before you turn in your examination, consecutively number each answer sheet, including any additional pages inserted when writing your answers on the examination question page.
'2
- 9. .If you are using separate sheets, number each answer as to category and- i number (i.e. A1.01, C3.05) and. skip at least 3 lines between answers to '
allow space for grading.
- 10. Write "End of Category " at the end of your answers to a category.
- 11. Start each category on a new page.-
- 12. Write "Last Page" on the last answer sheet.
- 13. Use abbreviations only if they are commonly used in facility literature.
Avoid using symbols such as or signs to avoid a simple transposition error resulting in an incorrect answer. Write it out.
- 14. The point value for each question is indicated in parentheses after the question. The amount of blank space on an examination question page is NOT an indication of the depth.of answer required.
- 15. Show all calculations, methods, or assumptions used to obtain an answer.
- 16. Partial credit may be given. Therefore, ANSWER ALL PARTS OF THE QUESTION AND DO NOT LEAVE ANY ANSWER BLANK.
- 17. Propoi tional grading will- be applied. Any additional wrong information that is provided may count against you. For example, if a question is worth one point and asks for four responses, each of which is worth 0.25 points, and you give five responses, each of your responses will be worth 0.20 points. If one of your five ' responses is incorrec.t,- 0.20 will be deducted and your total credit for that question will be 0.80 instead of 1.00 even though you got the four correct answers.
- 18. If the intent of a question is unclear, ask questions of the examiner only.
A
- 19. When turning in your examination, assemble the completed examination with examination questions, examination aids and an:wer sheets. In addition, turn in all scrap paper.
- 20. To pass the examination, you must achieve an overall grade of 80% or greater and at least 70% in each category.
- 21. There is a time limit of (6) hours for completion of the examination.
(or some other time if less than the full examination is taken.)
- 22. When you are dor,e and have turned in your examination, leave the examination area (DEFINE THE AREA). If you are found in this area while the examination is still in progress, your license may be denied or revoked.
l 1
l l
ENCLOSURE 4 REQUIREMENTS FOR FACILITY REVIEW 0F URITTEN EXAMINATIONS
- 1. At the option of the Chief Examiner, the facility may review the written examination up to two weeks prior to its administration. This review may take place at the facility or in the Regional office. The Chief Examiner will coordinate the details of the review with the facility. An WRC examiner will always be present during the review.
When this option of examination revi is utilized, the facility reviewers will sign the following statement r <rior to being allowed access to the examination. The examination or written notes will not be retained by the facility.
- a. Pre-Examination Security Agreement I agree that I will not knowingly divulge any information concerning the replacement (or initial) examination scheduled for to any unauthorized persons. I understand that I am not to participate in any instruction involving those reactor operator or senior reactor operator applicants scheduled to be administered the above replacement (or initial) examination from now until after the examination has been administered. I understand that violation of this security agreement could result in the examination being voided.
Signature /Date In addition, the facility staff reviewers will sign the following statement after the written examination has been administered. >
- b. Post-Examination Security Agreement
- I did not, to the best of knowledge, divuloe any information concerning the written examination administered on to any unauthorized persons. I did not participate in providing any instruction to those reactor operator and senior reactor operator applicants who were administered the examination from the time that I was allowed access to the examination.
Signature /Date
< ~
)
i j I
i
- 2. Regardless of whether the ,above examination review option is exercised, imediately following the administration of the written examination, the 1 facility staff shell be provided a marked up copy of the examination and the answer key. The copy of the written examination shall include pen and iak changes made to questions during the examination administration. {
If the facility did not review the examination prior to its administration, they will have five (5) working days from the day of the written examination to submit formal comments. If the facility reviewed the examination prior to its administration, e.ny additional coments must be given to an examiner prior to his/her leaving the site at the end of the week of the written examination administration. In either case, the coments will be addrecsed to the responsible Regional Office by the 2 highest on site level of corporate management responsible for plant operations, A copy of the submittal will be forwarded to the Chief Examiner, as appropriate. Comments not submitted within the required time frame will be considered for inclusion in the grading process on a case-by-case basis by the Regional Office Section Chief. Should the coment submittal deadline not be met, a long delay in grading the examination may occur.
- 3. The following format should be adhered to for submittal of specific comments:
- a. Listing of NRC Quescion, answer and reference
- b. Facility comment / recommendation
- c. Reference (to support facility coment)
NOTES: 1. No change to the examination will be made without submittal of of a reference to support the facility comment. Any supporting documentation that was not previously supplied, should b6 l
provided.
l
- 2. Coments made without a concise facility recommendation will not be addressed.
- 4. A two hour post examination review may be held at the discretion of the l Chief Examiner. If this review is held, the facility staff should be l informed that only written coments that are properly supported will be considered in the grading of the examination.
l l