Notice of Violation from Insp on 890110-0220.Violation Noted:On 880825,1115 & 890111,reactor Startups Performed W/O Manual Reactor Trip Channel Functional Test Being Accomplished within Preceding 7 Days
ML20247E938
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/20/1989
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20247A777 List:
References
50-317-89-03, 50-317-89-3, 50-318-89-03, 50-318-89-3, NUDOCS 8904030274
Download: ML20247E938 (1)


Text

V T

'-I l

l q

l l

APPENDIX A 8

Notice of Violation Baltimore Gas and Electric Company Docket ~No.:

'50-317

)

Calvert Clif fs Nuclear Power Plant

. License No.: DPR-53 As a result of. the inspection conducted on January 10.- February 20,11989,-and in accordance with the NRC-Enforcement Policy (10 CFR 2, Appendix C) the fol-1 lowing violation was identified:

-l Technical Specification 4.3.1.1~ requires that "Each reactor = protection instrumentation channel shall be demonstrated operable by the' performance i

of. the Channel Check, Channel Calibration and Channel Functional ' Test l

operations for. the modes and at the frequencies shown.in < Table: 4.3.1."

Table 4.3.1 requires that _a-channel functional test of the manu' al reactor trip be performed prior to a reactor startup if.not completed within the:

past seven (7) days.

.a Contrary to the

above, on August 25, 1988, November 15, 1988, and q

January 11, 1989, reactor startups were performed. withuut'.the -manual reactor trip channel functional test being accomplished within: the pre-l ceding seven (7) days.

This is a Severity Level IV violation (Supplement I).

'1, Pursuant to the provisions of 10 CFR 2.201, Baltimore Gas and: Electric.Compa'ny is hereby required to submit to this office within thirty. days of the date of-this Notice,. a written statement or explanation in' reply, ~includingi (1) the corrective steps which have been taken~and the results achieved; (2) corrective steps which will be taken to avoid further violations; and-(3) the date when-full compliance will be achieved.

. here good cause is 'shown, consideration W

will be given to extending the response time,

..i l

\\