Amend 52 to License NPF-38,revisng App a Tech Specs to Show New Location for One Backup Seimic Monitors
ML20247D929
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/23/1989
From: Calvo J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20247D933 List:
References
NUDOCS 8903310255
Download: ML20247D929 (7)


Text

,.

,e; pun

'o,,

UNITED STATES i

[

g NUCLEAR REGULATORY COMMISSION d

E WASHINGTON, D. C. 20065

$g.....,/

-l LOUISIANA POWER AND LIGHT COMPANY DOCKET NO. 50-382 WATERFORD STEAM ELECTRIC STATION, UNIT 3 AMENDMENT TO FACILITY OPERATING. LICENSE Amendment No.52 l

License No. NPF-38 1.

The Nuclear Regulatory Comission (the Co, mission) has found that:

A.

The application for amendment by Louisiana Power and Light Company (the licensee) dated December 23, 1988, complies with the standards and requirements of the Atomic Energy Act 4

of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

Thereisreasonableassurance(1)thattheactivitiesauthorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and f

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

l 8903310255 890323 I

PDR ADOCK 05000382 l

P PDC 1

.s l

. 2.

Accordingly, tha license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No.

NPF-38 is hereby amended to read as follows:

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised

[!

through Amendment No.52, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION g/,

&4w ose A. Calvo, Director Project Directorate - IV Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Attachment:

Ch6nges to the Technical Specifications Date of Issuance:

March 23, 1989

ATTACHMENT TO LICENSE AMENDMENT NO. 52 TO FACILITY OPERATING LICENSE NO. NPF-38 DOCKET N0. 50-382 Replace the following pages of the Appendix A Technical Specifications with the att6ched pages. The revised pages are identified by Amendment number and contain vertical lines indicating the areas of change. The corresponding overleaf pages are also provided to maintain document completeness.

Remove Insert 3/4 3-36 3/4 3-36 3/4 3-37 3/4 3-37 1

5

b " '-

INSTRUMENTATION SEISMIC INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.3 The seismic monitoring instrumentation shown in Table 3.3-7 shall be OPERABLE.

APPLICABILITY: At all times.

e ACTION:

a.

With one or more seismic monitoring instruments inoperable for more than 30 days, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 10 days outlining the cause of the malfunction and the plans for restoring the instrument (s) to OPERABLE status.

b.

The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

I SURVEILLANCE REQUIREMENTS 4.3.3.3.1 Each of the above seismic monitoring instruments shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations at the frequencies shown in Table 4.3-4.

4.3.3.3.2 Each of the above seismic monitoring instruments which is accessible during power operation and which is actuated during a seismic event (one or more basemat accelerations of 0.05 g or greater) shall be restored to 0PERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and a CHANNEL CALIBRATION performed within 5 days.

Data shall be retrieved from the accessible actuated instruments and analyzed to determine the magnitude of the vibratory ground motion. A Special Report

- shall be prepared and submitted to the Commission pursuant to Specification 6.9.2 within 10 days describing the magnitude, frequency spectrum, and resultant effect upon facility features important to safety.

Each of the above seismic monitoring instruments which is actuated during a seismic event (one or more basemat accelerations of 0.05 g or greater) but is not accessible during power operation shall be restored to OPERABLE status and a CHANNEL CALIBRATION performed the next time the plant enters MODE 3 or below. A supplemental report shall then be prepared and submitted to the Commission within 10 days pursuant to Specification 6.9.2 describing the additional data from these instruments.

WATERFORD - UNIT 3 3/4 3-35 i

__m___

l l

TABLE 3.3-7 SEISMIC MONITORING INSTRUMENTATION MINIMUM MEASUREMENT INSTRUMENTS INSTRUMENTS AND SENSOR LOCATIONS RANGE OPERABLE 1.

Triaxial Time-History Accelerograph System a.

Accelerometer (YT-SM 6000) Adjacent to RB -35 ft MSL 0.02-1.0 g 1

b.

Accelerometer (YT-SM 6001) RB +46 ft MSL 0.02-1.0 g 1

c.

Accelerometer (YT-SM 6002) Free Field Yard Area 0.02-1.0 g 1

d.

Starter Unit (YS-SM 6000) Adjacent to RB

-35 f t MSL 0.01-0.02 g 1

e.

Starter Unit (YS-SM 6001) RB +51 ft MSL 0.01-0.02 g 1

f.

Recorder (YR-SM 6000) Control Room RAB +46 ft MSL 0.02-1.0 g 1

g.

Control Unit (YZ-SM 6000) Control Room RAB +46 ft MSL 0.02-1.0 g 1*

h.

Playback Unit (YR-SM 6001) Control Room RAB +46 ft MSL 0.02-1.0 g 1

2.

Triaxial Peak Accelerographs a.

YR-SM 6020 RB +56 ft MSL 0-2 g 1

b.

YR-SM 6021 RB 23 ft MSL 0-2 g 1

l c.

YR-SM 6022 RAB +21 ft MSL 0-2 g 1

3.

Triaxial Seismic Switches a.

Seismic Swtich (YS-SM 6060) RB -35 ft MSL 0.1-0.25 g 1

b.

Control Unit (YZ-SM 6060) Control Room RAB +46 ft MSL 0.1-0.25 g 1*

4.

Triaxial Response-Spectrum Recorders a.

YR-SM 6040 RB +10 ft MSL 1-32 Hz, 0-2 g 1

b.

YR-SM 6041 RAB -35 ft MSL 1-32 Hz, 0-2 g I

c.

YR-SM 6042 RA3 +21 ft MSL 1-32 Hz, 0-2 g 1

d.

Peak Shock Annunciator (YR-SM 6045)

RB -35 ft MSL 1-32 Hz, 0-2 g 1

e.

Peak Shock Annunciator Control Unit (YZ-SM 6045) Control Room RAB +46 ft MSL 1-32 Hz, 0-2 g 1

"With reactor control room annunciation.

WATERFORO - UNIT 3 3/4 3-36 AMENDMENT NO. 14,52

s" TABLE 4.3-4 SEISMIC MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL CHANNEL CHANNEL FUNCTIONAL INSTRUMENTS AND SENSOR LOCATIONS CHECK CALIBRATION TEST 1.

Triaxial Time-History Accelerograph System a.

Accelerometer (YT-SM 6000) Adjacent to RB -35 ft MSL N.A.

R SA b.

Accelerometer (YT-SM 6001) RB

+46 ft MSL N.A.

R SA c.

Accelerometer (YT-SM 6002) Free Field Yard Area N.A.

R SA d.

Starter Unit (YS-SM 6000) Adjacent to RB -35 ft MSL M

R SA e.

Starter Unit (YS-SM 6001) RB

+51 ft MSL M

R SA f.

Recorder (YR-SM 6000) Control Room RAB +46 ft MSL M

R SA g.

Control Unit (YZ-SM 6000) Control Room RAB +46 ft MSL M

R SA*

h.

Playback Unit (YR-SM 6001) Control Room RAB +46 ft MSL N. A.

R SA 2.

Triaxial Peak Accelerographs a.

YR-SM 6020 RB +56 ft MSL N.A.

R N.A.

b.

YR-SM 6021 RB 23 ft MSL N.A.

R N. A.

l c.

YR-SM 6022 RAB +21 ft MSL N.A.

R N. A.

3.

Triaxial Seismic Switches a.

Seismic Switch YS-SM 6060 RB -35 ft MSL M

R SA b.

Control Unit YZ-SM 6060 Control l

Room RAB +46 ft MSL M

R SA*

4.

Triaxial Response-spectrum Recorders a.

YR-SM 6040 RB +10 ft MSL N.A.

R N.A.

b.

YR-SM 6041 RAB -35 ft MSL N.A.

R N.A.

l c.

YR-SM 6042 RAB +21 ft MSL N.A.

R N.A.

d.

Peak Shock Annunciator YR-SM 6045 RB -35 ft MSL N.A.

R N.A.

e.

Peak Shock Annunciator Control Unit YZ-SM 6045 Control Room RAB

+46 ft MSL N.A.

R SA "With reactor control room annunciation.

WATERFORO - UNIT 3 3/4 3-37 AMENDMENT NO. H,52

s.

~

INSTRUMENTATION METEOROLOGICAL INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.4 The meteorological monitoring instrumentation channels shown in Table 3.3-8 shall be OPERABLE.

APPLICABILITY: At all times.

ACTION:

i With one or more required meteorological monitoring channels a.

inoperable for more than 7 days, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2.within the next 10 days outlining the cause of the malfunction and the plans for restoring the channel (s) to OPERABLE status.

b.

The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.4 Each of the above meteorological monitoring instrumentation channels shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK and CHANNEL CALIBRATION operations at the frequencies shown in Table 4.3-5.

I 1

1 WATERFORD - UNIT 3 3/4 3-38