ML20247D838
| ML20247D838 | |
| Person / Time | |
|---|---|
| Issue date: | 03/17/1989 |
| From: | Berlinger C Office of Nuclear Reactor Regulation |
| To: | Green W INSTITUTE OF NUCLEAR POWER OPERATIONS |
| References | |
| NUDOCS 8903310235 | |
| Download: ML20247D838 (5) | |
Text
, _.
l ~
MAR 171999 9
Mr. Wade Green =
Institute of Nuclear Power Operations Suite 1500, 1100 Circle 75 Parkway
~ Atlanta, Georgia 30339-3064
Dear Mr. Green:
f.
Enclosed for your information is our biweekly listing of generic communi-cations' being considered or under development by the NRC staff.
These include.
Bulletins (type coded BL.on the list), Information Notices (IN) and Generic Letters (GL). Temporary Instructions,' that cover the special NRC inspection effort resulting from certain generic communications, are' listed with the type-code TI. This listing includes all proposed generic communications that had been reported to us by March 15, 1989..
. Sincerely, Original Signed By Carl H. Bar!!ngcr Carl H. Berlinger, Chief Generic Communications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation
Enclosure:
As stated DISTRIBUTION w/ enclosure:
JLieberman, OE All NRC Division Directors All NRC Branch Chiefs CERossi, NRR CHBerlinger, NRR r6e s PDR tcanissWt%33 J/V93 CCS 00EA R/F-OGCB R/F DKirkpatrick R/F 093 SRichardson, DOE i
RBarber, DOE 3
OGCB:D0EA:NRR
-C/0GCB:D0EA:NRR DCKirkpatri CHBerlinger 03///f/890[ck 03////89
~ s9033i0235 890317 6'
Pcga No.
1 MAR 171999 j
03/15/89 PROPOSED GENERIC COMMUNICATIONS l
IN PREPARATION WITHIN THE NRC l
TP ORIGIN.
SUBJECT CONTACT PHONE ISSUE j
OFFICE DATE j
i IN NRR/DRIS ENVIRONMENTAL QUALIFICATION Steve (301) 05/18/89 RVIB OF LIMITORQUE MOV ACTUATOR Alexander 492-0995 TERMINAL BLOCKS & MARATHON 1600 TERMINAL BLKS IN NRR/ DEST ERRORS IN CALIBRATION OF Joe Joyce (301) 04/28/89 SICB LEAD / LAG AND RATE CIRCUITS IN 492-3265 REACTOR PROTECTION SYSTEMS.
GL NRR/DLPQ SAFETY PARAMETER DISPLAY Dick (301) 03/31/89 SYSTEM - ACCEPTABLE METHODS Eckenrode 492-1014 OF IMPLEMENTING REQUIREMENTS GL RES/DE SAFETY RELATED MOTOR OPERATED Owen (301) 04/04/89 EIB VALVE TESTING AND INSPECTION Rothberg 492-3924 IN RES/EME LIMITOROUE SMA SPRING Jerry (301) 04/14/89 DEFORMATION Weidenhamer 492-3839 GL NRR/DOEA CHANGE IN FORMAT FOR NRC Vern Hodge (301) 05/01/89 OGCB GENERIC COMMUNICATIONS 492-1169 GL N3R/ DEFT SUPPLEMENT TO GENERIC LETTER Shou-Nien (301) 05/01/89 EMEB 87-11 DEALING WITH ARBITRARY Hou 492-0904 INTERMEDIATE PIPE RUPTURE REQUIREMENTS GL NRR/ DEST INSERVICE INSPECTION OF Robert (301) 04/04/89 EMTB PRESSURE RETAINING WELDS IN Hermann 492-0911 THE REACTOR VESSEL GL AEOD LICENSEE COMMITMENTS FOR John (301) 04/21/89 EMERGENCY RESFONSE DATA Jolicoeur 492-4155 SYSTEM (ERDS) IMPLEMENTATION OL NRR/ DEST N9R RECOMMENDATION ON ISI OF Chen P.
Tan (301) 05/01/89 ESGB MARK I & II STEEL 492-0829 CONTAINMENTS, REFUELING CAVITIES & ASSOC DRAINAGE SYS I
GL NRR/ DEST RESOLUTION OF GENERIC ISSUE Om P.
(301) 07/31/89 GELB B-36, DIEGEL RELIABILITY Chopra 492-0835 GL NRR/ DEST INSERVICE TESTING FOR PUMPS Ted (301) 03/17/89 EMEB AND VALVES S all i van 492-0901 GL NRR/DOEA LINE ITEM TECHNICAL Tom Dunning (301) 06/01/89 CTSB SPECIFICATION IMPROVEMENT -
492-1189 l
REMOVAL OF COMPONENT LISTS l
fPagg'No.
2 03/.15/89 PROPOSED GENERIC COMMUNICATIONS
+.
IN PREPARATION WITHIN THE NAC 4
TP ORIGIN.
SUBJECT CONTACT PHONE ISSUE
' OFFICE DATE IN NRR/DRIS INADEOUATE FIRE DAMPER Joe (301) 03/17/89 VIB OPERABILITY TESTS UNDER AIR Petrosino 492-0979 FLOW CONDITIONS j
=IN NRR/DRIS POTENTIAL MANUFACTURER-Joe (301) 05/31/89 VIB DEFECTS IN CUTLER HAMMER E-30 Petrosino 492-0979 SWITCHES MANUFACTURED PRIOR TO A CERTAIN DATE GL NRR/ DEST MINIMUM EDGE DISTANCE'FCR John Ma (301) 05/19/89 ESGB INSTALLATION OF ANCHORS IN 492-1376 CONCRETE IN'AEOD THE REPORTING OF SAFETY VALVE Mary S.
(301) 03/31/89 AND SAFETY-RELIEF VALVE Wegner 492-7818 EVENTS PURSUANT TO 10 CFR 50.73 GL NRR/DREP CHANGE IN THE REGULATORY John (301) 04/17/89 PRPB LIMIT FOR OCCUPATIONAL Buchanan 492-1097 EXPOSURE OF THE SKIN TO BETA RADIATION FROM HOT PARTICLES GL NRR/DOEA VOLUNTARY ENTRY INTO R.
J.
(301) 05/15/89 UTSB TECHNICAL SPECIFICATION 3.0.3 Giardina 492-1188 GL RES/DSIR ASME SECTION 3 REPLACEMENTS Robert (301) 04/10/89 EIB Kirkwood 492-3928 GL RES/IEB-RESOLUTION OF: GI/70, PORV R Kirkwood 492-3928 06/01/89 t< RPSIB AND BLOCK VALVE RELIABILITY, E Throm
-3911 AND GI/94, ADDITIONAL LOW TEMP OVERPRESS PROTECTION FOR LWRS TI NRR/ DEST INSPECTION OF IMPLEMENTATION Ted (301) 04/07/89 EMES OF BULLETIN TO EXTEND IEB Sull i van 492-0901 85-03 "MOV' COMMON MODE FAILURES DURING PLANT TRANSIENTG T1 NRR/ DEST INSPECTION OF COMPL7ANCE WITH Mike McCoy (301) 08/01/89 i
SRXD BULLETIN 90-04:
492-0880 "SRFETY-RELATED PUMP LOSS" TI NRR/DRIS INSPECTION OF IMPLEMENTATION Ed Baker (301) 03/31/89 RVIB OF BULLETIN 87-02: FASTENER 402-0959 TESTING TO DETERMINE CONFORMANCE WITH MATERIAL SPECS
____-_______n
Pagn No.
3 03/15/89 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN'THE NRC TP ORIGIN.
SUBJECT CONTACT PHONE ISSUE OFFICE DATE TI NRR/DRIS'FDLLOW-UP OF RESPONSES TO Ed Baker (301) 03/31/89 RVIB BULLETIN.88-05: NONCONFORMING 492-0959 MATERIALS PROVIDED BY PSI /WJM GL NRR/DLPQ' DEVELOPMENT.AND Ed Baker (301) 04/01/89 LQAB IMPLEMENTATION OF PROGRAM TO 492-0959 IDENTIFY NONCONFORMING MATERIALS & EQUIPMENT BEFORE-INSTALLATION-IN REGION LOW TEMPERATURE OVERPRESSURE M Shymlock (404) 04/01/89 II PROTECTION VALVE SURVEILLANCE 331-5542.
TESTING BL NRR/ DEST INTERGRANULAR STRESS CORR Dave (301) 04/01'/89 EMTB CRACKING OF HIGH-HARDNESS Sellers 492-0930 STUDS IN ANCHOR DARLING G350W SWING CHECK VALVES OR SIMILAR VLVS GL NRR/DOEA REMOVAL OF 3.25 LIMITATION OF Tom Dunning (301) 06/01/89 OSTB' SPEC 4.0.2 FOR REFUELING 492-1189 SURVEILLANCE IN REGION EXTERNALLY INDUCED CHLORIDE J.
F.
(312)
-03/31/89 III STRESS CORROSION CRACKING OF Schapker 790-5562 STAINLESS STEEL PIPE GL NRR/DOEA SERVICE WATER SYSTEM PROBLEMS Vernon (301) 05/01/89 OGCB AFFECTING SAFETY-RELATED Hodge 492-1169 EQUIPMENT IN REGION I POTENTIAL FAILURE CONDITION Roy Mathew (215) 03/31/89 OF GE 4.16KV MAGNE-BLAST TYPE 337-5194 BREAKERS IN NRE/DOEA 01/20/89 AND-1 EVENT, Rick (301) 03/31/89 OEAB INVOLVING CHECK VALVE FAILURE Kendall 492-3140 THAT ALLOWED RCS LEAKAGE TO HPI PIPING OUTSIDE CONTAINMENT IN NRR/DDEA PROBLEMG WITH CIRCUIT PREAKER Rick (302) 04/07/89 OEAD ANTI-PUMP CIRCUITRY Kende11 492-3140 PREVENTING AUTO INITIATION OF SAFETY FUNCTIONS IN NRR/ DEST ANOMALY IN FULL LENGTH S.
L.
Wu (301) 04/07/89 SRXB HAFNIUM CONTROL RODS 492-1065
Peg No.
4 03/15/89 PROPOSED GENERIC COMMUNICATIONS IN PREPARA' ION WITHIN THE NRC 9
TP ORIGIN.
SUBJECT CONTACT PHONE ISSUE OFFICE DATE IN REGION FAILURE OF LIMITOROUE VALVE John (312) 06/01/89 III OPERATOR HOUSINGS Harrison 790-5635 IN REGION SUPPLEMENT 1 TO IN 88-86:
Robert (404) 04/15/89 II OPERATING WITH MULTIPLE Schin 331-6913 GROUNDS IN DIRECT CURRENT DISTRIBUTION SYSTEMS IN NRR/DOEA OPERATING EXPERIENCE FEEDBACK Vernon (301) 05/01/89 OGCB Hodge 492-1169 GL NRR/DLPD OPERATOR LICENSING NATIONAL Ken Perkins (301) 04/3C/89 OLB EXAMINATION SCHEDULE 492-1031 l
IN NRR/ DEST INOPERABILITY OF TURBINE J. Wermiel (301) 03/23/89 SPLB DRIVEN AUXILIARY FEEDWATER 492-0870 PUMP WHEN ONE OF TWO PARALLEL STEAM SUPPLY VALVES IS CLOSE IN NRR/DOEA SECURING OF PLUGGED STEAM Angie (301) 03/17/89 OEAB GENERATOR TUBES Gilbert 492-1171 IN NRR/DOEA EXTERNAL FOULINGrOF THIMBLE Angie (301) 03/17/89 OEAB GUIDE TUBES Gilbert 492-1171 IN NRR/DOEA ENEWJ ADEQUATE TESTING OF Angie (301) 04/14/89 OEAB STEAM GENERATOR TUBE PLUGGING Gilbert 492-1171
____________________________-_______D