Submits Results of SG Tubes Removed from Svc During Plant Cycle 7 Refueling Outage (B2R07) Insps Conducted in Apr & May of 1998.Total of thirty-eight Tubes Were Removed from Svc by Tube Plugging
ML20247D730
Person / Time
Site: Byron Constellation icon.png
Issue date: 05/08/1998
From: Graesser K
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BYRON-98-0148, BYRON-98-148, NUDOCS 9805180062
Download: ML20247D730 (2)


Text

_ _ _ _ - _ _ _ _ _ _ - - - _ _ _ _ - _ -

e Commonwealth IMison Comp.iny e

flyron Generating $tation 4450 Nonh German Church Road

15) nsn, IL 610149794 Tel sis-2ns441 May 8,1998 '

LTR:

BYRON-98-0148 FILE:

3.11.0530 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTN:

Document Control Desk SUB. JECT:

Steam Generator Tube Repairs Resulting from Byron Unit 2 Cycle 7 Refueling Outage Byron Nuclear Power Station Unit 2 Facility Operating License NPF-66 NRC Docket No. 50-455 This letter is to inform the Staff of steam generator (SG) tubes removed from service during the Byron Unit 2 Cycle 7 Refueling Outage (B2R07) inspections conducted in April and May of 1998.

This information if being reported pursuant to Technical Specification 4.4.5.5a.

The following eddy current inspections were performed during this outage:

100% full length Bobbin Coil Inspection in each SG.

100% top of tubesheet (Hot Leg) Plus-Point Inspection in each SG.

100% Row 1 and Row 2 U-Bend Plus-Point Inspection in each SG.

(

25 % Pre-Heater Baffle Plate Expansion Plus-Point Inspection in the 2A SG.

i Based upon the composite results of these inspections, the 2A,2B and 2C steam generators were i

classified as inspection category C-2 pursuant to Technical Specification 4.4.5.2. Steam generator 2D was classified as inspection category C-1.

As a result of the B2R07 eddy current inspections, a total of thirty eight (38) tubes were removed i

from service by tube plugging. The tube plugging distribution between steam generators is summarized in the below table:

Ster.m Tubes Plugged Tubes Plugged in TotalTubes Generate,r This Outage Previous Outages Plugged (B2R07) 2A 7

42 49 2B 26 75 101 2C 5

33 38 2D 0

17 17 k@

Totals 38 167 205 1

\\

0 9005180062 980508I ho PDR -ADOCK 05000455

\\

P PDR1 4 9(

l A Unicom Company

b; 4[e

?.

' LTR:' BYRON-98-0148

May 8,1998.

- P, age 2.

)

'If there are additional questions regarding this matter, please contact Marcia Lesniak, Nuclear

.' Licensing Administrator at (630) 663-6484.

o K. L Graesser Site Vice President Byron Nuclear Power Station'-

KLG/LZ/rp,

cc:

NRC Regional Administrator-RIII Byron Project Manager-NRR Senior Resident Inspector-Byron.-