ML20247D564
| ML20247D564 | |
| Person / Time | |
|---|---|
| Issue date: | 09/08/1989 |
| From: | Jordan E Committee To Review Generic Requirements |
| To: | Arlotto G, Goldberg J, Reyes L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), NRC OFFICE OF THE GENERAL COUNSEL (OGC) |
| References | |
| NUDOCS 8909150008 | |
| Download: ML20247D564 (2) | |
Text
y i heh#""*
1 o,j UNITED STATES Q
p, NUCLEAR REGULATORY COMMISSION j
7 j
WASHINGTON. D. C. 20555
+
k +.... /
September 8, 1989 MEMORANDUM FOR:
Guy A. Arlotto, NMSS Jack R. Goldberg, OGC f
Luis A. Reyes, RII Denwood F. Ross, RES James H. Sniezek, NRP.
\\
FROM:
Edward L. Jordan, Chairman 1
Committee to Review Generic Requirements l
SUBJECT:
CRGR MEETING NO. 169 - REVISED AGENDA The Committee to Review Generic Requirements (CRGR) will meet in the afternoon on Wednesday, September 13, 1989, in Room 2F-17, 0WFN.
The ageMa is as follows:
1:00-2:00 p.m.
B. Morris (RES) will present for CRGR review the proposed final Policy Statement on Maintenance.
(The review package is enclosed.)
2:00-3:00 p.m.
B. Morris (RES) will present for CRGR review a proposed c
final rule on Nuclear Power Plant Access Authorization Programs.
(A revised package will be provided by RES in advance of the meeting.)
3:00-4:00 p.m.
L. Shao (RES) will present for CRGR review proposed Revision'3 to Reg. Guide 1.35, " Inservice Inspection of Ungrouted Tendons in Prestressed Concrete Containments,"
and proposed Reg. Guide 1.35.1, " Determining Prestressir,g Forces for Inspection of Prestressed Concrete Contain-ments." (The review package is Item No. 7 distributed to CRGR members on August 24, 1989.) RES REQUESTED THAT THE CRGR REVIEW OF THIS ITEM BE RESCHEDULED UNTIL OCTOBER 11.
4:00-5:00 p.m.
J. Richardson will present for CRGR review a topical report and a proposed safety evaluation report (SER) that approves application of the results of an industry-initiated research program on conduit fire seals.
(The review package is enclosed.) REVIEW 0F THIS ITEM IS CANCELLED. CRGR REVIEW IS NOT REQUIRED UNDER THE CHARTER.
If a CRGR member cannot attend the meeting, it is his responsibility to assure a.,@8 that an alternate, who is approved by the CRGR Chairman, attends the meeting.
o ma.
!? $8 Persons m'aking presentations to the CRGR are responsible for (1) assuring that K$@
the information required for CRGR review is provided to the Committee (CRGR l
o.,
Charter - IV.B), (2) coordinating and presenting views of other offices, g
e,o (3) as appropriate, assuring that other offices are represented during the
.N presentation, and (4) assuring that agenda modifications are coordinated with
' NZ the CRGR contact (J. Conran X29855) and others involved with the presentation.
i EC Division Directors or higher management should attend meetings addressing
/f
,R$$
agenda items under their purview.
. /fP 1-a j
A tt r :
p3 (s
M C[M ObdN r i cv
f'
- * ' ~ (
In_accordance with the ED0's March 29, 1984 memorandum to the Commission con-cerning " Forwarding of CRGR Documents to the Public Document Room (PDR), the review packages for items scheduled at this meeting, which contain pre-decisional information, will not be released to the PDR until the NRC has considered (in a public forum) or decided the matter addressed by the information.
Orig nalSigned By: f q C. J. Heltemes,Jr.
Edward L. Jordan, Chairman Committee to Review Generic Requirements
Enclosures:
As stated cc w/ enclosures:
SECY J. Taylor cc w/o enclosures:
Commission (5)
'J.
Lieberman J. Partlow Regional Administrators W. Parler J. Richardson B. Morris L. Shao Distribution:
E. Jordan J. Heltemes J. Conran D. Allison D. Kubicki (w/o enc. )
- 5. Frattali (w/o enc.)
R. Frahm (w/o enc.)
H. Graves (w/o enc.)
C. Berlinger (w/o enc.)
R. Fraley P. Kadambi (w/o enc.)
CRGR SF S. Treby (w/o enc.)
M. Taylor, OEDO PDR (NRC/CRGR) (w/o enc.)
" Central" File <(w/o enc.),,
s i
\\
OFC
- AE00:CRGR :
AE0D D
- C
- AE00 :
(
l NAME Id$n:cg
- C t itemes : E rdan l
DATE $ 7/8/89 8/89 $1/h/89 l
l OFFICIAL RECORD COPY lE__