ML20247D389
| ML20247D389 | |
| Person / Time | |
|---|---|
| Issue date: | 05/18/1989 |
| From: | Liza Cunningham Office of Nuclear Reactor Regulation |
| To: | Congel F Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8905250395 | |
| Download: ML20247D389 (3) | |
Text
__
b'3 0'GO UNITED STATES
. j[.-
4 g
NUCLEAR REGULATORY COMMISSION 5
l WASHINGTON, D. C. 20555
,o MAY 181989 PEMORANDUM FOR:
Frank J. Congel, Director Division of Radiation Protection and Emergency Preparedness Office of Nuclear Reactor Regulation FROM:
LeMoine J. Cunningham, Chief Radiation Protection Brcnch Division of Radiation Protection and Emergency Preparedness Office of Nuclear Reactor Regulation
SUBJECT:
SLUMARY OF A MEETING WITH INFO REPRESENTATIVES On May 9,1989, representatives of the radiation protection staff of the Institute of Nuclear Power Operations (INPO) met with NRC headquarters and regional radiation protection tranagement staff members at the NRC Technical Training Center in Chattanooga to discuss topics of mutual interest ccncerning radiation protection at nuclear power reactors.
I was the senior NRC headquar-ters staff representative at the meeting and Robert Masse was the senior INP0 representative. A complete list of attendees is enclosed. This meeting was open to the public.
The topics discussed were as follows:
INP0's primary radiation (1) occupational radiation exposure controls u,d (2) protection concerns:
1.
radiation source reduction.
2.
INF0's reevaluation of the nine power reactor performance areas used as performance indicators.
3.
INP0's finding that contributing causes of occupational radiation expo-sures above regulatory limits in 1988 were the same as the contributing causes to previous overexposure; e.g., f ailures to follow procedures, poor hazards evaluations, etc.
5 4.
The status of the INPO ALARA Center, an information clearinghouse, f
Plans for an INPD-sponsored workshop for industry on the topic of radio g.gf 5.
i logical controls.
8905250395 89051B y
1 l
i PDR ORG EPSINPD 3
f, l
PDR ik
.)_h,,p CONTACT:
g ' f '/) g/'
l James E. Wigginton, NRR t92-1136 j
R DE "O REGUTORY EVTR/t M E-
Frank J. Congel MAY 181989 6.
The status of the ongoing INP0 fuel integrity program.
7.
INP0's notification to industry of potential reductions in occupational radiation dose lb,its and INP0's recommendations' for industry planning to prepare for this eventuality.
Original signed by James E. Wigginton
[LeMoineJ.Cunningham, Chief Radiation Protection Branch Division of Radiation Protection and Emergency Preparedness Office of Nuclear Reactor Regulation
Enclosure:
List of Attendees cc: Robert E. Masse, INP0 Distribution:
i LJCunningham, NPR JEWigginton, NRR THEssig, NRR JDBuchanan, NRR WDTravers, NRR RJBarrett, NRR RLAnderson, TTC PDR _ ~,filesC 4 Central
~
RPB R/F Y
l
.rNDBuchanan:bt RPB:DREP S-
- DREP C PB:
igginton Cun ngham
~// /89 5//f/89 6
05////89
~
k ENCLOSURE List of Attendees NRC Mohamed M. Shanbaky, Region I Wa',ter J. Pasciak, Region I Douglas M. Collins, Region II John.P. Potter, Region II L. Robert Greger, Region III-Martin C. Schumacher, Region 'III Ronald E.-Baer, Region IV Blaine Murray, Region IV Gregory P. Yuhas, Region V Ted Allen, TTC -
John Ricci, TTC Rus3 ell L. Anderson, TTC Thomas H. Essig, NRR James E. Wigginton,-NRR LeMoine J. Cunningham, NRR Robert C..Paulus NRR Jack M. Bell, RES INP0 Jacalyn P. Gawran Robert E. Masse Richard H. Jacobs David J. Moss NUS Corporation S. Savage
'N i