Amend 4 to License R-110,to Include Administrative Changes & Reflect Operational Status of Facility
ML20247C534
Person / Time
Site: Idaho State University
Issue date: 05/17/1989
From: Chris Miller
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20247C540 List:
References
R-110-A-004, R-110-A-4, NUDOCS 8905240495
Download: ML20247C534 (35)


Text

. / b UNITED STATES i

(

j8) k.i NUCLEAR REGULATORY COMMISSION WASHINGTON, D, C. 20555 e is ,

N ,,,,,+

l IDAHO STATE UNIVERSIT_Y DOCKET NO. 50-284 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 4 License No. R-110

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment to facility Operating License No. R-110 filed by the Idaho State University (the licensee),

dated October 28, 1988 and supplemented by letters dated February 15, and April 14, 1989, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations as set forth in 10 CFR Chapter I; D. The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied; and F. Publication of notice of this emendment is not required since it does not involve a significant hazards consideration nor amendment of a license of the type described in 10 CFR Section 2.106(a)(2).

8905240495 89051'7 PDR ADOCK 05000284 P PDC

l '

t, a 5

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the enclosure to this license amendment, and paragraph 2.C.(2) of License No. R-110 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 4, are hereby incorporated in the license.

The licensee shall operate the facility in accoru ace with the Technical Specifications.

l

3. This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

[

CharlesL. Miller,Directo[r Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

Appendix A Technical Specifications Changes Date of Issuance: May 17, 1989 I

j

l r -

o, I

1 l

l ENCLOSURE TO LICENSE AMENDMENT N0 d FACILITY OPERATING LICENSE NO. R-110 DOCKET N0. 50-284 l

The Appendix A Technical Specifications have been replaced in its entirety.

Apart from page number revisions, caused by retyping, the only changes that have been made appear in the following pages, which are identified by Amendment Number and contain a vertical line indicating the area of change.

Revised Pages 6, 10, 12, 19, 20, 21, 25, and 26

I

c. .. ..

s 4

i APPENDIX A TO FACILITY OPERATING LICENSE NO. R-110 TECHNICAL SPECIFICATIONS FOR IDAHO STATE UNIVERSITY AGN-201 M REACTOR (SERIAL #103)

DOCKET NO. 50-284 I

AMENDMENT NO. 4

PAGE 1.0 DEFINITIONS 2 2.0; SAFETY' LIMITS AND LIMITED SAFETY SYSTEM SETTINGS 5 2 .1 - Safety Limits 5 2.2 Limiting Safety System Settings 5

3. 0 - LIMITING CONDITIONS FOR OPERATION 7 3.1 Reactivity Limits 7 3.2 Control and Safety Systems 7 3.3 Limitations on Experiments 11 3.4 Radiation Monitoring, Control and Shielding 11 4.0 SURVEILLANCE REQUIREMENTS 13 4.1 Reactivity Limits 13 4.2 Control and Safety System 13 4.3 Reactor Structure 15 4.4 Radiation Monitoring'and Control 15 5.0 DESIGN FEATURES 17 5.1 Reactor 17 5.2 Fuel Storage 19 5.3 Reactor Room 19 6.0 ADMINISTRATIVE CONTROLS 20 6 .1- Organization 20 6.2 Staff Qualifications 23 6.3 Training ~ 23 6.4 Reactor Safety Committee 23 j 6.5 Approvals 25 )

6.6 Procedures 26 6.7 Experiments 26 6.8 Safety Limit Violation 26 6.9 Reporting Requirements 27 6.10 Record Retention 30

1.0 DEFINITIONS The terms Safety Limit (SL) , Limiting Safety System Setting (LSSS), and Limiting Conditions for Operation (LCO) are as dafined in 50.36 of 10 CFR Part 50.

1.1 Channel Calibration - A channel calibration is an adjustment of the channel such that its output responds, within accept-able range and accuracy, to known values of the parameter which the channel measures. Calibration shall encompass the entire channel, including equipment, actuation, alarm, or trip.

1.2 Channel check - A channel check is a qualitative verifica-tion of acceptable performance by observation of channel behavior. This verification may include comparison of the channel with other independent channels or methods measuring the same variable. '

1.3 Channel Test - A channel ~ test is the introduction of a sig-

. nal into the channel to verify that it is operable.

l'. 4 Experiment -

a. An experiment is any of the following:

(1) Ar. activity utilizing the reactor system or its com-ponents or the neutrons or radiation generated therein; (2) An evaluation or test of a reactor system operation-al, surveillance, or maintenance technique; or (3) The material content of any of the foregoing, in-cluding structural components, encapsulation or con-fining boundaries, and contained fluids or solids.

b. Secured Experiment - Any experiment, or component of an experiment is deemed to be secured, or in a secured position, if it is held in a stationary position rela-tive to the reactor by mechanical means. The restraint shall exert sufficient force on the experiment to over-come the expected effects of hydraulic, pneumatic, buoyant, or other forces which are normal to the operat-ing environment of the experiment or which might arise as a result of credible malfunctions.
c. Unsecured Experiment - Any experiment, or component of an experiment is deemed to be unsecured whenever it is not secured as defined in 1.4.b above. Moving parts of experiments are deemed to be unsecured when they are in motion.

-2 _

l

. j l

d. Movablo Exparimant - A movable experiment is one which '

may be inserted, removed or manipulated while the reac-tor is critical.

e. Removable Exoeriment - A removable experiment is any ex-periment, experimental facility, or component of an ex-periment, other than a permanently attached appurtenance to the reactor system., which can reasonably be antici-pated to be moved one or more times during the life of j the reactor.

1.5 Experimental Facilities - Experimental facilities are those portions of the reactor assembly that are used for the introduction of experiments into or adjacent to the reactor core region or allow beams of radiation to exit from the reactor shielding. Experimental facilities shall include the thermal column, glory hole, and access ports.

1.6 Explosive Material - Explcsive material is any solid or liquid which is categorized as a Severe, Dangerous, or Very Dangerous Explosion Hazard in " Dangerous Properties of In-dustrial Materials" by N. I. Sax, Third Ed., (1968), or is given an Identification of Reactivity (Stability) index of 2, 3, or 4 by the National Fire Protection Association in its publication 704-M, 1966, " Identification System for Fire Hazards of Materials," also enumerated in the " Handbook for Laboratory Safety," 2nd Ed. (1971) published by the Chemical Rubber Company.

1.7 Measuring Channel - A measuring channel is the combination of sensor, lines, amplifiers, and output devices which are connected for the purpose of measuring or responding to the value of a process variable.

1.8 operable - Operable means a component or system is capable of performing its intended function in its normal manner.

1.9 Operating - Operating means a component or system is per-forming its intended function in its normal manner.

1.10 Potential Reactivity Worth - The potential reactivity worth of an experiment is the maximum absolute value of the reac-tivity change that would occur as a result of intended or anticipated changes or credible malfunctions that alter ex-periment position or configuration.

Evaluations of potential reactivity worth of experiments also shall include effects of possible trajectories of the experiment in motion relative to the reactor, its orientation along each trajectory, and circumstances which can cause internal changes such as creating or filling of void spaces or motion of mechanical components. For removable experiments, the potential reactivity worth is equal to or greater than the static reactivity worth.

1.11 Reactor Component - A reactor component is any apparatus,

, device, or material that is a normal part of the reactor assembly.

1.12 Reactor operation - Reactor operation is any condition wherein the reactor is not shutdown.  !

1.13 Reactor Safety System - The reactor safety system is that combination of safety channels and associated circuitry which forms an automatic protective system for the reactor 1 or provides information which requires manual protective action be initiated.

1.14 Reactor Shutdown - The reactor shall be considered shutdown whenever:

a. Either: 1. all safety and control rods are fully withdrawn from the core, or
2. the core fuse melts resulting in separa-tion of the core, and:
b. The reactor console key switch is in the "off" position and the key is removed from the console and under the control of a licensed operator.

1.15 Safety Channel - A safety channel is a measuring channel in the reactor safety system.

1.16 Static Reactivity Worth - The static reactivity worth of an experiment is the value of the reactivity change which is measurable by calibrated centrol or regulating rod compari-son methods between two defined terminal positions or con-figurations of the experiment. For removable experiments, the terminal positions are fully removed from the reactor and fully inserted or installed in the normal functioning or intended position.

2.0 SAFETY LIMITS AND LIMITED SAFETY SYSTEM SETTIhGS 2.1 Safety Limits Applicability This specification applies to the maximum steady state power level and maximum core temperature during steady state or transient operation. 1 I

objective j l

To assure that the integrity of the fuel material is main- j tained and all fission products are retained in the core I matrix.

Specification

a. The reactor power level shall not exceed 100 watts.
b. The maximum core temperature shall not exceed 200 0C during either steady state or transient operation.

Basis The polyethylene core material does not melt below 2000C and is expected to maintain its integrity and retain essentially all of the fission products at temperatures below 200 0C.

The Hazards Summary Report dated February 1962 submitted on Docket F-15 by Aerojet-General Nucleonics (AGN) calculated a steady state core average temperature rise of 0.44C/ watt.

Therefore, a steady state power level of 100 watts would result in an average core temperature rise of 440C. The corresponding maximum core temperature would be below 200 0C thus assuring integrity of the core and retention of fission products. 1 2.2 Limiting Safety System Settings Applicability This specification applies to the parts of the reactor safe-ty system which will limit maximum power and core temperature.

Chiective To assure that automatic protective action is initiated to prevent a safety limit from being exceeded.

Specification

a. The safety channels shall initiate a reactor scram at the following limiting safety system settings:

l

channel condition LSSS Nuclear Safety #2 High Power 5 10 watts Nuclear Safety #3 High Power $ 10 watts

b. The core thermal fuse shall melt when heated to a tem-perature of about 120 0C resulcing in core separation and reactivity loss greater than-54 5% a k/k.

Basis Based on instrumentation response times and scram tests, the AGN Hazards Report concluded that reactor periods in excess of 30-50 milliseconds would be adequately arrested by the scram system. Since the maximum available excess reactivity in the reactor is less than one dollar the reactor cannot become prompt critical and the corresponding shortect pos-sible period is greater than 200 milliseconds. The high power LSSS of 10 watts in conjunction with automatic safety systems and/or manual scram capabilities will assure that the safety limits will not be exceeded during steady state or as a result of the most severe credible transient.

In the event of failure of the reactor to scram, the self-limiting characteristic due to the high negative temperature coefficient, and the melting of the thermal fuse at a tem-perature below 120 0C will assure safe shutdown without ex-ceeding a core temperature of 200 0C.

l l

1

- 6- AMENDMENT NO. 4

3.0 LIMITING CONDITIONS FOR OPERATION j

- l 3.1 Reactivity Limits Applicability This specification applies to the reactivity condition of the reactor and the reactivity worths of control rods and experiments.

Objective To assure that the reactor can be shut down st all times and that the safety limits will not be exceeded.

Specification

a. The available excess reactivity with all control and safety rods fully inserted and including the potential reactivity worth of all experiments shall not exceed 0.65% 6 k/k referenced to 200C.
b. The shutdown margin with the most reactive safety or control rod fully inserted shall be at least 1% ak/k.
c. The reactivity worth of the control and safety rods shall ensure sub-criticality on the withdrawal of the coarse control rod or any one safety rod.

Basis The limitations on total core excess reactivity assure reac-ter periods of sufficient length so that the reactor protec-tion system and/or operator action will be able to shut the reactor down without exceeding any safety limits. The shut-down margin and control and safety rod reactivity limita-tions assure that the reactor can be brought and maintained j subcritical if the highest reactivity rod fails to scram and remains in its most reactive position.

3.2 Control and Safety Systems Applicability These specifications apply to the reactor control and safety l systems.

Objective To specify lowest acceptable level of performance, instru-ment set points, and the minimum number of operable compo- i nents for the reactor control and safety systems.

1 7- 1 l - - - _ - _ _ - - - - - - _ _

, TABLE 3.1 SAFETY CHANNEL SET POINT FUNCTION Nuclear Safety #1 5% Full Scale Scram at source Low Power levels < 5% of full scale Nuclear Safety #2 10 Watt Scram at power High Power > 10 watt Low Power 3.0 X 10-13 -amps Scram at source levels

< 3 X 10-13 amps Reactor Period 5 sec Scram at periods

< 5 sec Nuclear Safety #3 (Linear Power)

High Power 10 Watt Scram at power

> 10 watt Low Power 5% full scale Scram at source levels < 5% of full scale Manual Scram Scram at operator option Radiation Monitor - -----

Alarm at or below level set to meet requirements of 10 CFR Part 20 1

4 8 t

s.

A specification

a. The total scram withdrawal time of the safety rods and coarse control rod shall be less than 200 milliseconds,
b. The average reactivity addition rate for each control or safety rod shall not exceed 0.065% ak/k per second.
c. The safety rods and coarse control rod shall be interlocked such that:
1. Reactor startup cannot commence unless both safety rods and coarse control rod are fully withdrawn from the Core.
2. Only one safety rod can be inserted at a time.
3. The coarse control rod cannot be inserted unless both safety rods are fully inserted,
d. All reactor safety system instrumentation shall be operable in accordance with Table 3.1 with the exception that Safety Channels 1 or 3 may be bypassed whenever the reactor control or safety rods are not in their fully withdrawn position.
e. The shield water level interlock shall be set to prevent startup and scram the reactor if the shield water level falls 10 inches below the highest point on the reactor shield tank manhole opening.
f. The shield water temperature interlock shall be set to pre-vent reactor startup and scram the reactor if the shield water temperature falls below 150c.
g. The seismic displacement interlock sensor shall be installed in such a manner to prevent reactor startup and scram the reactor during a seismic displacement.
h. A less of electric power shall cause the reactor to scram.

Basis The specifications on scram withdrawal time in conjunction with the safety system instrumentation and sat points assure safe reactor shutdown during the most severa foreseeable transients. Interlocks on control and safety rods assure an orderly approach to criticality and an adequate shutdown i

capability. The limitations on reactivity addition rates t

allow only relatively slow increases of reactivity so that L ample time will be available for manual or automatic scram during any operating conditions.

The neutron detector channels (nuclear safety channels 1 through 3) assure that reactor power levels are adequately

. 9-

monitored during reactor startup and operation. Require-ments on minimum neutron levels will prevent reactor startup unless channels are operable and responding, and will cause a scram in the event of instrumentation failure. The power

-levei--scrans- levels initiate redundant automatic protective l action at power Aevel scrams low enough to assure safe shut-down without exceeding any safety limits. The period scram conservatively limits the rate of rise of reactor power to periods which are manually controllable and will automati-cally scram the reactor in the event of unexpected large reactivity additions.

The AGN-201's negative temperature coefficient of reactivity causes a reactivity increase with decrr,asing core tempera-ture. The shield water temperature interlock will prevent reactor operation at temperatures below 15 0C thereby limit-ing potential reactivity additions associated with tempera-ture decreases.

Water in the shield tank is an important component of the reactor shield and operation without the water may produce excessive radiation levels. The shield tank water level interlock will prevent reactor operation without adequate water levels in the shield tank.

The reactor is designed to withstand 0.6g accelerations and 6 cm displacements. A seismic instrument causes a reactor scram whenever the instrument receives a horizontal ac-celeration that causes a horizontal displacement of 1/16 inch or greater. The seismic displacement interlock assures that the reactor will be scrarred and brought to a suberiti-cal configuration during any seismic disturbance that may cause damage to the reactor or its components.

The manual scram allows the operator to manually shut down the reactor if an unsafe or otherwise abnormal condition occurs that does not otherwise scram the reactor. A loss of electrical power de-energizes the safety and coarse control red holding magnets causing a reactor scram and thus assur-ing safe and immediate shutdown in case of a power outage.

A radiation monitor must always be available to operating personnel to provide an indication of any abnormally high radiation levels so that appropriate action can be taken to shut the reactor down and assess the hazards to personnel.

l AMENDMENT NO. 4

. a 3.3 Limitations on Experiments Applicability This specification applies to experiments installed in the reactor and its experimental facilities.

Obiective To prevent damage to the reactor or excessive release of radioactive materials in the event of an experiment failure.

Specification

a. Experiments containing materials corrosive to reactor components or which contain liquid or gaseous, fis-sionable materials shall be doubly encapsulated.
b. Explosive materials shall not be inserted into ex-perimental facilities of the reactor or stored within the confines of the reactor facility.
c. The radioactive material content, including fission products of any experiment shall be limited so that the complete release of all gaseous, particulate, or vola-tile components from the experiment will not result in doses in excess of 10% of the equivalent annual doses stated in 10 CFR Part 20 for persons occupying (1) un-restricted areas continuously for two hours starting at time of release of (2) restricted areas during the length of time required to evacuate the restricted area.
d. The radioactive material content, including fission products of any doubly encapsulated experiment shall be limited so that the complete release of all gaseous, particulate, or volatile components of the experiment shall not result in exposures in excess of 0.5 Rem whole body or 1.5 Rem thyroid to persons occupying an un-restricted area continuously for a period of two hours starting at the time of release, or exposure in excess of 5 Rem whole body or 30 Rem thyroid to persons occupy-ing a restricted area during the length of time required to evacuate the restricted area.

Basis These specifications are intended to reduce the likelihood of damage to reactor components and/or radioactivity releases resulting from an experiment failure and to protect operating personnel and the public from excessive radiation doses in the event of an experiment failure.

l 3.4 Radiation Monitoring, Control, and Shielding l

Applicability

i I

b I

This specification applies to radiation monitoring, control, and reactor shielding required during reactor operation.

obiective To protect facility personnel and the public from radiation exposure.

Specification

a. An operable portable and installed radiation survey in-strument capable of detecting gamma radiation shall be immediately available to reactor operating personnel whenever the reactor is not shutdown.
b. The reactor room shall be considered a restricted area whenever the reactor is not shutdown.
c. The following shielding requirements shall be fulfilled during reactor operation:
1. The reactor shield tank shall be filled with water to a height within 10 inches of the highest point on the manhole opening.
2. The thermal column shall be filled with water or graphite except during a critical experiment (core leading) or during measurement of reactivity worth of thermal column water or graphite, or when the neutron radiography collimator is beina usea.
3. The movable shield doors above the thermal column snali ce n.alnnalnea In a closea posit 1on wnenever tne reactor as operates an a power creater unan u.5 vants.

Basis Radiation surveys performed under the supervision of a qualified health physicist have shown that the total gamma, thermal neutron, and fast neutron r&fiation dose rate in the reactor room, at the closest approach to the reactor outside the designated high radiation areas is less than 25 rnrem/hr at reactor power levels less than 5.0 watts. and-that-the-tetal-gam e;-thermei-nectren;-end-fast-neetFen, and-fast-sewtreA-dese-Fate-4R-the-aseelerateF-Feem-45-leSS-thaR-15-5 Fem /kF--

at-FeBeteF-peweF-4 eve 45-40SS-thaR-eF-eqWal-te-5,9-watts-and-the-theFaa4-----

eelums-f444ed-with-water, The facility Shielding in conjunction with designated re-stricted radiation areas is designed to limit radiation doses to facility personnel and to the public to a level below 10 CFR 20 limits under operating conditions, and to a level below Criterion 19, Appendix A, 10 CTR 50 recommenda-tions under accident conditions.

AMENDMENT NO. 4

)

- i

'. j l

4.0 SURVEILLANCE REQUIREMENTS j Actions specified in this section are not required to be performed if during the specified surveillance period the j reactor has not been brought critical or is maintained in a i shutdown condition extending beyond the specified surveil- l lance period. However, the surveillance requirements must j be fulfilled prior to subsequent startup of the reactor.

4.1 Reactivity Limits Applicability The specification applies to the surveillance requirements for reactivity limits.

Objective To assure that reactivity limits for Specification 3.1 are not exceeded.

Specification

a. Safety and control rod reactivity worths shall be mea-sured annually, but at intervals not to exceed 16 months.
b. Total excess reactivity and shutdown margin shall be determined annually, but at intervals not to exceed 16 months.
c. The reactivity worthy of an experiment shall be esti-mated or measured, as appropriate, before or during the first startup subsequent to the experiment's insertion.

Basis .

The control and safety rods are inspected and their reac-tivity worths measured annually to assure that no degrada-tion or unexpected changes have occurred which could ad-versely affect reactor shutdown margin or total excess reac-tivity. The shutdown margin and total excess reactivity are determined to assure that the reactor can always be safely shutdown with one rod not functioning and that the maximum possible reactivity insertion will not result in reactor periods shorter than those than can be adequately terminated by either operator or automatic action. Based on experience with AGN reactors, significant changes in reactivity or rod worth are not expected within a 16-month period.

4.2 Control and Safety System Applicability L___________..___.

)

Thio pacification applica to tha curvoillanca requirements i of the reactor control and safety system.

Objective To assure that the reactor control and safety systems are operable as required by Specification 3.2.

Specification

a. Safety and control rod scram times and average reactivi-ty insertion rates shall be measured annually, but at intervals not to exceed 16 months.
b. Safety and control rods and drive shall be inspected for deterioration at intervals not to exceed 2 years.
c. A channel test of the following safety channels shall be performed prior to the first reactor startup of the day or prior to each operation extending more than one day.

Nuclear Safety #1, #2, and #3 Manual scram

d. A channel test of the seismic displacement interlock shall be performed semiannually.
e. A channel check of the following safety channels shall be performed daily whenever the reactor is in operation:

Nuclear Safety #1, #2, and #3

f. Prior to each day's operation or prior to each operation extending more than one day, safety rods #1 and #2 shall be inserted and scrammed to verify operability.
g. The period, count rate, and power level measuring chan-nels shall be calibrated and set points verified annual-ly, but at intervals not to exceed 16 months.
h. The shield tank water level interlock, shield water tem-perature interlock, and seismic displacement safety channel shall be calibrated by perturbing the sensing element to the appropriate set point. These calibra-tions shall be performed annually, but at intervals not to exceed 16 months.
i. The radiation monitoring instrumentation shall be cali-brated annually, but at intervals not to exceed 16 months. ,

Basis The channel tests and checks required daily or before each startup will assure that the safety channels and scram func-tions are operable. Based on operating experience with l

reactors of thin typs, ths annual scram measurements, chan-  ?

nel calibrations, set point verifications, and inspections are of sufficient frequency to assure, with a high degree of confidence, that the safety system settings will be within acceptable drift tolerance for operation.

4.3 Reactor Structure Applicability This specification applies to surveillance requirements for reactor components other than control and safety rods.

objective To assure integrity of the reactor structures.

Specification

a. The shield tank shall be visually inspected every two years. If apparent excessiva corrosion or other damage is observed, corrective measures shall be taken prior to subsequent reactor operation.
b. Visual inspection for water leakage from the shield tank shall be performed annually. Leakage shall be corrected prior to subsequent reactor operation.

Basis Based on experience with reactors of this type, the frequen-cy of inspection and leak test requirements of the shield tank will assure capability for radiation protection during reactor operation.

4.4 Radiation Monitoring and Control Applicability -

This specification applies to the surveillance requirements of the radiation monitoring and control systems.

objective To assure that the radiation monitoring and control systems are operable and that all radiation areas within the reactor facility are identified and control: 1 as required by Specification 3.4.

Specification

a. All portable and installed radiation survey instruments assigned to the reactor facility shall be calibrated under the supervision of the Radiation Safety officer annually, but at intervals not to exceed 16 months.

^

. 'b . Prior to sach day'o rsactor oparation or prior to each reactor operation extending more than one day, the reac-

' ' tor room high radiation alarm shall be verified to be operable.

c. A radiation survey of the reactor room and reactor con-trol room shall be performed under the supervision of the Radiation Safety Officer annually, but at intervals not to exceed 16 months, to determine the location of radiation and high radiation areas corresponding to reactor operating power levels.

Basis The periodic calibration of radiation monitoring equipment and the surveillance of the reactor room high radiation area alarm will assure that the radiation monitoring and control systems are operable during reactor operation.

The periodic radiation surveys will verify the location of radiation and high radiation areas and will assist reactor facility personnel in properly labeling and controlling each location in accordance with 10 CFR 20.

l .

'5.0 DESIGN FEATURES 5.1 Reactor

a. The reactor core, including control and safety rods, contains approximately 670 grams of U235 in the form of 20% enriched UO2 dispersed in approximately 11 kilograms of polyethylene. The lower section of the core is sup-ported by an aluminum rod hanging from a fuse link. The fuse melts at temperatures below 120 0C causing the lower core section to fall away from the super section reduc-ing reactivity by at least 5%ak/k. Sufficient clearance between core and reflector is provided to in-sure free fall of the bottom half of the core during the most severe transient.
b. The core is surrounded by a 20 cm thick high density (1.75 gm/cm3) graphite reflector followed by a 10 cm thick lead gamma shield. The core and part of the graphite reflector are sealed in a fluid-tight aluminum core tank designed to contain any fission gases that might leak from the core.
c. The core, reflector, and lead shielding are enclosed in and supported by a fluid-tight steel reactor tank. An upper of " thermal column tank" may serve as a shield tank when filled with water or a thermal column when filled with graphite.
d. The 6-1/2 foot diameter, fluid-tight shield tank is fil-led with water constituting a 55 cm thick fast neutron shield. The fast neutron shield is formed by filling the tank with approximately 1000 gallons of water. The complete reactor shield shall limit doses to operating ,

personnel in restricted and unrestricted areas to levels less than permitted by 10 CFR 20 under operating conditions.-

I

e. Shielding is provided by a concrete wall constructed of 4" X 8" X 16" concrete blocks and 4" X 8" X 12" barytes concrete blocks for 5 watt operation. The blocks are held to close dimensional tolerance in manufacture and stacked in such a manner that voids in the completed wall are at a minimum. Near the beam ports and glory hole, high density blocks are used between 40 inches and ,

112 inches above the base. The use of these blocks fur- l ther reduces radiation level in these areas. Overhead 1 shielding is provided by 8 inch thick barytes blocks (minimum density 3.7 gcc). j l

As detailed in the amendment for 5 watt operation for Aerojet-General Nucleonics, dated 11 February 1957, and l on file with the Commission in Docket 50-32, an 18 inch )

additional concrete shield wall was sufficient to main- 1 tain sub-tolerance radiation levels external to the shield when operating at 5 watts. Subsequent analysis by Aerojet-General Nucleonics indicated that 16 inches of ordinary concrete shielding was sufficient. Twelve inches of barytes concrete is more effective than 18 l inches of ordinary concrete. )

I The radiation levels associated with 5 watt operation 1 (peak thermal flux of 2.5 x 108 n/cm2 -sec) have been  !

calculated by Aerojet-General Nucleonics. The table below gives Aerojet-General results for gamma dose for an 18" concrete shield:

Energy (MeV) u ux B e-ux Done (mrem /hr)  !

3.0 0.081 3.64 1.9 0.027 1.5 2.2 0.105 4.73 2.2 0.0088 1.0 Total = 2.5 mrem /hr (18" concrete)

Changing the e-ux for a 16" concrete wall and using the same buildup factors yields the following table:

Energy (MeV) u ux B e-ux Dose (mrem /hr) 3.0 0.081 3.30 1.9 0.037 2.1 2.2 0.105 4.28 2.2 0.014 1.2 Total = 3.3 mrem /hr (16" concrete)

The National Naval Medical Center reported neutron dose rates were less than 0.2 mrem /hr for 18" shield.

Although calculations and operating surveys of similar facilities show that at 5 watts power there will be no area on the reactor f,oor l outside the concrete shield where the total radiation exceeds tolerance levolc; nevertheless, the reactor f1:or is a control area with  !

restricted access-

f. Two safety rods and one control rod (identical in size) contain up to 20 grams of U235 each in the same form as the core material. These rods are lifted into the core by electromagnets, driven by reversible DC motors through lead screw assemblies. De-energizing the mag-nets causes a spring-driven, gravity-assisted scram.

The fourth rod or fine control rod (approximately one- '

half the diameter of the other rods) is driven directly

by a lead screw. This rod may contain fueled or un-fueled polyethylene.

5.2 Fuel Storage Fuel, including fueled experiments and fuel devices not in

.the reactor, shall be stored in locked rooms in the nuel-ear engineeelnef--depechmed College of Engineering laboratories.

The storage array shall me sucn unan xe ff 1s no greater than 0.8 for all conditions of moderation and reflection.

5.3 Reactor Room

a. The reactor room houses the reactor assembly and -:ces-series required for its operation and maintenance.
b. The reactor room.is a separate room in the Lillibridge Engineering Laboratory, constructed with adequate shielding and other radiation protective features to limit doses in restricted and unrestricted areas to levels no greater than permitted by 10 CFR 20, under normal operating conditions, and to a level below Criterion 19, Appendix A, 10 CFR 50 recommendations under accident conditions.
c. Access doors to the reactor room are self-locking, i

l 1

AMENDMENT NO. 4

. 6.0 ADMINISTRATIVE CONTROLS 6.1 Organization The administrative organization for control of the reactor facility and its operation shall be as set forth in Figure 1 of these specifications. The authorities and responsibili-ties set forth below are designed to comply with the intent and requirements for administrative controls of the reactor facility as set forth by the Nuclear Regulatory Commission.

6.1.1 Univ,ersity Officer The University Officer is an administrative officer responsible for the University and in whose name the application for licensing is made.

6.1.2 Dean, School College of Engineering The Dean of the School College of Engineering is the l administrative officer responsible for the operation of the school- College of Engineering. -(else-Reeot-er Administrator.)

6.1.3 Reactor Administrator The Reactor Administrator is the administrative of-ficer responsible for the operation of the AGN-201M Reactor Facility. In this capacity he shall have final authority and ultimate responsibility for the operation, maintenance, and safety of the reactor facility within the limitations set forth in the facility license. He shall be responsible for ap-pointing personnel to all positions reporting to him as described in Section 6.1 of the Technical Specifications. He shall seek the advice and ap-proval of the Radiation Safety Committee and/or the Reactor Safety Committee in all matters concerning unresolved safety questions, new experiments and new i procedures, and facility modifications which might affect safety. He shall be an ex officio member of the Reactor Safety Committee.

6.1.4 Reactor Supervisor The Reactor Supervisor shall be responsible for the preparation, promulgation, and enforcement of ad-ministrative controls including all rules, regula-tions, instructions, and operating procedures to ensure that the reactor facility is operated in a safe, competent, and authorized manner at all times.

He shall direct the activities of operators and technicians in the daily operation and maintenance of the reactor; schedule reactor operations and maintenance; be responsible for the preparation, AMENDMENT NO. 4

E L. .

~

l authentication, and storags of all prescribad logs and operating records; authorize all experiments, procedures, and changes thereto which have received the approval of the Reactor Safety Committee and/or the Radiation Safety Committee and the Reactor Ad-ministrator; and be responsible for the preparation of experimental procedures involving use of the

, reactor.

Figure 1 Administrative organization of the Idaho State University AGN-20lM Reactor Facility NRC License R-110 Idaho State University Officer Dean College oY Engineering Radiation Safety .

Reactor SafeJy Committee Committee Reactor Administrator *~

Reactor Supervisor

  • Reactor Operators **
  • Requires NRC Senior Operators License
    • Requires NRC Operators License except where exempt per 10 CFR 55 paragraph 55.9 Persons-holding positions on the Administrative Organization snail meen or exceea une qualiricanlon recuirEffeTITs or Aus1/ANS

-lo.4-1w// (n a e v ) ,_ " select 1on and Training or versonnel Ior xesearcn xeactors."

AMENDMEf4T I40. 4

l p- "

I .'

6.1.5 Reactor Operators Reactor Operators shall be responsible for the ma-nipulation of the reactor controls, monitoring of instrumentation, operation of reactor related equip-ment, and maintenance of complete and current i

records during operation of the facility. Reactor l Operators who are exempt from holding an NRC license per 10 CFR 55 paragraph 55.9 shall only operate the reactor under the direct and immediate supervision of a licensed Reactor Operator.

6.1.6 Reactor Safety Committee The Reactor Safety Committee shall be responsible for, but not limited to, reviewing and approving safety standards associated with the use of the reactor facility; reviewing and approving all pro-posed experiments and procedures and changes there-to; reviewing and approving all modifications to the reactor facility which might affect its safe opera-tion; determining whether proposed experiments, pro-cedures, or modifications involve unreviewed safety questions, as defined in 10 CFR 50 paragraph 50.59(c), and are in accordance with these Technical Specifications; cenducting periodic audits of pro-cedures, reactor operstions and maintenance, equip-ment performance, and records; review all reportable occurrences and violations of these Technical Specifications, e"aluating the causes of such events and the corrective action taken and recommending measurer to prevent reoccurrence; reporting all their findings and recommendations concerning the reactor facility to the Reactor Administrator.

6.1.7 Radiation Safety Committee The Radiation Safety Committee shall advise the University administration and the Radiation Safety Officer on all matters concerning radiological safe-ty at University facilities.

6.1.8 Radiation Safety Officer The Radiation Safety Officer shall review and ap-prove all procedures and experiments involving radiological safety. He shall enforce all federal, state, and university rules, regulations, and pro-cedures relating to radiological safety. He shall perform routine radiation surveys of the reactor facility and report his findings to the Reactor Ad-ministrator. He shall provide personnel dosimetry and keep records of personnel radiation exposure.

He shall advise the Reactor Administrator on all matters concerning radiological safety at the reac-tor facility. The Radiation Safety Officer shall be

- &n cx officio membsr of the Rsactor. Safety

' Committee.

6.1.9 Operating Staff

a. The minimum operating staff during any time in which the reactor is not shutdown consist of: 1
l. One licensed Reactor Operator in the reactor control room.

2.-One other person in the reactor room or reac-tor control room certified by.the Reactor Supervisor as qualified to activate manual scram and initiate emergency procedures.

3. One licensed Senior Reactor Operator readily available on call.. This requirement can be satisfied by having a licensed Senior Reactor Operator perform the duties stated in para-graph 1 or 2 above or by designating a li-censed Senior Reactor Operator who can be readily contacted by telephone and who can arrive at the reactor facility within 30 minutes. *
b. A licensed Senior Reactor Operator shall super-vise all reactor maintenance or modification which could affect the activity of the reactor.

6.2 Staff Qualifications The Reactor Administrator, the Reactor Supervisor, licensed Reactor Operators, and technicians performing reactor main-tenance shall meet the mininum qualifications set forth in ANS 15.4, " Standards for Selection and Training of Personnel for Research Reactors." Reactor Safety Committee members shall have a minimum of five (5) years experience in their profession or a baccalaureate degree and two (2) years of professional experience. Generally, these committee members will be made up of University faculty, but outside ex-perience may be sought in areas where additional experience is considered necessary by the Reactor Administrator.

6.3 Training The Reactor Administrator shall be responsible for directing training as set forth ANS 15.4, " Standards for Selection and Training of Personnel for Research Reactors." All licensed reactor operators shall participate in requalification training as set forth in 10 CFR 55.

6.4 Reactor Safety Committee 6.4.1 Meetings and Quorum

I j

. i -

I Tha Racctor Sofsty Committaa chall m2:t as often as j deemed necessary by the Reactor Safety Committee Chariman but shall meet at least once each calendar year. A quorum for the conduct of official business j shall be the chairman, or his designated alternate, l and two (2) other regular members. At no time shall I l

the operating organization comprise a voting majori- i ty of the members at any Reactor Safety Committee meeting.

l 6.4.2 Reviews The Reactor Safety Committee shall review:

a. Safety evaluations for changes to procedures, equipment or systems, and tests or experiments,  !

conducted without Nuclear Regulatory Commission approval under the provision of 10 CFR 50 para-graph 50.59, to verify that such actions do not constitute an unreviewed safety question.

b. Proposed changes to procedures, equipment or systems that change the original intent or use, and are non-conservative, or those that involve an unreviewed safety question as defined in 10 CFR 50 paragraph 50.59.
c. Proposed tests or experiments which are signifi-cantly different from previously approved tests or experiments, or those that involve an unre-viewed safety question as defined in Section 50.59, 10 CFR 50 paragraph 50.59.
d. Proposed changes in Technical Specifications or licenses.
e. Violations of applicable statutes, codes, reg-ulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
f. Significant operating abnormalities or devia-tions from normal and expected performance of facility equipment that affect nuclear safety.
g. Reportable occurrences.
h. Audit reports.

6,4.3 Audits Audits of facility activities shall be performed under the cognizance of the Reactor Safety Committec but in no case by the personnel responsible for the item audited. These audits shall examine the

, ~

~

operating records and encompass but shall not be limited to the following:

a. The conformance of facility operation to the Technical Specifications and applicable license conditions, at least once per 12 months.
b. The performance, training, and qualifications of the entire facility staff, at least once per 24 months.
c. The results of all actions taken to correct de-ficiencies occurring in facility equipment, structures, systems or method of operation that affect nuclear safety, at least once per calen-dar year.
d. The Facility Emergency Plan and implementing procedures at least once per 24 months.
e. The Facility Security Plan and implementing pro-cedures, at least once per 24 months.

6.4.4 Authority The Reactor Safety Committee shall report to the University officer and shall advise the Reactor Ad-ministrator on those areas of responsibility out-lined in Section 6.1.6 of these Technical Specifications.

6.4.5 Minutes of the Reactor Safety Committee The Chairman of the Reactor Safety Committee shall direct the preparation, maintenance, and distribu-tion of minutes of its activities. These minutes shall include a summary of all meetings, actions taken7 audits, and reviews.

6.5 Approvals The procedure for obtaining approval for any change, modification or procedure which requires approval of the Reactor Safety Committee shall be as follows:

a. The Reactor Supervisor shall prepare the proposal for review and approval- by the Dean-e-f--the--schoo+-ef--En-gineering- Reactor Administrator.

I

b. The -Dean--ef-the = School vf-Engineering Reactor Ad- I ministrator shall submit the proposal to nne unalrman of tne xeactor Safety Committee.
c. The Chairman of the Reactor Safety Committee shall sub-mit the proposal to the Reactor Safety Committee members for review and comment.

l AMENDMENT NO. 4

'. d. Tho Ranctor Sofsty Committso can approva the proposal by majority vote.

6.6 Procedures There shall be written procedures that cover the following activities:

a. 'Startup, operation, and shutdown of the reactor.
b. Fuel movement and changes to the core and experiments that could affect reactivity.
c. Conduct of irradiations and experiments that could af-fect the safety of the reactor.
d. Preventive or corrective maintenance which could affect the safety of the reactor.
e. Surveillance, testing, and calibration of instruments, components and systems as specified in Section 4.0 of these Technical Specifications.

, f. Implementation of the Security Plan and Emergency Plan.

The above listed procedures shall be approved by the Deen-et the--Sehool-of--Engstreedng Reactor Administrator and the Reactor Safety Committee. Temporary proceaures which do not change the intent of previously approved procedures and which do not involve any unreviewed safety question may be employed on approval by the Reactor Supervisor.-er-Geen-ef l the--Sehool-ef--Enefi tteedng-6.7 Experiments

a. Prior to initiating any new reactor experiment an ex-perimental procedure shall be prepared by the Reactor Supervisor and reviewed and approved by the Been-e6-the-

-Gehool-et~Entritteering Reactor Administrator and the Reactor Safety Committee.

b. Approved experiments shall only be performed under the cognizance of the -Dean--of-the-Scheel-of-Etxf i neeriny ant l the Reactor Supervisor.

6.8 Safety Limit Violation The following actions shall be taken in the event a Safety Limit is violated:

a. The reactor will be shutdown immediately and reactor operation will not be resumed without authorization by the Nuclear Regulatory Commission (NRC).

AMENDMENT NO. 4

b. Ths safety Limit viointion chall bs raported to tha ap-propriate NRC Regional Office of~ Inspection and Enforce-ment, the Director of the NRC, and the Reactor Safety Committee not later than the next working day,
c. A Safety Limit Violation Report shall be prepared for review by the Reactor Safety. committee. This report shall' describe the applicable circumstances preceding the violation, the effects of the violation upon facili-ty components, systems or structures, and corrective action to prevent recurrence.
d. The Safety. Limit Violation Report shall be submitted to the NRC, and Reactor Safety' Committee within 14 days of the violation.

6.9 Reporting Requirements In addition to the applicable reporting requirements of Ti-tle 10, Code of Federal Regulations, the following reports shall be submitted to the Director of the appropriate NEC' Regional Office.

6.9.1 Annual Operating Report Routine operating reports covering the operation of the unit during the previous calendar year should be submitted prior to' June 30 of each year.

The annual operating reports made by licensees shall provide a comprehensive summary of the operating experience having safety significance that was gained during the year, even though some repetition of previously reported information may be involved.

References in the annual operating report to pre-viously submitted reports shall be clear.

Each annual operating report shall include:

(1) A brief narrative summary of:

a. Changes in facility design, performance characteristics,,and operating procedures relat-ing to reactor safety that occurred during the reporting period.
b. Results of major surveillance tests and inspections.

(2) A monthly tabulations showing the hours the reactor is operating.

(3) List of the unscheduled shutdowns, including the reasons therefore and corrective action taken, j if any.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ )

(4) Discussion of tha major safety related correc-tive maintenance performed during the period,

- including the effects, if any, on the safe operation of the reactor and the reasons for the corrective maintenance required.

(5) A brief description of :

a. Each change to the facility to the extent that it changes a description of the facility in the application for license and amendments thereto.
b. Changes to the procedures as described in Facility Technical Specifications.
c. Any new or untried experiments or tests per-formed during the reporting period.

(6) A summary of the safety evaluation made for each change, test, or experiment not submitted for NRC approval pursuant to 10 CFR 50.59 which clearly shows the reason leading to the conclu-sion that no unreviewed safety question existed and that no change to the Technical Specifica-tions was required.

(7) A summary of the nature and amount of radioac-tive effluents released or discharged to the environs beyond the effective control of the t

licensee as determined at or prior to the point of such release or discharge.

a. Liquid waste-Total estimated quantity of radioactivity released (in curies) and total volume (in

~ liters) of effluent water (including diluent) released.

b. Airborne waste-Total estimated quantity of radioactivity released (in curies) determined by an ap-proved sampling and counting method.
c. Solid waste-(i) Total amount of solid waste packaged (in cubic meters)

(ii) Total activity in solid waste (in curies)

. ib .* ..

L The. dates of shipments and disposition-

-(iii)

, if shipped off. site)

(8) A description of the results of any environmen-tal radiological surveys performed outside the facility.

o (9) Radiation Exposure - A summary of radiation ex-posures greater than 100 arem (50 mram for per--

sons under 18 years of age) received during the reporting period by facility personnel or visitors.

6.9.2 Reportable Occurrences Reportable. occurrences, including causes, probable consequences, corrective actions and measures to prevent recurrence, shall be reported to the NRC.

a. Prompt Notification with Written' Followup-The types of events listed shall be reported as expeditiously.as possible by telephone and tele-graph to.the Director of the appropriate NRC .

Regional Office, or his designated representa-tive no later than the first' working day follow-ing the event, with a written followup report within two weeks. Information provided shall contain narrative material to provide complete explanation of the circumstances surrounding the event.

(1) Failure of the reactor protection system subject to limiting safety system settings to initiate the re-quired protective function by the time a monitored parameter reached the setpoint specified as the limiting safety system setting in the technical specifications.

(2) Operation of the reactor when any parameter or operation subject to a limiting condition is less conservative than the limiting condition for opera-tion established in the technical specifications.

(3) Abnormal degradation discovered in a. fission product barrier.

(4) Reactivity balance anomalies involving:

a. disagreement between expected and actual criti-cal positions of approximately 0.3% A k/k;
b. exceeding excess reactivity limits; ,
c. shutdown margin less conservative than specified in technical specifications.

1

1

  • '3 '. -

(5) Failuro or malfunction of ona (or moro) component (c) which prevents, or could prevent, by itself, the

. fulfillment of the functional requirements of sys-tems used to cope with accidents analyzed in Safety Analysis Report.

(6) Personnel error or procedural inadequacy which pre-vents, or could prevent, by itself, the fulfillment of the functional requirements of systems required to cope with accidents analyzed in Safety Analysis Report.

(7) Errors discovered in the transient or accident anal-yses or in the methods used for such analyses as described in the Safety Analysis Report or in the basis for the Technical Specification'is that have permitted reactor operation in a martner less conser-vative than assumed in the analyses.

(8) Performance of structures, systems, or components that requires remedial action or corrective measures to prevent operation in a manner less conservative than assumed in the accident analyses in the Safety Analyses Report or Technical Specification basis, or discovery during plant life of conditions not specifically considered in the Safety Analysis Re-port or Technical Specifications that require remedial action or corrective measures to prevent the existence or development of an unsafe condition.

6.10 Record Retention 6.10.1 Records to be retained for a period of at least five years:

a. Operating logs or data which shall identify:

(1) Completion of pre-startup checkout,

~

startup, power changes, and shutdown of the reactor.

(2) Installation or removal of fuel elements, control rods or experiments that could affect core reactivity.

(3) Installation or removal of jumpers, spe-cial tags or notices, or other temporary changes to reactor safety circuitry.

(4) Rod worth measurements and other reac-tivity measurements,

b. Principal maintenance operations.
c. Reportable occurrences.

i

d. Surveillcnca cctivitico requirsd by technical specifications.
e. Facility radiation and contamination surveys.
f. Experiments performed with the reactor.  !

1 This requirements may be satisfied by the normal operations log book plus: (

f

1. Records of radioactive material transferred j from the facility as required by license.

]

2. Records required by tha Reactor Safety Com-mittee for the performance of new or special experiments. ]
g. Changes to operating procedures. .

6.10.2 Records to be retained for the life of the facility: l

{

a. Gaseous and liquid radioactive effluents I released to the environs. f I
b. Appropriate offsite environmental monitoring  !

P'iT;9ys .

c. Fuel inventories and fuel transfers.
d. Radiation exposures for all personnel.
e. Updated as-built drawings of the facility.
f. Records of transient or operational cycles for those components designed for a limited number of transients or cycles.
g. Records of training and qualification for mem-bers of the facility staff.
h. Records of reviews performed for changes made to procedures or equipment or reviews of tests and experiments pursuant to 10 CFR 50.59.
i. Records of meetings of the Reactor Safety Committee.

j i

l 1

_ _ - - - - - - - . I