10 CFR 50.71
.. s PHILADELPHIA ELECTRIC COMPANY NUCLEAR GROUP HEADQUARTERS 955-65 CHESTERBROOK BLVD.
WAYNE, PA 19087 5691
( si e40-sooo I
July 20, 1989 Docket Nos. 50-277 p
50-278 V
('
License Nos. DPR-44 DPR-56 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555
REFERENCE:
Peach Bottom Atomic Power Station, Units 2 and 3 Updated Final Safety Analysis Report o
Dear Sir
- Enclosed for filing with the Commission, in accordance with Section 50.71(e) of the Commission's Regulations, is the seventh annual revision of the Updated Final Safety Analysis Report (UFSAR) for Peach Bottom Atomic Power Station Units 2 and 3. 'Also included in this submittal is revision two of,the Peach Bottom Fire Protection Program (FPP).
This filing consists of an original and ten copies of'the certification required by Section 50.71(e)(2) and eleven copies of the replacement pages to be inserted in the UFSAR and in the Fire Protection Program, including instructions for making the revision and a listing of the replacement pages. The attachment to this letter identifies changes made under the provisions of 10 CFR 50.59 but not previously submitted to the Commission.
Very truly yours, 6)
D. R. Helwig Vice President 3
Nuclear Services Department JAB:1c L
f tl Attachments 8907240272 890720 PDR ADOCK 05000277 K
W pJ:dit.w,
_ s tF ~~ ~~
~ ~ = ^
~
~
~
w yE u y;--;
s-s./:;.b i
'[
- p,>
7.? 1 LDocument Control: Desk 1 Page,2 m, g...
.y
~.
g 0
!.: i..,,
a G7
.cc:.
..W.-T. Russell, Region'I. Administrator..USNRC T. P. Johnson, PBAPS Senior Resident' Inspector. OSNRC T. E. Magette, State'of Maryland g
J. Urban, Delmarva Power.
R.LA..Burricelli, Public Service Electric & Gas C-H.~ C.'Schwemm. Atlantic Electric W
i T. M. Gerusky, commonwealth of Pennsylvania Qj.
.f p
hl t
'4.
l.
- e4 e
I*
.l
'1' c
.i
. s
+
...wa..t~_ _ _ _. - - - - - - - _ -
f l
. July 20, 1989 ATTACHMENT Changes made under 10 CFR 50.59 covered I
by Revision 7.of the Peach Bottom DFSAR, but not previously submitted.to NRC.
Modification Descriptiort 809 Unit 2 - High Pressur Air Surge Condensat Backwash System Both units - Renovation (s.
1500 to'Radwaste Trash Sorting Area 2081 Unit 3 - Emergency Lighting for Fire Protection 1404 Unit 3 - Removal ~of 600 psig Scram Signal 2371
. Unit 3 - Emergency Service Water Pipe Replatcment 2580 Unit 3 - Shedding Cooling Tower Electrical Loads
BEFORE THE U.'S. NUCLEAR REGULATORY COMMISSION In the matter of Docket No. 50-277 L
PHILADELPHIA ELECTRIC COMPANY 50-278 (Peach Bottom Atomic Power Station Units 2 and 3)
CERTIFICATION
- n. R. Helwig, being first duly sworn, deposes and states as follows:
- 1. He is Vice President of Philadelphia Electric Company, Licensee under Facility Operating Licenses DPR-4i and DPR-56 for Peach Bottom Atomic Power Station, Units 2 and 3, and is authorized to make this Certification on behalf of the Licensee.
2.
The seventh revision to the Updated Final Safety Analysis Report, which is filed herewith,.further updates the original Updated Final Safety Analysis Report submitted for Peach Bottom Units ? and 3 on July 20, 1982, as necessary to reflect information and analyses submitted to the Commission or prepared rursvant to Commission requirement since the submittal of the most recent revision to the Updated Final Safety Analysis Report on July 22, 1988. Changes made under the provisions of 10 CFR 50.59 covered by th? seventh revision but not previously submitted to the Commission have been identified.
3.
Changes made to the Quality Assurance Program description set forth in the seventh revision of the Updated Final Safety Analysis Report do not reduce the commitments in the Program description previously accepted by the Commission.
4.
This revision brings the Updated Final Safety Analysis Report up-to-date as of at least January 22, 1989.
5.
The statements and matters set forth herein are true and correct to the best of his knowledge, information and belief.
)
W Vice Presi n Subscribed and sworn to before me this 20 day NOTARIAL SEAL d
of d4,1989 ANNA U. STAUfffR. NOTAW PUBUC J /
6 PEACH BOTT0f.1 TWP., YORK COUNTY, PA 7
}g y[
/
MY COMMISSION EXPmES JAfl.18, l'J92 1
Notary Public