Final & Interim Deficiency Repts CP-88-36 Re Chemical Vol & Control Sys Charging Pumps Alternate Min Flow Recirculation Piping.Initially Reported on 881107.Condition Found Not Reportable Under Provisions of 10CFR50.55(e)
ML20247B962
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/05/1989
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CP-88-36, TXX-89663, NUDOCS 8909130197
Download: ML20247B962 (2)


Text

.

3 if 3,,,. 7, L

MEE

' Log. # TXX-89663

'l 1

r File # 10110 C

C ~

903.9 filELECTRIC i

l September 5, 1989

.' Wiuisen J. Cabiu. Jr.

j i

Executive Vice l>esident i

U. S. Nuclear Regulatory Commission Attn:l Document Control Desk Washington, D. C.

20555

]

SUBJECT:

TCOMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS.-50-445 AND 50-446 CHARGING PUMP MINIFLOW' LINES j

SDAR: CP-88-36 (FINAL REPORT - UNIT 1)

(INTERIM REPORT - UNIT 2)

Gentlemen:

On November 7,1988, TV Electric notified the NRC.by report logged TXX-88765' of~a deficiency involving the Chemical Volume and Control System (CVCS) charging pumps' alternate minimum flow recirculation piping. The latest

. report'on'this' issue,' logged.TXX-89239, was submitted May 3, 1989. 'After j

further evaluation, it has been concluded that this condition is not reportable under.the provisions of 10CFR50.55(e) for Unit 1.

Piping downstream of the discharge of. relief valves 1-8510A & B and 2-8510A & B in.the CVCS charging pumps' alternate minimum flow recirculation flowpath-is required to be supported such that the pressure boundary will remain intact and will allow flow through the piping following a Safe Shutdown Earthquake (SSE).

The concern identified was that compliance with this requirement had not been demonstrated.

l The results of Unit 1 piping stress analysis of the installed piping system

.J and'a structural integrity review of the pipe sapport design indicated that

{

the piping system, as installed, would have remained intact and would have 1

allowed flow through the piping following a Safe Shutdown Earthquake (SSE).

There, fore, it was concluded that the safety of Unit 1. plant operations would not have been adversely affected.

I l

l i

8909130197 890905 r

'@ll F,DR ADOCK 05000445

(

1 o

PDC

\\

400 North Olive Street LB81 Dallas, Texas 75201 l

3

g.,m c,;.

a-4 f[, 4 ' '[ y '.5'*.

a TXX-89663:

September 5; 1989

Page 2 of 2.
Our-next. report on this' issue, which will address the results of Unit.2 safety significance evaluations, will be. submitted after resumption of the balance of Unit 2, engineering activities.

Sincerely,

. William:J. Qahill, Jr..

By:

i. :

D. R. Woodlan-Docket Licensing Manager

'SEC/smp g

.'c. 'Mr. R.

D.. Martin, Region IV Resident Inspectors,.CPSES (3)