Requests Review of Chapter 7, Fueling & Refueling Sys, of Advanced LWR Requirements Document.Schedule for Review Listed
ML20247B761
Person / Time
Issue date: 03/22/1989
From: Long W
Office of Nuclear Reactor Regulation
To: Bagchi C, Cheng C, Marsh T
Office of Nuclear Reactor Regulation
References
PROJECT-669A TAC-72244, NUDOCS 8903300028
Download: ML20247B761 (4)


Text

_ _ _ _ _ _ _ _ _ _.

9

'o UNITED STATES 48" NUCLEAR REGULATORY COMMISSION o

I'

{

WASHINGTON,0. C. 20555 g

March 22, 1989 l

)

Project No. 669 MEMORANDUM FOR: Addressees (ListAttached)

FROM:

William 0. Long, Sr. Project Manager Standardization and Non-Power Reactor Project Directorate i

Division of Reactor Projects III, IV, I

V and Special Projects

SUBJECT:

REQUEST FOR REVIEW 0F EPRI-ALWR REQUIREMENTS DOCUMENT i

CHAPTER 7(TAC #72244)

Chapter 7, Fueling and Refueling Systems," of the Advanced Light Water

-l l

Reactor Requirements Document, has been received from the ALWR Utility l

l Steering Committee via a forwarding letter from E. E. Kintner to Document Control Desk dated February 28, 1989. This document was distributed by to technical review branches by RIDS on March 21, 1989, and is identified in i

NUDOCS under Assession #8903200138.

l Reviewers are requested to review Chapter 7 using the previously established guidelines.

If you determine that you will have no review questions or DSER input, please advise this project directorate via memorandum and we will update our monthly status report accordingly.

The schedule for review of Chapter 7 is as follows:

April 28, 1989 - Requests for additional information (or muorandum l

stating that review branch will have no input) due to PM l

June 9, 1989 - RAI responses due from ALWR Utility Steering Committee July 21,1989 - DSER inputs due to PM July 31, 1989 - Circulate draft DSER for management review / concurrence September 29, 1989 - Issue DSER The Chapter 7 review will overlap the reviews of the other chapters. Receipt of the remaining chapters is scheduled as follows:

Chapter 10 Inst & Control est. June 14, 1989 Chapter 11 Electrical Power est. March 31, 1989 1

It is our goal to issue all DSERs, except that for Chapter 10, by September 29, 1989. The Chapter 10 DSER is scheduled for issuance in April 1990.

ld 7

8903300cce 890322 PDR PROJ V.

\\

669A PNUj

%b

_m-________

l t

i March 22, 1989

.j If you have any questions concerning this review please me at X-21103.

.t%

William O. Long, Sr. Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects J

-2~

March 22, 1989 If you have any questions concerning this review please me at X-21103.

/s/

William 0. Long, Sr. Project Manager Standardization and Hon-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects

. DISTRIBUTION CentraLF11e3 EJordan PDSNP R/F BGrimes NRC PDR OGC JRajan ACRS(10)

KParczewski JStewart JLazevnick LRubenstein RCorreia JMartin GKelly JTsao WLong GSchwenk JSprual BMendelsohn DShum AThadani FCongel JRoe JRichardson RWHouston/RES RWoods/RES BHardin/RES MRubin l

RSerbu FS kopec RArchizel j

l CNichols AEl-Bassioni CTinkler MTaylor (EPRICHAP.7 KICK 0F 0)

PDSNP:PM f PDSNP:PD WLon hV CMiller 03/

9 03//}/89

p March 22, 1989 i

l l

Addressees:

C.Y. Cheng, Acting Chief Materials Engineering Branch.

T. Marsh, Chief l

Mechanical Engineering Branch G. Bagchi, Chief Structural & Geosciences Branch C. McCracken, Chief Chemical Engineering Branch S. Newberry, Chief Instrumentation & Controls Branch F. Rosa. Chief Electrical Systems Branch l

J Craig, Chief j

Plant Systems Branch i

M.W. Hodges,. Chief Reactor Systems Branch R. Erickson, Chief Safeguards Branch L. Cunningham, Chief Radiation Protection Branch R. Barrett, Chief Risk Application Branch D. Matthews, Chief Emergency Preparedness Branch i

A. Gody, Chief Performance & Quality Evaluation Branch W. Regan, Chief Human Factors Assessment Branch 1

1 l

I 1

l