Communicates Utils Commitment to & Participation in Joint Onwers Group Program on MOV Periodic Verification.Licensee Plans to Implement Rev 2 of NEDC-32719,w/o Deviation,In Response to GL 96-05
ML20247B658
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/04/1998
From: Swailes J
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-96-05, GL-96-5, NLS980079, NUDOCS 9805080157
Download: ML20247B658 (3)


Text

_

'n

= =an"##Lm i

Nebraska Public Power District

";;&7=""

s

,e NLS980079 May 4,1998 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:

Subject:

Participation in Joint Owners' Group Program on Motor-Operated Valve Periodic l

Verification (Generic Letter 96-05) i Cooper Nuclear Station, NRC Docket 50-298, DPR-46 l

l

Reference:

1. NRC Generic Letter 96-05 dated September 18,1996," Periodic Verification l

of Design-Basis Capability of Safety-Related Motor-Operated Valves"

2. Letter NLS970049 to USNRC from G. R. Horn (NPPD) dated March 17, l

1997, " Response to NRC Generic Letter 96-05, Cooper Nuclear Station, NRC Docket 50-298, DPR-46"

3. BWR Owners' Group Program on Motor-Operated Valve (MOV) Periodic Verification (NEDC-32719, Revision 2, July 1997) l
4. Letter to T. J. Rausch (BWROG) from T. H. Essig (USNRC) dated October 30,1997," Safety Evaluation on Joint Owners' Group Program on Periodic Verification of Motor-Operated Valves Described in Topical Report NEDC-32719 (Revision 2)"

The purpose of this letter is to communicate Nebraska Public Power District's (District's) commitment to, and participation in, the Joint Owners' Group (JOG) Program on Motor-Operated Valve (MOV) Periodic Verification.

The JOG was formed as an industry-wide program in response to NRC Generic Letter 96-05 (Reference 1). As a result of this effort, in March 1997 the BWR Owners' Group (BWROG) submitted Licensing Topical Report NEDC-32719, Revision 0,"BWR Owners' Group Program on Motor-Operated Valve (MOV) Periodic Verification." In the 180-day response to the Generic Letter dated March 17,1997, the District acknowledged NEDC-32719 and committed to participating in the JOG activities (Reference 2).

\\ \\

9805080157 980504-

/h PDR ADOCK 05000298 P

PDR

' o

~==

= =

NLS980079

' Page 2 of 2 In July 1997, Revision 2 to NEDC-32719 was issued (Reference 3). While this report was endorsed by a substantial number of the members of the BWROG, it was not to be interpreted as a commitment of any individual member to a specific course of action. Accordingly, each member was to formally endorse the BWROG position by letter to the NRC. The NRC's Safety-Evaluation (SE) on the topical report (Reference 4) restated this expectation as follows:

" JOG indicated that participating licensees will be requested, following issuance of this SE, to individually notify the NRC of their plans to implement the JOG program described in -

Revision 2 of the topical reports. The NRC staff's review of the JOG program involved the entire program and not individual ponions. The NRC staff will expect participating licensees to justify any deviations from the JOG program."

By this letter, the District is notifying the NRC of our plans to implement Revision 2 of NEDC-32719, without deviation, in response to Generic Letter 96-05.

Should you have any questions concerning this matter, please contact me.

Sincerely,

/

ohn H. wai es ice Pres dent of Nuclear Energy

/crm cc: Regional Administrator USNRC - Region IV Senior Project Manager USNRC - NRR Project Directorate IV-1 Senior Residert Inspector USNRC NPG Distribution 4

i 4

ATTACHMENT 3 LIST OF NRC COMMITMENTS l

l i

Cottempondence No:

NLS980070 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District.

They are described to the NRC for the NRC's information and are not regulatory commitments.

Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE The District will implement Revision 2 of NEDC-32719, On-going without deviation, in response to Generic Letter 96-05.

l l

l l

l l

J l

l 1

i

%4 1

l l

PROCEDURE NUMBER 0.42 l

REVISION NUMBER 6 l

PAGE 9 OF 13 l

_ _ _ _ _ _ _ _.,