Amend 121 to License DPR-20,changing Tech Specs by Deleting Operability Requirements for HPSI Flow Instruments in Table 3.17.4
ML20247B298
Person / Time
Site: Palisades 
Issue date: 05/12/1989
From: Yandell L
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20247B303 List:
References
NUDOCS 8905240081
Download: ML20247B298 (4)


Text

_

  1. p tug

["

o,h UNITED STATES NUCLEAR REGULATORY COMMISSION

.g j

WASHINGTON, D. C. 20566 k....+/

CONSUMERS POWER COMPANY PALISADES PLANT DOCKET NO. 50-255 AMENDMENT TO PROVISIONAL OPERATING LICENSE.

Amendment No.121 License No. DPR-20 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Consumers F:ner Company (the lisensee) dated July 30, 1985 and supplemented by letter dated January 13, 1986,. complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The f acility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in cr>mpliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 3.B. of Provisional Operating License No. DPR-20 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 3gy, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications, g9052g0 b

0 FDR F

p.ll i-l' e,..

3.

'This license amendment is effective as of the date of its issuance and shall be implemented not later than June 25.-1989 y

FOR THE NUCLEAR REGULATORY: COMMISSION 0

E e Yandell, Acting Director-Project Directorate III-1 Division of Reactor Projects - III. IV, V

& Special Projects Office of Nuclear Reactor Regulation-

Attachment:

Changes to the Technical 3 -Specifications Date of Issuance: May 12, 1989-

)

l l

l

4 l

9 s.

l ATTACHMENT TO LICENSE AMENDMENT NO.121 l

l PROVISIONAL OPERATING LICENSE NO. DPR-20 1

DOCKET NO. 50-255 Revise Appendix A Technical Specifications by removing the page identified below and inserting tra attached page.

The revised page is identified by

]

the captioned amendment number and contains marginal lines indicating the area of change.

REMOVE INSERT l

3-81 3-81

____Y

Table 3.17.4 Instrumentation Operating Requirements for Other Safety Feature Funct'on Minimum Minimum Permissible 0)erable Degree of Bypass No.

Functional Unit C1annels RefNndancy Conditions 1

SIRW Low-Level 2(b) 1 None Switches

~2 WT - Power 3(c) 1 None Comparator 3

(Deleted)

/

4 Air Cooler Service 1

None None Water Flow Instr.

5 Primary and 1

None NA Secondary Rod Insertion and Out-of-Sequence Monitors 6

Fuel Pool Bldg 1

None As Requested Under Crane Interlocks Adminisgtive Control 7

Start-Up Channels 2

1(d)

Not Required Above 10-4% of Rated Power (a)

Cr6ne shall not be used to move material past the fuel storage pool unless the interlocks are available.

'bfc))

One of the inoperable channels must be in the tripped condition, If only 2 channels are operable, load shall be reduced to 70% or less of rated power.

(d)

Minimum operable channels shall be one (1) and minimum degree of redundancy is zero (0) if shutdown neutron power levels indicated on the log range channels are greater than 3 times the lowest decade in which neutron visibility can be confirmed. Neutron visibility will be confirmed through observation of reactivity changes on neutron power level (including a 1/M plot during reactor startup) and comparing the observed changes to the changes noted on previous similar startups.

Instrumentation operability will also be verified by comparison among the three operable channels to ensure their individual responses are in agreement.

Amendment No. 121 3-81 TSP 0785-0255A-NLO4