ML20247A893
| ML20247A893 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 04/30/1989 |
| From: | Mike Williams, Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| WM-89-0140, WM-89-140, NUDOCS 8905230314 | |
| Download: ML20247A893 (7) | |
Text
r..:
.i h l'.d
'f',
u"i &'..-
Attachment to WM 89-0140s 8 j.
y m-
.,.' 6'9
~
t - -.
[.
,% V ~
p:
-7.
4 u-WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION' MONTHLY OPERATING FIPORT MONTH:
April-YEAR: 1989 4
Docket No. :. 50-482 Facility' Operating License No.: NPF-42
~
Report No..,
50 b
..c-Prepared by:
Merlin G. Williams L
5230314 890430 y
^ =cx o S g a *g-gg e
. I, L-i i____...___2__
L__
Attachment to WM 89-0140 I.
SUMMARY
f-l' L
- The following report highlights the operatirg experience of Wolf Creek Generating Station for the month of April, 1989. This report is being provided pursuant to Technical Specification 6.9.1.8.
I.
SUMMARY
OF OPERATING EXPERIEtCE Unit operated near 100 percent power throughout the month.
II, MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES 1.
Realigned Safety Injection Pump "B".(PEM01B) pump and motor.
2.
Replaced sensors on Control Building Supply Air Chlorine monitor (GKAE002&3).
3.
Replaced controller for valve EMHV8837A - Centrifugal Charging Pumps bypass flow to Boron Injection Tank, i
Wolf Creek Generating Station Monthly Operating Report
{
April 1989 Page 1 of 5 1
.1
- /sttachment to WM 89-0140 j
i OPERATING DATA REPORT DOCKET NO.
50-482 j
WOLF CREEK GENERATING STATION l
WOLF CREEK NUCLEAR OPERATING CORPORATION J
DATE- 05-01-89 COMPLETED BY M. Williams TELEPHONE 316-364-8831 OPERATING STATUS 1.
Reporting Period:
April, 1989 Gross Hours in Reporting Period:
719 2.
Currently Authorized Power Level (MWt): 3411 Max. Depend. Capacity (MWe-Net): 1135 L
Design Electrical Rating (MWe-Net): 1170 L
3.
Power Level to Which Restricted (If Any) (Mwe-Net):
N/A 4.
Raasons for restriction (If Any):
N/A This Month-Yr to Date Cumulative 5.
Number of Hours Reactor was Critical 719.0 2,834.3 24,418.4 6.
Reactor Reserve Shutdown Hours 0.0 0.0 339.8 7.
Hours Generator on Line 719.0 2,739.4 23,906.9 8.
Unit Reserve Shutdown Horts 0.0 0.0 0.0
-9.
Gross Thermal Energy Generated (MWH) 2,454,150 9,198,493 78,770,610
- 10. Gross Electrical Energy Generated (MWH) 859,028 3,225,266 27,394,471 11 Net Electrical Energy Generated (MWH) 825,885 3,097,204 26,110,310 12.
Reactor Service Factor 100.0 98.4 76.2
- 13. Reactor Availability Factor 100.0 98.4 77.2 14.- Unit - Service Factor 100.0 95.2 74.6
- 15. Unit Availability Factor 100.0 95.2 74.6 16 Unit Capacity Factor (Using,MDC) 101.2 94.8 72.2
- 17. Unit Capacity Factor (Using Design MWe) 98.2 91.9 69.6 18.
Unit Forced Outage Rate 0.0 1.8 5.7
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): None.
20.
If Shut Down at End of Report Period, Estimated Date of Startup:
N/A Wolf Creek Generating Station Monthly Operating Report April 1989 Page 2 of 5 l
L.
. Attachment to WM 89-0140 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-482 WOLF CREEK GENERATING STATION WOLP CREEK NUCLEAR OPERATING CORPORATION DATE 05-01-89 COMPLETED BY M. Williams TELEPHONE 316-364-8831
' MONTH April, 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M4e-Net)
(MWe-Net) 1 1149' 17 1151 2
1148 18 1150
.3 1149 19 1149 4
1146 20 1150 5
1145 21 1149 6
1148 22 1148 7
1149-23 1148 8
1149 24 1148 9
1149 25 1147 10 1149 26 1146 11 1150 27 1145 12 1150 28 1146 13 1150 29 1148 14
- 1150 30 1148 15 1151 31 N/A 16 1151 i
Wolf Creek Generating Station Monthly Operating Report I
April 1989 Page 3 of 5
~
UMOE t
NT
- 3 AGEY Nf TH a
=
TRNTBE AAUT r
EEI A N
MMAO e
KNTDDO
~
e n
kpG die EE
~
1234 E O.
PE T
e E
MT N
e RR O
E D
r 7
CA C
M O
C E
H FL O
T ft LC C
E l
OU
/
M o
WN S
W N
K O
)
E I
2 E
T
-(
R C
C A
F E
N L
V O
O I
I W
T T
C A
B N
R I
R M
O A
C X
E SN E
O S
I N
)
T E
N C
C I
U I
A D
L L
E P
R D
X N
E R
A
(
E W
9 G
R O
8 N
O P
9 I
R)
)
2 1
NERN D
(
I VEI N
GR R
AI - A A
NO E
l RTLL I T W
i TAAP N
TC O
r RNX W
I A P
p RTOE O
CE A
OSI(
D RG TI T -
I T
S N
n ANAR U
EI i
RI RE H
SHC EMEH S
DTU s
PDPT
~
O D
n OAOO T
HNE o
I TWR i
N EO t
U MDR c
EFGH O
u d
e N
r
)
O N
S) r I
A1 e
A E(
w L
R -
o P
'N p
X O
E I
N) t
(
T T
OS n
S C
I R a
EE I
.0 TU c
RT R
4 AO i
U T
1 0
RH f
LR S
U(
i I O E
D n
A R
- 9
- - 8 8
i C
Y 9
g FE
. wM 9
D s
TNGR 1
E NANO
. W L
o ENI T DU n
MELA o
l EED PTEI t
i PCE e
I NUU r
YRH r
UI FG
.t p
TOC e
QAEE n
A FS w
EMRR em e
h FS r
c e
ABCD a
H h
t T
T t
N e
N A
O t
O 1
B a
S y-D Y
A T
R E
R R
R O
P o
M E
N
(
)
R S
R
'[' Attachment'toWM 89-0140 WOIE CREEK NUCLEAR OPERATING CORPORATION WOLP CREEK GENERATING STATION UNIT NO. 1 MONTH
-April, 1989
SUMMARY
OF OPERATING EXPERIENCE
' Listed below in chronological sequence is a sumnary of operating experiences for this month which required load reduction or resulted in significant non-load related incidents.
DATE TIME EVEWP April 01, 1989 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit in Mode 1 - Power Operation.
l Wolf Creek Generating Station Monthly Operating Report April 1989 Page 5 of 5 l
l i______._.....
p 2 p '%. 8 i
~ ~
W#J.,F CREEK 1
NUCLL AR OPERATING CORPORATION D
sert o. withers -
Pres @nt and i
Chief Executwo Omcor
~May 10,1989 WM 89-0140 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, D. C.
20555 Subj ect : Docket No. 50-482: April,1989, Monthly Operating' Report Gentlemen Attached is the April,. 1989, Monthly Operating Report for Wolf Creek Generating-Station.
This submittal is being made in accordance with the q
_ requirements'of Technical Specification 6.9.1.8.
l Very truly yours, j
l l
Bart D. Withers President and-Chief Executive Officer BDW/j ad Attachment cc: B. L. Bartlett (NRC), w/a~
J E. J. Holler (NRC), w/a R. D. Martin (NRC), w/a l
D. V. Pickett (NRC), w/a
)
/
1 l
P.O. Box 411/ Burhngton, KS 66839 / Phone:(316) 364-8831 An Equal Opportunity Ernployer MS/HCNET j