Responds to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thinning. Long-term Erosion/Corrosion Program Implemented for Facility
ML20247A012
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/17/1989
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-08, GL-89-8, HL-641, NUDOCS 8907210102
Download: ML20247A012 (2)


Text

.. - - _ _ _

1 s

.t_

hk l

HL-641 0215V July 17, 1989 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 PLANT HATCH - UNITS 1, 2 NRC 00CKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 RESPONSE TO GENERIC LETTER 89-08 EROSION / CORROSION-INDUCED PIPE HALL THINNING Gentlemen:

On May 22, 1989, Ceorgia Power Company (GPC) received Generic Letter (GL) 89-08, "Erosior, Corrosion-Induced P Wall Thinning."

The GL to provide assurance ipe required licensees that formalized procedures or admiisistrative procedures were in place which would assure that an effective long term erosion / corrosion program was

(.or would be) implemented. An effective long term program will maintain thL structural integrity of all single phase and two phase high-energy carbon steel systems. Detailed information was not to be submitted for NRC review.

Georgia Power Company has implemented such a

long term erosion / corrosion program for Plant Hatch.

Formalized (controlled) program documents have been issued for both units.

Our program meets the intent of the NUMARC guidelines and programmatic controls govern surveillance of the structural integrity of the high-energy single phase and two-phase flow carbon steel systems.

This assures an effective long term program at Plant Hatch.

gonggs $501 fp\\

PDR P

J

  • ( CUrgial'0Wer 1

U.S. Nuclear Regulatory Commission j

July 17, 1989 Page Two The information provided herein is true to the best of my knowledge and belief.

If you have questions, please advise.

Respectfully submitted, y).

?

H. G. Hairston, III Sworn to ano subscribed before me this /70 day of Oulu 1989.

LaLu km $k]!fEl la00 fob P$PFt. CF15,1s02 GKM/eb c:

Georaia Power Company Mr. H. C. Nix, General Manager - Nuclear Plant Mr. J. D. Heidt, Manager Engineering and Licensing - Hatch GO-NORMS i

M.S. Nuclear Regulatory Commission. Hashinaton. D.C.

I Mr. L. P. Crocker, Licensing Project Manager - Hatch U.S. Nuclear Regulatory Commission. Reaion II Mr. S. D. Ebneter, Regional Administrator Mr. J. E. Menning, Senior Resident Inspector - Hatch j

0215V