Be ver Valley Power Station Shippingport PA 150770004
> fr l
JOHN D. SIEBER Vce Premdent Neleat Group 6412)(4 7 5255
%.i t
i l.
August 29, 1989 l
L U. S.-Nuclear Regulato?y Commission
,o' Attn:
Document Control Desk Washington, DC 20555
Reference:
Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 l
l First_ Refueling Outage Inservice Inspection Report i
. Gentlemen:
I This letter forwards the Inservice Inspection Report on ASME l
Class
.1, 2-and 3 components examined during the first refueling outage at Beaver Valley Unit No.
2.
The ASME Boiler and Pressure Vessel
- Code,Section XI, Article IWA-6230 requires that an inservice inspection report be submitted to the enforcement and regulatory authority; having jurisdiction at the plant site within ninety (90) days after completion of an inservice inspection.
The latest inservice inspections at Beaver Valley Unit No. 2 were L
completed on June 1, 1989.
These examinations are part of Interval 1, Period 1 of the l
' Beaver Valley Unit NO. 2 ISI inspection schedule.
The inservice l
inspections 'were performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code, 1983 edition through Summer L
1983 addenda.
Please contact my office if you have any questions regarding the attached report.
j Very truly yours, I
l-
?
cet
. D. Sieber Vice President Nuclear Group cc:
Mr. J. Beall, Sr. Resident Inspector l
Mr. W. T. Russell, NRC Region I Administrator Mr. P. Tam, Sr. Project Manager g{,I