K

{

Be ver Valley Power Station Shippingport PA 150770004

> fr l

JOHN D. SIEBER Vce Premdent Neleat Group 6412)(4 7 5255

%.i t

i l.

August 29, 1989 l

L U. S.-Nuclear Regulato?y Commission

,o' Attn:

Document Control Desk Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 l

l First_ Refueling Outage Inservice Inspection Report i

. Gentlemen:

I This letter forwards the Inservice Inspection Report on ASME l

Class

.1, 2-and 3 components examined during the first refueling outage at Beaver Valley Unit No.

2.

The ASME Boiler and Pressure Vessel

Code,Section XI, Article IWA-6230 requires that an inservice inspection report be submitted to the enforcement and regulatory authority; having jurisdiction at the plant site within ninety (90) days after completion of an inservice inspection.

The latest inservice inspections at Beaver Valley Unit No. 2 were L

completed on June 1, 1989.

These examinations are part of Interval 1, Period 1 of the l

' Beaver Valley Unit NO. 2 ISI inspection schedule.

The inservice l

inspections 'were performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code, 1983 edition through Summer L

1983 addenda.

Please contact my office if you have any questions regarding the attached report.

j Very truly yours, I

l-

?

cet

. D. Sieber Vice President Nuclear Group cc:

Mr. J. Beall, Sr. Resident Inspector l

Mr. W. T. Russell, NRC Region I Administrator Mr. P. Tam, Sr. Project Manager g{,I

% {1 890912029e spos2, DR hDOCK 050004:2 N

PD*