Application for Amends to Licenses NPF-2 & NPF-8, Incorporating Minor Administrative & Editorial Changes & Correcting Typo Re Loss of Power Undervoltage Trip Relays & Calibr Schedule for Seismic Instrumentation
ML20246P546
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/20/1989
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20246P552 List:
References
NUDOCS 8903280249
Download: ML20246P546 (2)


Text

y... - - - - -.

u....

6 i'.

AlCbama Power Company 40 inverness Center Parbway Post Office Box 1295 j

Dirmingham, Alabama 35201 1

Telephone 205 868-5581 i

W. G. Hairston, Ill M

Senior Vice President Nuclear Operations AlabamaPower the Southern electrC System i

March 20, 1989 l

Docket Nos. 50-348

'l 50-364 U. S. Nuclear Regulatory Commission 8

ATTN: Document Control Desk Vashington, D. C.

20555 Gentlemen Joseph H. Farley Nuclear Plant - Units l'and 2 I

Proposed Technical Specification Changes Provided herein are miscellaneous' technical specification changes for Joseph H. Farley Nuclear Plant Units 1 and 2.

These proposed changes incorporate minor administrative and editorial changes.

I provides the proposed changes described below.

Clarifications are being made to the wording of Specification 4.2.2.2.f.3 to more accurately define the grid plane regions of the core. A typographical mistake is corrected on Table 3.3-3.

A proposed l

change to delete Figure 3.3-1 and revise Table 3.3 4 for loss of power undervoltage relay trips is included. Table 4.3-4 is being updated to state the current recalibration schedule for seismic instrumentation and correct a typographical error. A statement is being added to l

Specification 3.6.4.1.a which disclaims the provisions of Specification 3.0.4 and provides for establishing an alternate hydrogen sampling capability with the hydrogen analyzer inoperable.

Proposed changes concerning correspondence to the NRC as specified in 10CFR50.4 are provided. contains the required significant hazards analysis, pursuant to 10CFR50.92. ' Based on the analysis provided, Alabama Power Company has determined that the proposed changes'to the Technical Specifications vill not increase the probability or consequences of an accident previously evaluated, create the possibility of a new or.

different kind of accident from any accident previously evaluated, or involve a reduction in a margin of safety.

The Plant Operations Review Committee has reviewed this proposed change and the Nuclear Operations Review Board will review this proposed change at a future meeting. These proposed changes are requested by September 15, 1989.

00 8903280249 890320 PDR ADOCK 05000348 M

i l P

PDC

e a

U. S. Nuclear Regulatory Commission March 20, 1989 Page 2 j

i A copy of this change has been sent to Dr. C. E. Fox, the A"labama State Designee, in accordance with 10CFR50.91(b)(1).

If.there are any questions, please advise.

1 Respectfully submitted, ALABAMA POWER COMPANY i

1 lb.

L W. G. Hairston, III-l I

WGH,III/BHV: dst-V8.3 Attachments cc: Mr. S. D. Ebneter SWORN TO AND SUBSCRIBED BEFORE ME Mr. E. A. Reeves DAY OF W W 1

, 1989

)

Mr. G. F. Maxwell THIS JOU 1

Dr. C. E. Fox fotary Public j

JM 00%MISS10N EXFiRES DEC.15,1902 My Commission Expires:

1 i

4 1

i i

t_

_ _ _ _. _ _ _ _ _. _ _ _ _ _. _ _ _ _ _. _