ML20246P463

From kanterella
Jump to navigation Jump to search
Forwards Total & Direct Insp Hour Data for Last Several Yrs & Insp Effort/Plant for Most Recent 12-month Period.Total Effort Has Decreased About 10.5% & Direct Insp Effort,Due to Increased Efficiency,Increased About 7% in Last 3 Yrs
ML20246P463
Person / Time
Issue date: 07/05/1989
From: Sniezek J
Office of Nuclear Reactor Regulation
To: Colvin J
NUCLEAR ENERGY INSTITUTE (FORMERLY NUCLEAR MGMT &
References
NUDOCS 8907200213
Download: ML20246P463 (7)


Text

_ _ _ - _ _. - _ _ _

L JUL 0 51989 Mr. J. F. Colvin Nuclear Management and Resources Council Suite 300 1776 Eye Street, N.W.

Washington, D.C.

20006-2496

Dear Mr. Colvin:

In followup to our recent discussions, I am forwarding you the total and direct inspection hour data for the last several years (Enclosure 1) and the inspection effort / plant for the most recent 12 month period (Enclosure 2).

I believe you will find the data to be interesting and that it belies the 1

]

perception that overall inspection effort is markedly increased. To the contrary, total inspection effort has decreased about 10.5% and due to increased inspection efficiency direct inspection effort has increased about 7% during the last 3 years.

If you have any questions please give me a call.

Sincerely, Original signed by James H. Sniczek James H. Sniezek Deputy Director Office of Nuclear Reactor Regulation

Enclosures:

As stated Distribution VStello, EDO PDR Central Files TEMurley R/F JHS R/F JHSniezek RR

$3 7/* /89

$ }f 4.

zek d

J

/) 9 0

/

8907200213 890705 s

PDR REVGP ERGfJUt1RC

/

FDC Nfl0 FILE CEiWEl COPY

l w

y,..

['

i Perlod-8/86-7/87 The_ average total inspection effort 1/perplant(docket)was5,700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br />.

The average' direct inspection effort 2/ per plant (docket) was 2',905 hours0.0105 days <br />0.251 hours <br />0.0015 weeks <br />3.443525e-4 months <br />.

Period 7/87-6/88 The average total insnection effort per plant was 5,165 hours0.00191 days <br />0.0458 hours <br />2.728175e-4 weeks <br />6.27825e-5 months <br />.

The average direct inspection effort per plant was 3,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />.

Period 5/88-4/89 The average total inspection ef' ort per plant was 5,105 hours0.00122 days <br />0.0292 hours <br />1.736111e-4 weeks <br />3.99525e-5 months <br />.

The average direct inspection effort per plar.t was 3.120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br />.

Il' Includes preparation, inspection and report writing.

2/

Includes on-site and off-site inspection.

f

__________m._

.y f,-( $,' t
. 9;;.-
3.

Direct Inspection Effort / Plant - 4/24/88-4/22/89 Plant Name

- Direct Inspection Hours.

Browns Ferry 3 1033 Salem 1 1431-Beaver Valley 1-1561 Susquehanna 1 1280 Point Beach 2 1521 Point Beach 1 1567 Susquehanna 2 1508 Beaver-Valley 2 1770' Millstone 3

-1357 Browns Ferry 1 1142 Zion 2 1718 4

Farley 2 1757 Byron 2 1717 Byron 1 1721 Farley 1 1800 l:

Braidwood 2 1954 Braidwood 1 1928 Oconee 3 1837

. ~

Oconee 2 1733 l

Palo Verde 2 1850 Catawba 1914

______m_____

_ _ _ _ _ ____-_.m_

_____..m

.m

7 e

1[

r,.

1.

2

. Direct Inspection Effort / Plant - 4/24/88-4/22/89 l..

. Plant Name Direct Inspection Hours Millstone 1 1821 Salem'2-2058

' Quad Cities 2 2116-Kewaunee 2202 Catawba 1 1971 San Onofre 3 1765 Diablo Cinyon' 2 2127 4

McGuire 2

.2284 LaSalle 1:

2153.

San Onofre 1 2242 San Onofre 2 1791 Prairie Island 2 2019 Quad. Cities 1 1949 Palo Verde 3 2204 LaSalle 2 2257 Prairie Island 1 2156 Calvert Cliffs 2 2149 Arkansas'2 2231

-Yankee Rowe 1 2469 Oconee 1 2220 Big Rock Point 1 2301 St. Lucie 2 2274

, J::

9 6

i ';

. e.

T

'3 Direct. Inspection Effort / Plant - 4/24/88-4/22/89.

Plant Name

-Direct Inspection Hours

-Seabrook 1

.2103

?>

Millstone 2 2180 g

Diablo Canyon 1 2513 St'. 'Lucie 1 2318 Shoreham 2640 Hope Creek 1-2606 Zi on ' I'-

2155

'Dresden 3 2642 Palo Verde 1 2664 Calvert Cliffs 1 2466

' North Anna 1 2329 Haddam Neck-2526 Callaway 1 3096 Nine Mile Point 2 2541

' Hatch 2 2705 Hatch 1 2676 Cook 1 3088 McGuire 1 3088 River Bend 1 3333 r

l.

. North Anna 2 2269 Dresden 2 3371

' Crystal River 3 3078 Fort St. Vrain 3144 s

e

[

.e

.g o qg (

d 4'

v Direct Inspection Effort / Plant - 4/24/88-4/22/89 i

Plant Name-Direct Irapection Hours Ginna 3574 Limerick 1 3470'

' Brunswick 2 3372 Fitzpatrick 3501

- Robinson 2 3402 Perry 1 3622 Turkey Point 4 3195 Monticello 3725 Vermont Yankee 1 3071 Cooper Station 3550 Arkansas 1 3684 Surry 2 3522 Brunswick 1-3406

' South Texas l' 4423 Grand Gulf 1 3858 Cook 2 3942

{

Turkey Point 3 3507 Three Mile Island 1 4437

)

Palisades 4614 Indian Point 3 4082 Indian Point 2 3927

)

Peach Bottom 3 4124 i

Sumer 1 4676 i

i Ji_L--.__---_-.--

c ;

.l - ; -_

~'

~<

I 4 -

Direct Inspection Effort / Plant - 4/24/83-4/22/89

. Plant Name Direct Inspection Hours Waterford 3 4272 Msine Yankee 3933 Duane Arnold 4802 South iexas 2 5114 Wolf Creek 1 5208 1

Surry 1 4828 Harris 1 4460 Peach Bottom 2 4528 Sequoyah 1 5216 Washington Nuclear 2 4384 Sequoyah 2-6219 Rancho Seco 1 5609 Trojan 5436 Vogtle 1 4904 Cli;. ton 1 5003 Nine Mile Point 1 4546 Fermi 2 5347 Fort Calhoun 1 5817 Browns Ferry 2 6966

-Oyster Creek 1 5684 Davis-Besse 1 6302 Vogtle 2 6553 Pilgrim 1 8236 i

m.

_ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _