Text
e 8,h[
[o UNITED STATES g
NUCLEAR REGULATORY COMMISSION n
- y WASHINGTON, D. C 20555
%,...../
SYSTEMS ENERGY RESOURCES, INC., et al.
DOCKET NO. 50-416 GRAND GULF NUCLEAR STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 61
~
License No. NPF-29 1.
Ths ?.uclear Regulatory Commission (the Comission) has found that A.
The application for amendment by System Energy Resources, Inc.,
(the licensee), dated Decenber 2,1988, complies with the standarr's and requiremerits of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application,.the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the comon I
defense and security or to the health and safety of the public; and E.
The issubnce of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
l l
RL?P110102evoeg, p
ADOCK 05000416 PDC l
c=,
[-
ze
, '2.
Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment;
'and paragraph 2.C.(2) of Facility Operating License No. NPF-29_is hereby amended to read as follows:
.(2) Te,
_ cal Specifications The Technical Specifications. contained in Appendix A and the Environmental Protection Plan. contained.in Appendix B, as revised through Amendment No. 61, are hereby incorporated into this license. System Energy Resources, Inc. shall operate the facility in accordance with the Technical-Specifications and the Environmental-Protection Plan.
3.
This' license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By:
.w Elinor G. Adensam, Director Project Directorate 11 1 Division of Reactor Projects I/II H-s.
Office of Nuclear Reactor Regulation
. Attachnent:
Changes to the Technical Specifications Date of Issuance: August 31, 1989
.]
n-Y N
e
- DRPR:SPLB: DEST OG s
- D: 21 RPR :
...:.....JW W._:_...' _'_...:_
0FC ;:LA:PD21:DRPR:PM:PD
- EAde sam NAME
>"FA kon : LK ner':bd:JWermiel' d
TDATE\\{o 07/ C,/89 -....d...........:_
......__..:..........._:.45 2' ffL.:
go.... :............ : _ _ _.......
- 074Hf/89
- 07/2[/89
- Oh
/89
- I "0FFICIAL RECORD COPY' c
ATTACHMENT TO LICENSE AMENDMENT NO. 61_
FACILITY OPERATING LICENSE NO. NPF-29 DOCKET NO. 50-416 I
Replace the following page of the Appendix "A" Technical _ Specifications with the attached page. The revised page is identified by Amendment number and contains a vertical line indicating the area of change.
Remove Insert 3/4 9-10 3/4 9-10 j
I I
~
REFUELING OPERATIONS-FUEL HANDLING' PLATFORM.
LIMITING CONDITION-?OR OPERATION
(
o 3.9.6.3 The fuel handling platform shall be OPERABLE and only the main hoist shall be used to move irradiated fuel.
APPLICABILITY:
During handling of fuel assemblies or control rods in the auxiliary building with the fuel handling platform.
ACTION:
With the requirements for fuel handling platform OPERABILITY not satisfied, suspend use of any inoperable fuel handling platform equipment from operations involviag the handling of fuel assemblies or control rods after placing the load in a safe condition.
SURVEILLANCE REQUIREMENTS 4.9.6.3.1 Each fuel handling platform hoist to be used for handling fuel assemblies or control' rods shall be demonstrated OPERABLE within 7 days prior to.the handling of fuel assemblies or control rods by:
a.
Demonstrating operation on the slack cable cutoff on the main hoist when the total cable load is 50110 pounds.
b.
Demonstrating operation of the grapple-engaged loaded interlock on
-the main boist'before the total cable load exceeds 400 pounds.
c..
Demonstrating operation of the jam cutoff on the main hoist before the total cable load exceeds 1150 pounds.
d.
Demonstrating gration of the primary and redundant overload cutoff on both of the auxiliary hoists before the load exceeds 550 pounds (with the load override switch on the monorail auxiliary hoist at the 500 pound position).
e.
Demonstrating operation of the primary and redundant overload cutoff on the monorail auxiliary hoist before the load exceeds 1050 pounds l
with the load override switch at the 1000 pound position.
~4.9.6.3.2 The monorail auxiliary hoist load override switch shall be verified l to be in the 500 pound position within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during hoist operation, except when engaged in new fuel movement in which case the switch may be in the 1000 pound position.
GRAND GULF-UNIT 1 3/4 9-10 Amendment No. 61