TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSCE 37401 l
SN 157B Lookout Place MAY 121989 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-260 Tennessee Valley Authority
)
BROWNS FERRY NUCLEAR. PLANT (BFN) - NRC INSPECTION REPORT NUMBER 50-260/88-200 EMERGENCY OPERATING INSTRUCTIONS (E0Is)
In inspection report 50-260/88-200 NRC identified several concerns in the areas of development and implementation of the E0Is, evaluation of the containment venting procedures, evaluation of personnel access to the reactor building during emergencies, and deviations between the E0Is and their base documents.
By letters dated December 2, 1988 and February 28, 1989, TVA deferred a complete response to NRC Inspection Report 50-260/88-200 until May 15, 1989.
At this time most of these concerns have been addressed, the revision to the E0Is has been implemented, and the operators are currently being trained on the changes.
TVA is scheduling the remaining work to be completed for the restart of unit 2.
There are a few items pertaining to this inspection that will require an evaluation and/or field work.
These items are being integrated into the overall schedule for BFN restart.
Therefore, as discussed with G. E. Gears of the NRC staff on May 11, 1989, TVA will provide the response to the above inspection report by May 31, 1989.
The enclosure contains a list of the commitments.
Please refer any questions regarding this submittal to Patrick Carier, Manager of BFN Site Licensing, (205) 729-3570.
Very truly yours, TENNESSEE VALLEY AUTHORITY
/
Manag r, Nuclea sing I
and Regulatory Affairs l
Enclosure l
cc:
See page 2
)
"D905220034 890512 0(
PDR ADOCK 05000260 t
Q PDC f
An Equal opportunity Employer
1 L
<.[,
i U.S. Nuclear Regulatory Commission l
MAY if,1989 -
cc-(Enclosure):.
Ms. S. C. Black, Assistant Director-for Projects TVA Projects Division i
U.S. Nuclear Regulatory Commissiin
]
One White Flint, North j
11555 Rockville Pike l
Rockville, Maryland 20852 Mr. B. A. Wilson, Assistant Director for Inspection Programs-TVA Projects Division
,L U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta,-Georgia ~30323 Browns Ferry Resident Inspector Browns Ferry Nuciear P1 ant' Route 12, Box 637; Athens, Alabama 35609-2000 I
1
s ENCLOSURE NRC INSPECTION REPORT NO. 50-260/88-200 LETTER FROM J. G. PARTLOW TO S. A. WHITE DATED SEPTEMBER 28, 1988 LISTING OF COMMITMENTS TVA will provide a response to the NRC's concerns identified in Inspection Report 50-260/88-200 by May 31, 1989.
_. _ _ -