Forwards Plant Monthly Status Rept for 890718-0818
ML20246N587
Person / Time
Site: Crane  
Issue date: 08/29/1989
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8909080157
Download: ML20246N587 (4)


Text

m

- +

,n

. ; %g..

e y*

'AUG 2 91989 n.

t

w, f

Docket Nos'. 50-289;L50-320 E

MEMORANDUM FOR:

Edward C. Wenzinger, Chief Projects Branch No. 4

Division of Reactor Projects FROM:

.Curtis-J. Cowgill, Chief Reactor Projects Section 4B

SUBJECT:

TMI STATUS REPORT _FOR THE PERIOD JULY 18 _ AUGUST 18, 1989 4

Enclosed is the TMI' Resident Office monthly status report, which covers both m

TMI-1 and TMI-2. This report is to provide NRC management and the public with highlights of significant events at TMI-1 and TMI-2 from an NRC regulatory-1' perspective.

Original Signed By:

Curtis J. Cowgill, Chief Reactor Projects Section 4B Division of Reactor Projects

Enclosure:

As Stated cc w/ enclosure:

S. Varga, NRR' J. Stolz;-NRR R.'Hernan, NRR

'M. Masnik.NRR T. Martin, EDO J. Partlow. NRR J. Roe, NRR L. Whitney, NRR T.' Gerusky, BRP/ DER, Commonwealth of Pennsylvania Governor's Office of Policy, Commonwealth of Pennsylvania TMI Alert Susquehanna. Valley Alliance Friends & Family of TMI D. Davenport L. Drey E. Harzier A. Herman H. Hucker J. Johnsrud P. Smith Hi Spinelli C. Wolfe

((({

Concerned Mothers and Women Public Document Room Local Public Document Room-

)

0FFICIAL RECORD COPY TMI MONTHLY STATUS REPORT - 0001.0.0 8909080157 890829 m

11/29/80

{DR ADOCK 050002g9 PDC

(!

~

~-

4

... - ~

AUG 2 91989 Edward C; Wenzinger 2

i bec w/ enclosure:

K. Abraham, RI (2 copies)

M. Miller, RI W..Kane, RI

- W. Baunack, RI C. Cowgill, RI J. Bell, NRR.

Region I Docket Room (w/ concurrences)

F. Young, RI (3 copies)

D. Johnson T. Moslak L. Thonus R. Brady RI:DRQ[4 f

RI:DRP RI:DRP r FYoung/N CCowgi E',le n z i. e -

8/M/89 865/89 8,

/89 0FFICIAL RE O D COPY TMI MONTHLY STATUS REPORT - 0002.0.0 11/29/80

ENCLOSURE TMI-1 AND TMI-2 STATUS REPORT FOR THE PERIOD JULY 18 - AUGUST 18, 1989 1.

TMI-1 a.

Facility Operations Summary TMI Unit 1 operated at full power during this report period, completing 233 days of continuous operation on August 18, 1989.

No significant events or challenges to plant safety systems occurred during this period.

2.

TMI-2 a.

Facility Activities Summary During this report period, defueling crews continued to remove core debris frora the lower head of the vessel using pick and place techniques and air lifting equipment. Debris was also removed from the reactor vessel hot legs using a specially designed scraper /vacu-uming tool. Approximately 15,000 lbs. of material rema'in in the vessel. The majority of this material is located in the annular space between the baffle plates and core former walls.

Removal of the core baffle plates are required to defuel this area. To remove the baffle plates, 864 bolts, that secure the plates, must be removed. To date, defueling crews have removed 831 bolts, either by using a remotely operated hydraulic wrench, or drilling out the bolts. The remaining bolts will be removed upon completion of high pressure (cavijet) operations designed to break up material that is adhering to adjacent surfaces.

Present schedules indicate that reactor vessel defueling will be 9, *L completed by this fall.

y During late September, the licensee will perform series of tests to characterize the indications of cracking obseryw around the E-7 and G-6 incore instrumentation nozzles on the lower head.

Special tools will be fabricated to determine the size, nature, and extent of these crack indications. Other areas of the lower head will also be examined for additional crack indications.

I 3.

NRC Staff Activities The NRC staff assigned on site at this period consisted of a senior resident inspector, three resident inspectors, and a project manager for TMI-2.

l

_________--__-______________-____-_-____--____---O

~ <

g a.

Inspection Reports During this period, Region I issued the following inspection reports.

TMI-1 Inspection Report No. 50-289/89-12 on August 16, 1989, addressing routine inspection of power operation activities.

b.

Monthly Status Report As the defueling activities at TMI-2 near completion, a monthly status report is no longer merited.

Licensee activities and the sctivities of the NRC staff will continue to be addressed in routine inspection reports. Accordingly, this is to advise readers that the monthly status report will discontinue once reactor vessel defueling is completed.

4.

Public Meetings The Advisory Panel for the Decontamination of TMI-2 will meet on Thursday, September 21, 1989, from 7:00 p.m. to 10:00 p.m.

The meeting will be held at the Holiday Inn Center City, 23 South Second Street, Harrisburg, Pennsylvania.