ML20246N463
| ML20246N463 | |
| Person / Time | |
|---|---|
| Issue date: | 07/13/1989 |
| From: | Brach E Office of Nuclear Reactor Regulation |
| To: | Wolfe B GENERAL ELECTRIC CO. |
| Shared Package | |
| ML20246N467 | List: |
| References | |
| REF-QA-99900403 NUDOCS 8907190375 | |
| Download: ML20246N463 (2) | |
Text
gy; pg
]#h@rtog s-
.k L-UNITED STATES my[-
.g
- NUCLEAR REGULATORY COMMISSION
'3g
'y 7
wassiuorow. o.c. rosss
+6,, g July 13, 1989
&1
- vv
~D ck'et No. 99900403/88-02
-Dr. Bertman Wolfe, Vice President and General Manager GE Nuclear Energy 175 Curtner Avenue San Jose, California 95125
Dear Dr. Wolfe:
This. letter addresses the inspecten of your facility lat San Jose, California conducted by Messrs. Robert Pettis and Stephen Alexander of the Vendor Inspection Branch on September.6-9, 1988, and the discussions of their findings with Mr. James Fox and other members of your staff at the conclusion of the inspection. Release of this report was delayed during NRC's ongoing review of nonconforming and substandard vendor products.
The inspection was performed to review GE Nuclear Energy's (GE NE's) activities to determine if refurbished molded case circuit breakers (CB's) and other electrical equipment were purchased from sources identified in NRC Information Notice 88-46 and' resold to nuclear power plants.
Additionally, information regarding GE NE's program.for dedicating comercial grade electrical equipment was also reviewed.
During the inspection it was found that the implementation of your. quality assurance program failed to meet certain NRC requirements, specifically in the area of purchasing from an unapproved supplier, as described in GE Nuclear Services Procedure NSP 50-01, Revision 2, dated September 15, 1987.
In addition, the. NRC also has concerns over the adequacy of GE NE's dedication program for upgrading commercially procured molded case CB's and as'a result has classified this as an unresolved item.
In response to the enclosed Notice of Nonconformance, please provide us within 30 days from the date of this letter a written statement containing:
(1) a description of steps that have been or wil'1 be taken to correct this item; (2) and (3) ption of steps that have been or will be taken to prevent' recurrence; a descri the dates your corrective action and preventive measures were or will be completed. We will consider extending the respont,e time if you can show good ccuse for us to ao so.
The response requested by this letter is not subject to the clearance procedures of the Office of Management end Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
8907190375 890713 con $99 "VUE f
,o h
- >li. 9 lV Dr. Bertram Wolfe July 13. 1989 l
infaccordance with 10'CFR 2.790 of the Commission's regulations., a copy of this letter and the enclosed. inspection report will be placed in the 11RC's'Public Document' Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely.
Original signed by:
Edward T. Baker for E. William Brach, Chief Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation
Enclosures:
- 1. Appendix A-Notice of Nonconformance
- 2. Appendix B. Inspection Report 99900403/88 02 DISTRIBLITION RIUS. Code.IEiD97)"
VIB Reading'
~
DRIS Reading JAZwolinski EWBrach ETBa ker RLPettis a
[LETiD FOR DR. WOLFE]
0FC
- VlB:DRIS
- 5C-
...... :................ :.L9.V I B : M I S7. d...... :.. " R S
- B V NAME
- RPettis:n
- ETBaker
- EWBrac DATE :07/\\Vf89
- 07//2/89
- 07//>J89 0FFICIAL RECORD COPY