i r.

4 L-f OPERATING DATA REPORT-DOCKET NO. 50-424 DATE: MAR 5,'1989 COMPLETED BY: R.A. M0YE OPERATING STATUS 1.' UNIT NAME:

A. W. V0GTLE UNIT 1

2. REPORT PERIOD:

FEB 89 l-

3. LICENSED THERMAL POWER (MWt :

3411

4. NAMEPLATE RATING (GROSS MWe :

1148

5. DESIGN ELECTRICAL RATING N T MWe :

1101

6. MAXIMUM DEPENDABLE CAPACI Y GROS MWe):

1137

7. MAXIMUM DEPENDABLE CAPACITY NET MWe 1083
8. IF CHANGES DCCUR IN CAPACITY RATINGS):

'(ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NO RESTRICTIONS

-10. REASONS FOR RESTRICTION, IF ANY:

N/A THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

672 1416 15337

12. NUMBER OF ' HOURS REACTOR WAS CRITICAL:

643.7 1200.1 12075.2

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE:

613.3 1153.8 11646.6

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0-

16. GROSS THERMAL ENERGY GENERATED H):

1905573 3677476 38108631.9

17. GROSS ELEC. ENERGY GENERATED 635870 1223790 12613860-
18. NET ELEC. ENERGY GENERATED (M 600480 1152480 11864610
19. REACTOR SERVICE FACTOR 95.8%

84.8%

78.7%

20. REACTOR AVAILABILITY FACTOR 95.8%

84.8%

78.7%'

21. UNIT SERVICE FACTOR:-

91.3%

81.5%

75.9%

22. UNIT AVAILABILITY FACTOR:

91.3%

81.5%

75.9%

23. UNIT CAPACITY FACTOR USING MDC NET :

82.5%

75.2%

71.7%

24. UNIT CAPACITY FACTOR USING DER NET :

81.2%

73.9%

70.3%

'25. UNIT FORCED OUTAGE RA E:

8.7%

17.5%

15.2%

26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A

28. UNITS IN TEST STATUS ( PRIOR TO COMMERCIAL OPERATION):

N/A i

E2-2

[88" 8880 838?Qp J

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-424 DATE:

MAR 5, 1989 UNIT NAME:

V0GTLE UNIT I COMPLETED BY: R. A. M0YE TELEPHONE:

(404) 724-8114 x3212 REPORT MONTH FEB 89 J

R M

5 E

E Y

T A

T LICENSEE SC Y

S H

EVENT T0 COMPONENT CAUSE & CORRECTIVE P

DURATION 0

0 REPORT-ED CODE ACTION TO NO.

DATE E

(HOURS)

N D

NUMBER ME (SUBCODE)

PREVENT RECURRENCE 89-2 02-10 t

b5.7z A T 89-005

- TJ-P 5tt stLOW 89-3 02 P

.198.4 A

5 89-006 SJ P

SEE BELOW F: FORCED

. REASON:

METHOD:

EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) I - MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEEDING 24 HOURS.

E-0PERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - 0THER (EXPLAIN)

G-0PERATIONAL ERROR (EXPLAIN)

H-0THER (EXPLAIN) 89-2 CAUSE: HIGH VIBRATION TRIP 0F MAIN FEEDWATER PUMP,"A", CAUSED A LOW LEVEL CONDITION IN STEAM GENERATOR #4.

CORRECTIVE ACTION: MAIN FEEDWATER PUMP HAS BEEN DISASSEMBLED AND INSPECTED TO DETERMINE CAUSE OF HIGH VIL.'.ATION. PUMP HAS BEEN REASSEMBLED AND TESTING HAS BEEN COMPLETED.

89-3 LAUSE: POWER REDUCTION DUE TO MAIN FEEDWATER PUMP "A" TAKEN OUT OF SERVICE FOR INSPECTION AND TESTING.

CORRECTIVE ACTION:

POWER INCREASE AFTER HAIN FEEDWATER PUMP "A" INSPECTED AND TESTED.

E24

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-425 DATE:

MAR 5, 1989 UNIT NAME:

V0GTLE UNIT 2 COMPLETED BY: R. A. M0YE TELEPHONE:

(404) 724-8114 x3212 REPORT MONTH FEB 89 l

R M

5 E

E Y

T A

T LICENSEE SC Y

S H

EVENT T0 COMPONENT CAUSE & CORRECTIVE P

DURATION 0

0 REPORT ED CODE ACTION TO NO.

DATE E

(HOURS)

N D

NUMBER ME (SUBCODE)

PREVENT RECURRENCE NONE F: FORCED REASON:

METHOD:

EVENTS REPORTED INVOLVE 1 - MANUAL A GREATER THAN 20%

A-EQUIPMENT FAILURE (EXPLAIN) 2 - MANUAL SCRAM S: SCHEDULED B-MAINTENANCE OR TEST REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. 3 CRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEEDING 24 HOURS.

E-0PERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-0THER (EXPLAIN)

E3-4 l