.. Telephone (412) 393-6000 Nuclear Group O $n$,rt.PA pp 15077-0004 July 10, 1989 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operatirn Report U. S. Nuclear Regulatory Cammission W w nt Control Desk Washington, D.C.

20555

. Gentlemen:

In acconlance with Appendix A,

'Ibchnical Specifications, the Monthly.

Operating Report is submitted for Unit 1 and Unit 2 for the month of June, 1989.

Very truly yours, AM

. D. Sieber Vice President Nuclear Group 1M1 Enclosures cc: NRC Regional Office King of Prussia, PA l

8907190003 890630 PDR ADOCK 05000334

{d2.,y

\\

R PDC lfg u--_----.---

t 1%RRATIVE SGtRRY OF ENIHLY OPERATING EXPERIINCE UNIT I JUNE 1989 June 1

'Ihe Unit operated at 90% output to load follow.

thrm #1 June 2 June 3 At 0015 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> the Unit's output was rM_M to 30% to permit maintenance on the 'B' Main Feedwater Flow Contrcl Valve and-the

'B' First Point Feedwater Heater.

June 4 At 0906 hours0.0105 days <br />0.252 hours <br />0.0015 weeks <br />3.44733e-4 months <br />, the Unit's output was incrmmi to 50% output to load follow.

June 5 At 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> the Unit's output was increased to 90% to load follw.

June 6

'Ihe UAit operated at 90% output to load follow.

thrmgh June 9 June 10 At 0005 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> the Unit's output was rdM to 50% to load follow.

June 11

'Ibe Unit operated at 50% output to load follow..

June 12 At 0315 hours0.00365 days <br />0.0875 hours <br />5.208333e-4 weeks <br />1.198575e-4 months <br /> the Iktit's output was inctvased to 90% to load follow.

June 13

'Ihe Unit operated at 90% output to load follow, through June 23 June 24 At 0009 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> the Unit's output was rMM to 50% to load follow.

June 25

'Ihe Unit operated at 50% output to load follow.

June 26 At 0322 hours0.00373 days <br />0.0894 hours <br />5.324074e-4 weeks <br />1.22521e-4 months <br /> the Unit's output was increased to 90% to load follow.

At 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br /> the Unit's output was increased to a nominal value of 100% output, June 27

'Ihe Unit operated at 100% output.

through June 30 1

_ _ = - - _

p..

, c.

AVERNE DAILY INIT IUWER LEVEL I ;;

Docket No. 50-334 Unit BVPS Unit 1 l.

Date July 10. 1989 Cm pleted by M. A. Winaer Telephone (412)393-7621 MNIH June 1989 IRY AVERNE DAILY POWER IEVEL DAY

~ AVERAGE DAILY-l POWER IEVEL (We-Net)

(We-Net)-

1 700 17 713" 2

704' 18 704

~3 221 19 704

4 267 20 704 5

621 21 700 6

704 22 700 7

696 23 696 8

704 24 333 9

708 25 292 10 342 26 641' 11 329 27 767 12 625 28 788 13 696 29 792 14 704 30 792 15 708 31 N/A 16 703 INSIYCCTIONS On this format, list the averacyt daily unit power level in We-Net for each day in the reporting nanth. Ctspute to the nearest whole megawatt.

t d

t t

i ne F

1oe 1

1 s

1 0

F 0

0 t )

9 2

9 e 9

9 eR 1 8 6

e e

ct eE

  1. 9 r7 v

c mnn m

m hL 1 e-i n

oai o

o S(

it n3 t

e r no r

r r

.n9 cor f ep f

f oyt n0i3 et r t

f r r 4U1 W r

u dnt d

d t o 3

)

rnc eis e

e snp 3S y 2

ooe c ar c.

c.

nE e e

- Pl A. 1 CiR J mi uw uw o

R c

4 t

d f

do do e

r 0V u 5SJ M(

&ct et el el it t t u

A n r i 'B o

o uDe S

rl rl can o

e e

m s

v t r tf tf r

v ue'

. eeye u

e r

u u

tf E e

omt B n a

r ppee pd pd so m

N aa o

c P

l t

t a t a n

e.

e t

NDdh uoA e uo uo ne)

S t

ep ot e

ol ot I

- os1 ki el s% V. H Gin 6

t t e I

so so t e 1 cn l e 0

r t

t t ac 0 D

m i't 1 R.

oU pT e

't

't i ri G it t

i%

i%

bel E b

F.

o n o a

n0 n0 i p R

C Ut M w U5 U5 h er J

ih a

xr o t

x EPf (

E 4

5 tn e5 X

Z Z

ne E

Z Z

od V

Z Z

po L

Z Z

uC A

Z Z

o V

Z Z

C h

tno ne4 M

t e N

Z Z

s sd C

Z Z

u yo o

SC S

iv N

e 0

nr t

aP i

r C

m cm U

e a S o D

e r

r E

st t c cf n R

9 nnr A

A A

S i

o 8

eeo

/

/

/

t.i R

9 cvp N

N N

ll adt E

1 iE e

e e m

cr o 't & h W

L R

duu e

O E

onn t n P

N h aa uoet U

t MM ACRO D

J e-N M1 23459 A

H 3

3 S

T r

N N

f o

W O

ogt O

M nc D

di e T

T ot e 5

5 5

U R

htR N

O t u S

P eh n E

MS w T

I R

o D

a N

m U

m E

)

e

)

n s

in 2

i e

tp n

n a

e o

c s

B N

N lp ni a

m oL m

e E

it&

(E R

( t s c

ee ig r

rT rn o

u ti r) t r snern io eivEi n

e R ai e

io)

F e rtl l s

c yT aap t r t ngr rnu au 0

0 O

nanort oE ro enit osi(

uN mel ati t D(

pt el anar ninuurire o pi f gem eh s

e e e pd p t aCMRRoAoO e-RABCDEFGH l

e 2

p S

S S

y T

3 0

4 e

0 16 6

2 t

6 a

0 0

0 D

9 9

9 d

8 8

8 e

d t J

ed ce rh oc 0

1 2

F S o

3 3

3 N

F S 1

i v

OPERATING DATA REPORT DOCKET NO.:

50-334 REPORT DATE: 07/10/89 COMPLETED BY: M.A.WINGER TELEPHONE:

(412) 393-7621 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: JUNE 1989 l
3. LICENSED THERMAL POWER (MWt):

2660

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

835

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

860

7. MAX. DEPENDABLE CAPACITY (Net MWe):

810

8. IF CHANGES. OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF A!U (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

720.0 4343.0 115415.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

720.0 4228.7 70479.6

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 4482.8

14. HOURS GENERATOR WAS ON LINE:

720.0 4212.3 68856.3

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

1542116.0 8840908.9 162187266.5

17. GROSS ELECT. ENERGY GEN. (MWH):

'483910.0 2836070.0 52029409.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

450150.0 2647890.0 48556280.0

19. UNIT SERVICE FACTOR:-(PERCENT) 100.0 97.0 62.0 20.-UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 97.0 62.0
21. UNIT CAPACITY FACTOR (MDC): PCT 77.2 75.3 55.1
22. UNIT CAPACITY FACTOR (DER): PCT 74.9 73.0

.53.4

23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 3.0 17.4
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE DATE,AND DURATION OF EACH):

UNIT'S SEVENTH REFUELING OUTAGE IS SCHEDULED TO BEGIN ON SEPTEMBER 1.1989 AND TO END ON NOVEMBER 10.1989.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

1 FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

g.m

'4
1:

'~

jp

  • m l p-

-c 7

NARRATIVE SL396UW. OF ~

w KNIHuf OPERATDG EXPERIENCE UNIT II=

JUNE '1989-

' June-1 The Unit entered the month in' Mode 5, to' perform maintenance on the

'A Ioap RID. Manifold. :

At 2116 hours0.0245 days <br />0.588 hours <br />0.0035 weeks <br />8.05138e-4 months <br />, the Unit?

entered Mode 4.

June 2

- At 0203 hCFn w the Unit entered Mode 3.: At 2250 hours0.026 days <br />0.625 hours <br />0.00372 weeks <br />8.56125e-4 months <br />, the I-&Cuu was ta'fari critical.

_ June 3 At 0417, the Unit was syidnuaized and the Unit's output was 1@ ' up at apprtodnately 3% per hour.- At 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />,'the-power ascension was haltad at 30% output to permit tarbine stretcts testing and core flux mapping.

June 4'

' At ' 2050' hours, the Unit's output was ranged Lup at wwdmately 3% per hour.

June 5 At 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br />, the power aeoansion was' haltad when the Unit's a*=*

was--50% to. permit steamVfeed flow mismatcts testing.-

. At 0915 hours0.0106 days <br />0.254 hours <br />0.00151 weeks <br />3.481575e-4 months <br />, the Unit's output was ranged up at wwdmately~ 3% per hour.. -At 2130. hours,,the power aeoansics) was haltad with tLe Unit' at' 73% m*=*

to permit

-core flux mapping.

June 6 The Unit operated at'73% output to ' permit oore flux mapping.-

June 7

'At 1010 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.84305e-4 months <br />, the Unit's output was, ramped dcun to 30% to permit. locating and isolation a RCS Imak.. At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the.

Unit's m*=* was ranped up at 3% per hour.

' June 8

. '!he Unit operated ;at Mad cutput in. a fuelL pr -oonditiening made.

June 9 At 0840 hours0.00972 days <br />0.233 hours <br />0.00139 weeks <br />3.1962e-4 months <br />, the Unit acheived 100% output.

June 10 The Unit operated at a naminal value of '100% cutput.

through June 20-.

l June 21 At 2140 hours0.0248 days <br />0.594 hours <br />0.00354 weeks <br />8.1427e-4 months <br />, the Unit's output was ramped down after detectics) of a Primary to Secondary Isak in the 'C' Steam Generator.

At 2240 hours0.0259 days <br />0.622 hours <br />0.0037 weeks <br />8.5232e-4 months <br />, the Unit was removed from service. At 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, the reactor was manually shutdown.

June 22 At 1905 hours0.022 days <br />0.529 hours <br />0.00315 weeks <br />7.248525e-4 months <br />, the Unit entered Mode 4.

.)

June 23 At 0908 hours0.0105 days <br />0.252 hours <br />0.0015 weeks <br />3.45494e-4 months <br />, the Unit entered Mode 5.

i

June 24 The Unit remained in Mode 5 to repair a Primary to Secondary through Isak in the

'C' Steam generator.

. June 30 L_-

a

l - -

J

'+,

' AVERAGE IRILY UNIT POWER IEVEL Docket No. 50-412 Unit BVPS Unit 2 l

Date July 10. 1989 Capleted by M. A. Wirner Telephone (412)393-7621 l.

ENIH June 1932_.

l DAY AVERAGE IRILY POWER IEVEL IRY AVERAGE IRIIX 10WER IEVEL (We-Net)

(We-Net) 1 0-17 802 2

0 18 794 3

121 19 795 4

186 20 790 5

453 21 732 6

592 22 0

7 348 23 0

8 539 24 0

9 786 25 0

10 806 26 0

11 802 27 0

12 802 28 0

13 790 29 0

14 790 30 0

15' 798 31 N/A 16 794 INSIRICI' IONS On this format, list the average daily smit NWer level in We-Net for each day in the r%i.ing month. Ctmpute to the nearest whole negawatt.

l1

1 ll

,l!

1l ll

,l]I.!I!lIiId1 lif i) 11]IlI1A J

~

~

k t

' o -

^

~

I

^

~

t

_ k.

e u

o er l

p t

oeo

.i t

tLt F

g u

%S a

s 9

2 m -

n o 3C~

ryr t) 1 e

7R ere eR T-28 6

e e rD i Kn wan eE n

59 r 7 v

c of o

0i mf ode hL 1

e-i n fR ri 3b oo png S(

n3 t

e r

et r

r o

r it

. n9 or ep ti t u f n 1cm oyt n0 i

3 nt r po fd et o

0ea f rr 4

U1 W

i u o

en di 0Se t o 3

)

nc aL o

dd et 1

t snp

.2 moe t

nc en xe oS nee e

3 S

y P

l A.

1 CiR oe t a mt o

R c

n 'A d ;o 0

V u 4

t r

l

.. 5 O J

t

(

&ct w'

it p eg.

es ryC tt t u

o 5

i e r

i An o

a hng ri f r' can o

e e

dn rl n

a uDe S

s v

t o ee ipi tt ms r

v wpt s

eeye u e u

pu e

ui ni omtBn a

.r he of

- ms pn o r 't tfE e

so m

Naa o

C P

sc pee t n dPi n e.

a N D 'e r.

sad er ex op uei n.

ri s

t ue t

i ne)

S s

g k

I t

- os1 et t a nnl wl ruh k1 el ueo ol l c so

_h Cin6 I

sre t e1 c1 l e tf pe rf t t.

h t ac0 t

o1 gT.

it ni u

e e

't k

tiat iriG 4

i D

in uf urr i1e ip bald ib o

naa oe oot n0e nen p

i C

UmM L r Pf s U3l UrI heru h

xrom x

EPf(

E 4

5 tn e5 U~

Z Z

S M

ne R

Z Z

E C

od T

Z Z

V

- M po S

Z Z

L

- E mC N

Z Z

A T

o I

Z Z

V H

C htno m

M e4

. t e A

Z Z

8 8

.s sd I

Z Z

C C

u yo o

St s

iv u

e o

mr I

aP T

r C

mcm U

e #

aSo D

e 9

r r

E stt 1

ccf n

. R 9

nnr A'

A A

A Si o

8 eeo

/

/

/

/

9 t.i

. R 9

cvp N

N N

N 8

Ll adt 1

iEe E

dhau't em cr' b

L R

2 ua ue' 0

E o

nt ndh P

N h

oet' U

t MACRO D

J e

N Mt23459' A

H 3

3 S

T.

r N

N f.

o W

O ogt O

M nc D

dia T

T ot e 4

5 5

5 1

U R

htR H

O t u S

P eh n E

MSu T

R o

D m

I M

a L

x E

)

e

)

n s

n 2

i e a n i n

a e

l c

l s

8 N

8 A

5 p

ni p

e m

oL m

e E

i E

R

( t t&

(

s c

ee ig r

rT rn o u

ti r) t r snern io eivEi n

e R ai a

o)

F e rtll i s 3 ~

3 c

yT aap t r t ngr rnm eu 2

0 0

0 7

nanort oE ro 5

1 enit osi(

uN 2

m el ati t pt el enar D(

ninua rire ouif gemeh e

M R R )d p t sqeee aE G

OO A

RA8CDEFGH le 2

p F

S S

F F

y T

1 3

3 7

1 e

0 0

0 0

2 t

6 6

6 6

6 a

0 0

0 0

0 D

9 9

9 9

9 d

3 8

8 8

8 e

t d&

ece rh oc 5

6 7

8 9

FS o

1 1

1 1

1 N

FS 1

llll illl

i' O

p OPERATING DATA REPORT DOCKET NO.;

50-412 REPORT DATE:

07/10/89 COMPLETED BY: M.A.WINGER TELEPHONE:

(412) 393-7621 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2.

Notes

2. REPORTING PERIOD: JUNE 1989
3. LICENSED THERMAL POWER (MWt):

2660

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

836

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

885

7. MAX. DEPENDABLE CAPACITY (Net MWe):

833

8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

720.0 4343.0 14198.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

456.2 2196.7 11446.0

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR WAS ON LINE:

450.4 2144.7 11324.0

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

1009593.0 4518330.0 28249270.4

17. GROSS ELECT. ENERGY GEN. (MWH):

319500.0 1430200.0 9060000.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

296410.0 1316615.0 8531780.0

19. UNIT SERVICE FACTOR: (PERCENT) 62.6 49.4 79.8
20. UNIT AVAILABILITY FACTOR:(PERCENT) 62.6 49.4 79.8
21. UNIT CAPACITY FACTOR (MDC): PCT 49.4 36.4 72.1
22. UNIT CAPACITY FACTOR (DER): PCT 49.2 36.3 71.9
23. UNIT FORCED OUTAGE RATE: (PERCENT) 37.4 17.8 5.0
24. SHUTDPWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A