ML20246L830
| ML20246L830 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 06/30/1989 |
| From: | Sieber J, Winger M DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8907190008 | |
| Download: ML20246L830 (9) | |
Text
. _ _ _ - -
. i:
7%
4
.. Telephone (412) 393-6000 Nuclear Group O $n$,rt.PA pp 15077-0004 July 10, 1989 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operatirn Report U. S. Nuclear Regulatory Cammission W w nt Control Desk Washington, D.C.
20555
. Gentlemen:
In acconlance with Appendix A,
'Ibchnical Specifications, the Monthly.
Operating Report is submitted for Unit 1 and Unit 2 for the month of June, 1989.
Very truly yours, AM
. D. Sieber Vice President Nuclear Group 1M1 Enclosures cc: NRC Regional Office King of Prussia, PA l
8907190003 890630 PDR ADOCK 05000334
{d2.,y
\\
R PDC lfg u--_----.---
t 1%RRATIVE SGtRRY OF ENIHLY OPERATING EXPERIINCE UNIT I JUNE 1989 June 1
'Ihe Unit operated at 90% output to load follow.
thrm #1 June 2 June 3 At 0015 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> the Unit's output was rM_M to 30% to permit maintenance on the 'B' Main Feedwater Flow Contrcl Valve and-the
'B' First Point Feedwater Heater.
June 4 At 0906 hours0.0105 days <br />0.252 hours <br />0.0015 weeks <br />3.44733e-4 months <br />, the Unit's output was incrmmi to 50% output to load follow.
June 5 At 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> the Unit's output was increased to 90% to load follw.
June 6
'Ihe UAit operated at 90% output to load follow.
thrmgh June 9 June 10 At 0005 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> the Unit's output was rdM to 50% to load follow.
June 11
'Ibe Unit operated at 50% output to load follow..
June 12 At 0315 hours0.00365 days <br />0.0875 hours <br />5.208333e-4 weeks <br />1.198575e-4 months <br /> the Iktit's output was inctvased to 90% to load follow.
June 13
'Ihe Unit operated at 90% output to load follow, through June 23 June 24 At 0009 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> the Unit's output was rMM to 50% to load follow.
June 25
'Ihe Unit operated at 50% output to load follow.
June 26 At 0322 hours0.00373 days <br />0.0894 hours <br />5.324074e-4 weeks <br />1.22521e-4 months <br /> the Unit's output was increased to 90% to load follow.
At 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br /> the Unit's output was increased to a nominal value of 100% output, June 27
'Ihe Unit operated at 100% output.
through June 30 1
_ _ = - - _
p..
, c.
AVERNE DAILY INIT IUWER LEVEL I ;;
Docket No. 50-334 Unit BVPS Unit 1 l.
Date July 10. 1989 Cm pleted by M. A. Winaer Telephone (412)393-7621 MNIH June 1989 IRY AVERNE DAILY POWER IEVEL DAY
~ AVERAGE DAILY-l POWER IEVEL (We-Net)
(We-Net)-
1 700 17 713" 2
704' 18 704
~3 221 19 704
- 4 267 20 704 5
621 21 700 6
704 22 700 7
696 23 696 8
704 24 333 9
708 25 292 10 342 26 641' 11 329 27 767 12 625 28 788 13 696 29 792 14 704 30 792 15 708 31 N/A 16 703 INSIYCCTIONS On this format, list the averacyt daily unit power level in We-Net for each day in the reporting nanth. Ctspute to the nearest whole megawatt.
t d
t t
i ne F
1oe 1
1 s
1 0
F 0
0 t )
9 2
9 e 9
9 eR 1 8 6
e e
ct eE
- 9 r7 v
c mnn m
m hL 1 e-i n
oai o
o S(
it n3 t
e r no r
r r
.n9 cor f ep f
f oyt n0i3 et r t
f r r 4U1 W r
u dnt d
d t o 3
)
rnc eis e
e snp 3S y 2
ooe c ar c.
c.
nE e e
- Pl A. 1 CiR J mi uw uw o
R c
4 t
d f
do do e
r 0V u 5SJ M(
&ct et el el it t t u
A n r i 'B o
o uDe S
rl rl can o
e e
m s
v t r tf tf r
v ue'
. eeye u
e r
u u
tf E e
omt B n a
r ppee pd pd so m
N aa o
c P
l t
t a t a n
e.
e t
NDdh uoA e uo uo ne)
S t
ep ot e
ol ot I
- os1 ki el s% V. H Gin 6
- t t e I
so so t e 1 cn l e 0
r t
t t ac 0 D
m i't 1 R.
oU pT e
't
't i ri G it t
i%
i%
bel E b
F.
o n o a
n0 n0 i p R
C Ut M w U5 U5 h er J
ih a
xr o t
x EPf (
E 4
5 tn e5 X
Z Z
ne E
Z Z
od V
Z Z
po L
Z Z
uC A
Z Z
o V
Z Z
C h
tno ne4 M
t e N
Z Z
s sd C
Z Z
u yo o
SC S
iv N
e 0
nr t
aP i
r C
m cm U
e a S o D
e r
r E
st t c cf n R
9 nnr A
A A
S i
o 8
eeo
/
/
/
t.i R
9 cvp N
N N
ll adt E
1 iE e
- e e m
cr o 't & h W
L R
duu e
O E
onn t n P
N h aa uoet U
t MM ACRO D
J e-N M1 23459 A
H 3
3 S
T r
N N
f o
W O
ogt O
M nc D
di e T
T ot e 5
5 5
U R
htR N
O t u S
P eh n E
MS w T
I R
o D
a N
m U
m E
)
e
)
n s
in 2
i e
tp n
n a
e o
c s
B N
N lp ni a
m oL m
e E
it&
(E R
( t s c
ee ig r
rT rn o
u ti r) t r snern io eivEi n
e R ai e
io)
F e rtl l s
c yT aap t r t ngr rnu au 0
0 O
nanort oE ro enit osi(
uN mel ati t D(
- pt el anar ninuurire o pi f gem eh s
e e e pd p t aCMRRoAoO e-RABCDEFGH l
e 2
p S
S S
y T
3 0
4 e
0 16 6
2 t
6 a
0 0
0 D
9 9
9 d
8 8
8 e
d t J
ed ce rh oc 0
1 2
F S o
3 3
3 N
F S 1
i v
OPERATING DATA REPORT DOCKET NO.:
50-334 REPORT DATE: 07/10/89 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 393-7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: JUNE 1989 l
- 3. LICENSED THERMAL POWER (MWt):
2660
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANGES. OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF A!U (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
720.0 4343.0 115415.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
720.0 4228.7 70479.6
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
720.0 4212.3 68856.3
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1542116.0 8840908.9 162187266.5
- 17. GROSS ELECT. ENERGY GEN. (MWH):
'483910.0 2836070.0 52029409.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
450150.0 2647890.0 48556280.0
- 19. UNIT SERVICE FACTOR:-(PERCENT) 100.0 97.0 62.0 20.-UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 97.0 62.0
- 22. UNIT CAPACITY FACTOR (DER): PCT 74.9 73.0
.53.4
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 3.0 17.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE DATE,AND DURATION OF EACH):
UNIT'S SEVENTH REFUELING OUTAGE IS SCHEDULED TO BEGIN ON SEPTEMBER 1.1989 AND TO END ON NOVEMBER 10.1989.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
1 FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
g.m
- '4
- 1:
'~
jp
- m l p-
-c 7
NARRATIVE SL396UW. OF ~
w KNIHuf OPERATDG EXPERIENCE UNIT II=
JUNE '1989-
' June-1 The Unit entered the month in' Mode 5, to' perform maintenance on the
'A Ioap RID. Manifold. :
At 2116 hours0.0245 days <br />0.588 hours <br />0.0035 weeks <br />8.05138e-4 months <br />, the Unit?
entered Mode 4.
June 2
- At 0203 hCFn w the Unit entered Mode 3.: At 2250 hours0.026 days <br />0.625 hours <br />0.00372 weeks <br />8.56125e-4 months <br />, the I-&Cuu was ta'fari critical.
_ June 3 At 0417, the Unit was syidnuaized and the Unit's output was 1@ ' up at apprtodnately 3% per hour.- At 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />,'the-power ascension was haltad at 30% output to permit tarbine stretcts testing and core flux mapping.
June 4'
' At ' 2050' hours, the Unit's output was ranged Lup at wwdmately 3% per hour.
June 5 At 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br />, the power aeoansion was' haltad when the Unit's a*=*
was--50% to. permit steamVfeed flow mismatcts testing.-
. At 0915 hours0.0106 days <br />0.254 hours <br />0.00151 weeks <br />3.481575e-4 months <br />, the Unit's output was ranged up at wwdmately~ 3% per hour.. -At 2130. hours,,the power aeoansics) was haltad with tLe Unit' at' 73% m*=*
to permit
-core flux mapping.
June 6 The Unit operated at'73% output to ' permit oore flux mapping.-
June 7
'At 1010 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.84305e-4 months <br />, the Unit's output was, ramped dcun to 30% to permit. locating and isolation a RCS Imak.. At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the.
Unit's m*=* was ranped up at 3% per hour.
' June 8
. '!he Unit operated ;at Mad cutput in. a fuelL pr -oonditiening made.
June 9 At 0840 hours0.00972 days <br />0.233 hours <br />0.00139 weeks <br />3.1962e-4 months <br />, the Unit acheived 100% output.
June 10 The Unit operated at a naminal value of '100% cutput.
through June 20-.
l June 21 At 2140 hours0.0248 days <br />0.594 hours <br />0.00354 weeks <br />8.1427e-4 months <br />, the Unit's output was ramped down after detectics) of a Primary to Secondary Isak in the 'C' Steam Generator.
At 2240 hours0.0259 days <br />0.622 hours <br />0.0037 weeks <br />8.5232e-4 months <br />, the Unit was removed from service. At 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, the reactor was manually shutdown.
June 22 At 1905 hours0.022 days <br />0.529 hours <br />0.00315 weeks <br />7.248525e-4 months <br />, the Unit entered Mode 4.
.)
June 23 At 0908 hours0.0105 days <br />0.252 hours <br />0.0015 weeks <br />3.45494e-4 months <br />, the Unit entered Mode 5.
i
- June 24 The Unit remained in Mode 5 to repair a Primary to Secondary through Isak in the
'C' Steam generator.
. June 30 L_-
a
l - -
J
'+,
' AVERAGE IRILY UNIT POWER IEVEL Docket No. 50-412 Unit BVPS Unit 2 l
Date July 10. 1989 Capleted by M. A. Wirner Telephone (412)393-7621 l.
ENIH June 1932_.
l DAY AVERAGE IRILY POWER IEVEL IRY AVERAGE IRIIX 10WER IEVEL (We-Net)
(We-Net) 1 0-17 802 2
0 18 794 3
121 19 795 4
186 20 790 5
453 21 732 6
592 22 0
7 348 23 0
8 539 24 0
9 786 25 0
10 806 26 0
11 802 27 0
12 802 28 0
13 790 29 0
14 790 30 0
15' 798 31 N/A 16 794 INSIRICI' IONS On this format, list the average daily smit NWer level in We-Net for each day in the r%i.ing month. Ctmpute to the nearest whole negawatt.
l1
- 1 ll
,l!
1l ll
,l]I.!I!lIiId1 lif i) 11]IlI1A J
~
~
k t
' o -
^
~
I
^
~
t
_ k.
e u
o er l
p t
oeo
.i t
tLt F
g u
%S a
s 9
2 m -
n o 3C~
ryr t) 1 e
7R ere eR T-28 6
e e rD i Kn wan eE n
59 r 7 v
c of o
0i mf ode hL 1
e-i n fR ri 3b oo png S(
n3 t
e r
et r
r o
r it
. n9 or ep ti t u f n 1cm oyt n0 i
3 nt r po fd et o
0ea f rr 4
U1 W
i u o
en di 0Se t o 3
)
nc aL o
dd et 1
t snp
.2 moe t
nc en xe oS nee e
3 S
y P
l A.
1 CiR oe t a mt o
R c
n 'A d ;o 0
V u 4
t r
l
.. 5 O J
t
(
&ct w'
it p eg.
es ryC tt t u
o 5
i e r
i An o
a hng ri f r' can o
e e
dn rl n
a uDe S
s v
t o ee ipi tt ms r
v wpt s
eeye u e u
pu e
ui ni omtBn a
.r he of
- ms pn o r 't tfE e
so m
Naa o
C P
sc pee t n dPi n e.
a N D 'e r.
sad er ex op uei n.
ri s
t ue t
i ne)
S s
g k
I t
- os1 et t a nnl wl ruh k1 el ueo ol l c so
_h Cin6 I
sre t e1 c1 l e tf pe rf t t.
h t ac0 t
o1 gT.
it ni u
e e
't k
tiat iriG 4
i D
in uf urr i1e ip bald ib o
naa oe oot n0e nen p
i C
UmM L r Pf s U3l UrI heru h
xrom x
EPf(
E 4
5 tn e5 U~
Z Z
S M
ne R
Z Z
E C
od T
Z Z
V
- M po S
Z Z
L
- E mC N
Z Z
A T
o I
Z Z
V H
C htno m
M e4
. t e A
Z Z
8 8
.s sd I
Z Z
C C
u yo o
St s
iv u
e o
mr I
aP T
r C
mcm U
e #
aSo D
e 9
r r
E stt 1
ccf n
. R 9
nnr A'
A A
A Si o
8 eeo
/
/
/
/
9 t.i
. R 9
cvp N
N N
N 8
Ll adt 1
iEe E
dhau't em cr' b
L R
2 ua ue' 0
E o
nt ndh P
N h
oet' U
t MACRO D
J e
N Mt23459' A
H 3
3 S
T.
r N
N f.
o W
O ogt O
M nc D
dia T
T ot e 4
5 5
5 1
U R
htR H
O t u S
P eh n E
MSu T
R o
D m
I M
a L
x E
)
e
)
n s
n 2
i e a n i n
a e
l c
l s
8 N
8 A
5 p
ni p
e m
oL m
e E
i E
R
( t t&
(
s c
ee ig r
rT rn o u
ti r) t r snern io eivEi n
e R ai a
o)
F e rtll i s 3 ~
3 c
yT aap t r t ngr rnm eu 2
0 0
0 7
nanort oE ro 5
1 enit osi(
uN 2
m el ati t pt el enar D(
ninua rire ouif gemeh e
M R R )d p t sqeee aE G
OO A
RA8CDEFGH le 2
p F
S S
F F
y T
1 3
3 7
1 e
0 0
0 0
2 t
6 6
6 6
6 a
0 0
0 0
0 D
9 9
9 9
9 d
3 8
8 8
8 e
t d&
ece rh oc 5
6 7
8 9
FS o
1 1
1 1
1 N
FS 1
llll illl
i' O
p OPERATING DATA REPORT DOCKET NO.;
50-412 REPORT DATE:
07/10/89 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 393-7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2.
Notes
- 2. REPORTING PERIOD: JUNE 1989
- 3. LICENSED THERMAL POWER (MWt):
2660
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
885
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
833
- 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
720.0 4343.0 14198.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
456.2 2196.7 11446.0
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE:
450.4 2144.7 11324.0
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1009593.0 4518330.0 28249270.4
- 17. GROSS ELECT. ENERGY GEN. (MWH):
319500.0 1430200.0 9060000.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
296410.0 1316615.0 8531780.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 62.6 49.4 79.8
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 62.6 49.4 79.8
- 22. UNIT CAPACITY FACTOR (DER): PCT 49.2 36.3 71.9
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 37.4 17.8 5.0
- 24. SHUTDPWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
_ _ _ _ - _ _ _ _ - _ _ _ -