Monthly Operating Rept for June 1989 for Millstone Unit 2.W/
ML20246L750
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/30/1989
From: Neron G, Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MP-13288, NUDOCS 8907180506
Download: ML20246L750 (5)


Text

mw MbETHEAST UTILETIES

~

o.nor.i Ome... s.io.n sir..t. 8.rnn. Conn cticui 1

. w m a.c.e c,:aee w c

  • P.O. BOX 270 5

] [om [.c [,, 1 7 ",. "

.l H ARTFORD. CONNECTICUT 06141-0270 k

(203) 665 5000 mw o.co.

1 July 10, 1989 I

MP-13288

)

Re:

10CFR50.71(a)

U.S. Nuclear Regulatory Commission Document Control Desk Vashington, D. C. 20555

Reference:

Facility Operating License No. DPR-65 Docket No. 50-336

Dear Sir:

.This letter is forwarded to provide the report of operating and shutdown experience relating to Millstone Unit 2 Monthly Operating Rep 6rt 89-06 in accordance with Appendix A Technical Specifications, Section 6.9.1.6.

One additional copy of the report is enclosed.

Very truly yours, NORTHEAST NUCLEAR ENFRGY COMPANY s

i N St en

. Scace Station Superintendent Millstone Nuclear Power Station a

SES/GN:dlr ec: V. T. Russell, Region I Administrator G. S. Vising, NRC Project Manager, 54illstone Unit No. 2 W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1, 2 & 3 l

1 l

i l

8907190506 890630 PDR ADOCK 05000336 f$Af l

L 2]l

f OPERATING DATA FCPORT DOCKET NO.

50-336 DATE 7/10/89 COMPLETED BY G. Neron TELEPHONE (203) 447-1791 Extension 4417 OPERATING STATUS 1.

Unit Name: Millstone Unit 2 Notes: Items 21 and 22 cumulative 2.

Reporting Period: June 1989 are weighted averages. Unit

,3.

Licensed Thermal Power (MWt): 2700 operated at 2560 MW thermal prior 4..

Nameplate ' Rating (Gross MWe): 909 to its uprating tv the current

.5.

Design Electrical Rating (Net MWe): 870 2700 MW thermal power level.

6.

Maximum Dependable Capacity (Gross MWe):893.88 7.

Maximum Dependable Capacity. (Net MWe): 8I2.88

8.

If Changes Occur in C;.pcity Ratings (Items Number 3 Through 7) 4 Since Last Report, Give Reasons: N/A

'9.

Power Level to Which Restricted, If Any (liet MWe): N/A 10.

Reasons For Restrictions, If Any: N/A This Month Year to Date Cumulative

11.. Hours In Reporting Pericci 720 _

4,343 118,463' 12.

Number Of Hears Reactor Was Critical 720.0 2,386.4 86,719.8

'13.

Reactor Reserve Shutdown Hours 0

0 2205.5

14. ' Hours General On-Line 720.0 2,271.6 82,337.0

~

15. Unit Reserve Shutdown Hours 0

0 468.2 16.

Gross 'Inermal Energy Generated (MWH) 1,938,383.0 5,984,553.0 228,635,833.0

17.. Gross Elec. Energy Generated (MWH) 641,256.0 1,962,931.5 68,793,452.0
18. Net Electrical Energy Generated (MXH) 619,048.0 1,877,394.5 65,986,541.0 19.

Unit Service Factor 100.0 52.3 69.5

20. Unit Availability Factor 100.0 52.3 69.9
21. ' Unit Capacity Factor (Using MDC Net) 99.6 50.1 65.6 22.

Unit Capacity Factor (Using DER Net) 98.8 49.7 64.6 23.

Unit Forced Outace Rate

~'

O.0 0.0 14.4 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Eddy Current Examination of Steam Generator Tubes: October 28, 1989: Approximate 1v 4-5 weeks 25.

If Shutdown at End of Report Period, Estimated Date of S*,artup:

i N/A

26. Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A I

COMMERCIAL OPERATION

~

N/A N/A I

l 1

j 1

l 1

i e

_e-j

..VERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-336 1

UNIT Millstone 2 DATE 7/10/89 COMPLETED BY G. Neron' TELEPHONE- (203) 447-1791 Extension 4417-1 MONTH June 1919 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 863-17 862 2

861 18 863 3

794 19 862 4

84C 20 863 5

863 21 862 6

864 22-862 7

863 23 863 8

'863 24 863 9

863 25 863 10 864 26 862 11 864 27 862

- 12 863 28 862 13 863 29 862 14 863 30 862

- 15 862 31 16 863 INSTRUCTIONS l'

On-this format, list the average daily unit power level in MWe-Net for each day in the' reporting month. Computer tc the nearest whole megawatt.

l c

l

2 14 i

n i aei u

t e

tD cF o

e 7 n c - r c

i -

S

- n n4 o eor uf L)

- o9o4 i rt u ro R

e 6t gr - s r

c t

rE m

3 s/e) n one snoL a

3l 0 N3 e CoR nof(

S 1

- l 0t i

Ii

/

0i 2 x

& tt t st) 5 M7 G( E cn

- at r1 eAe reo6 1

.EEYE s

v G a e p1 OMTBN u

e A

ph e0 t

NAA O

a r

/

t eSR -

i NDDH C

P N

i r G

b T

EP bP ytE i

ET TE i

rnR h

KI EL h rt eU x

CN LE xonvN E

O U.

PT EfEE(

5 D

M t

d O

n C

e5 ne A

od

/

po N

mC o

m n

)

C amh o) n roti0i mcrnt a

aSf oc=l m8 r

mu p

ee ccd d nx td A

Si eseoE so

/

t uuRi(

S yC N

ll ano t

aamiirar N

S O

duuot ver e I

onnt newuh T

h aauoroDt C

tMMACpP( O U

e - - - -

M1234 5

6 D

e I

E 9

e 3

R 8

stt 9

nnr A

R 1

eeo

/

E cvp N

n W

e i E e o

O n

L R

i P

u t

J 3

a D

r n

N H

f o

i A

T o gt m

N nc A

a S

O dia

/

x N

M ot e N

E W

htR O

T t u e

)

)

D R

eh n n

s n

T O

MS w i

n i

U P

o a

e a

H E

D l

c l

S R

p ni p

x oL x

T 2

E i

E I

n A

t t&

(

(

N o

/

s c

U s

N ee i g r

a rT rn o

e u

ti r)

R l r snef n i o eivEi a

R ai a

F e rtll n

c yT a a p o) t ngr rnx i s A

nanort oE t r

/

enit osi(

au N

mel ati t pt el anar ro uH ninuurire D(

ouif gemeh s q a e e pd pt aEMRROAOO e-l A

RABCDEFGH e

/

2 p

N y

T de l

e d u t

A ed a

/

ce D

N rh oc FS A

.o

/

FS N

N I

l~

l

e. + 's '-

. REFUELING INFORMATION REQUEST 1.

Name of facility: Millstone 2 2.

Scheduled date for next refueling shutdown: Aucust 1990-3.

Schedule date for restart following refueling:

N/A 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Not at this time 5.

Scheduled date(s) for submitting licensing action and supporting information:

l NONE-6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

l 1

Not at this time 7.

The number of fuel assemblies (a) in the core and 03) in the spent fuel storage pool:

(a)

In Core:

(a) 217 (b) 640 8.

The present licensed spent fuel pool storage capacity-and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Currently 1277 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1994, Spent Fuel Pool Full, core off load capacity is reached (without consolidation).

1998, Core Full, Spent Fuel Pool Full 2009, Spent Fuel Pool Full, core off load capacity is reached -

continoent upon full scale storace of consolidated fuel in the Spent Fuel Pool.