Notice of Issuance of Amends 42 & 41 to Licenses DPR-80 & DPR-82,respectively.Amends Change Tech Specs by Revising Surveillance Test Frequency of Turbine Stop Valves,Governor Valves & Intercept Valves Re Turbine Overspeed Protection
ML20246L131
Person / Time
Site: Diablo Canyon  
Issue date: 07/10/1989
From: Rood H
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20246K944 List:
References
NUDOCS 8907180350
Download: ML20246L131 (2)


Text

k.,

7590-01 1

UNITED STATES NUCLEAR REGULATORY COMMISSION l

4 PACIFIC GAS AND ELECTRIC COMPANY I

DOCKETS NOS. 50-275 AND 50-323 NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES The United States Nuclear Regulatory Comission (the Commission) has issued Amendments Nos. 42 and 4I to Facility Operating Licenses Nos. DPR-80 and DPR-82, issued to the Pacific Gas and Electric Company (the licensee),

which.revisedtheTechnicalSpecifications(TS)foroperationoftheDiablo Canyon Power Plant, Unit Nos. l'and 2, located in San Luis Obispo County, California. The amendments are effective as of the date of issuance.

The amendments change the Technical Specifications by revising the surveillance test frequency of the turbine stop valves, the governor valves and the intercept valves associated with the turbine overspeed protection.

The application for the amendment complier with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's regulations. The Comission has made appropriate findings, as required by the Act and the Comission's regulations in 10 CFR Chapter I, which are set forth in the license amendments.

Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Opportunity for Hearing in connection with this action was published in the FEDERAL REGISTER on May 18, 1988 (53 FR 17806). No request for hearing or petition to intervene was filed following this notice.

8907180350 890710 PDR ADOCK 05000275 P

PDL n

~

/

l

. ~t Also in connection with this action, the Connission prepared an-Environmental Assessment and Finding of No Significant Impact which was published in the FEDERAL REGISTER on May 4, 1989 at 54 FR 19263.

-Forfurtherdetailswithrespecttothisaction,see(1)theapplication for amendments dated January 22, 1988, as supplemented by letter dated May 15, 1989, (2) Amendments Nos. 42 and 41 to Licenses hos. DPR-80 and DPR-82, and (3)theCommission'srelatedSafetyEvaluation. All of these items are available for public inspection at the Commission's Public Document Room, 2120 L Street, NW., Washington, DC 20555, and at the California Polytechnic State University Library, Government Documents and Maps Department, San Luis Obispo, California 93407. A copy of items (2) and (3) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, DC 20555, Attention: Director, Division of Reactor Projects - III, IV, V and Special Projects.

th Dated at Rockville, Maryland, this

'0 day of July, 1989.

FOR THE NUCLEAR REGULATORY COMMISSION

'I Q J A

Harry Rood, Senior Project Manager Project Directorate V Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation J