ML20246K248

From kanterella
Jump to navigation Jump to search
Advises That Aecl Technologies 890713 Proposed Presentation on Technical Aspects of Candu 3 Reactor & Aecl Technologies Considered Premature,Per to Chairman Carr.Aecl Recommended to Work W/Nrc for Mutual Date & Forum
ML20246K248
Person / Time
Issue date: 07/10/1989
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Durante R
ATOMIC ENERGY OF CANADA, LTD.
Shared Package
ML20246K254 List:
References
PROJECT-679A NUDOCS 8907180113
Download: ML20246K248 (5)


Text

,

JUL 10 Iggg Mr. Raymond W. Durante Executive Consultant AECL Technologies 15400 Calhoun Dr., Suite 100 Rockville, MD 20855

Dear Mr. Durante:

Chairman Carr has requested that I respond to your letter dated June 25, 1989, concerning AECL Technologies' proposed presentation on July 13, 1989, at the Crowne Plaza Hotel on the technical aspects of the CANDU 3 reactor r id AECL Technologies' licensing plan.

I understand that individual Commisst.oners have contacted you regarding their availability to attend.

Although such a presentation could be useful, I believe that the timing of the proposed meeting is premature.

In the meantime I recommend that AECL Technologies work with the NRC staff in reaching a mutually agreeable date and forum for such a meeting.

T;m NRC staff program manager for the CANDU 3 Standard Design Certification is Drew Persinko, who will serve as the PRC point of contact for all matters relating to the CANDU 3 licensing project.

Sincerely, Original signed W IidoNe lo, Jr.

4 Executive Director for Operations DISTRIBUTION NRC PDR FGillespie Central Files HDenton PMAS:PTSB RDG EBeckjord,RES DPersinko JScinto, OGC TCox DMossburg (Green Ticket No. 0004586)

FMiraglia DCrutchfield VStello JPartlow JTaylor

.TMurley HThompson JSniezek JBlaha MBridgers (Green Ticket NO. 0004586)

(DEARDURANTE)

RMc0sker, OC

, d,.

ED0 r/f is hk SEE PREVIOUS CONCURRENCE.

1EWRITTEN IN OC, OGC, AND E00'S OFFICE b

0FC

0GC DR
E

....--.:- L...--..;....

--:....q.

NAME : H Ragan y: JM r :VS te.o:

DATE :7/10/89

7/10/89
7/10/81:

8907180113 890710 VFoi PDR PROJ D)] ((

f 679A PDC

Mr. Raymond W. Durante Executive Consultant:

AECL Technologies 15400 Calhoun Dr., Suite 100 Rockville, MD 20855

Dear Mr. Durante:

In your letter dated June 25, 1989, AECL Technologies oposed making a presen-tation on July 13, 1989 to inform the Commission abo the technical aspects of the'CANDU 3 reactor.and AECL Technologies' lice ing plan.

Although the Commission endorses such a presen tion, I believe that the timing l

of the proposed meeting is premature..The N staff is presently formulating l

l:

its approach to reviewing a CANDU 3 applic ion.

I recommend that AECL Technologies work with the NRC staff in r aching a mutually agreeable date and forum for such a meeting.

The NRC staff program manager for t CANDU 3 Standard Design Certification is Drew Persinko. You and your staf should deal directly with Mr. Persinko as the NRC point of contact for 1 matters relating to the CANDU 3 licensing project.

Sincerely, I

Kenneth M. Carr Distribution NRC PDR FGillespie Central File HDenton PMAS:PTSB G

EBeckjord, RES DPersinko JScinto, OGC TCox DMossburg (Green Ticket No. 0004586)

FMiragli DCrutchfield VStello JPartlow JTaylor TMurley HThompson JSniezek JBlaha MBridgers (Green Ticket No. 0004586)

(DEARDURANTE)

%N

  • PTSB:PMAS
  • PTSB:PMAS
  • C:PTSB:PMAS
  • D:PMAS h

DPersinko/lt TCox CThomas FGillespie iugley 6/30/89 6/30/89 6/30/89 6/30/89

/)O/89

/

OC t

KCarr 9

(, /8

/ /89

/

l Raymond W. Durante Executive Consultant L

AECL Ta hnologies 15400 Calhoun Dr.

uite 100 Rockville, MD 208

Dear Mr. Durante:

l.

.In your letter dated Jung 25, 1989, AECL Technologies proposed making a presen-tation'on July 13, 1989 to inform the Commission about the technical aspects

.of the.CANDU 3 reactor and AECL Technologies' licensing plan.

N Although'the Commission end rses such a presentation,~I believe that the timing of the proposed meeting is prsmature. The NRC staff is presently formulating its approach to reviewing a CANDU 3 application.

I recommend that AECL Technologies work with;the NRC staff in reaching a mutually agreeable date and forum for such a meeting.

y l

The NRC staff program manager for the CANDU 3 Standard Design Certification is Drew Persinko. You and your staff should deal directly with Mr. Persinko as the NRC point of contact for all matters relating to the CANDU 3 licensing l

project.

Kenneth Carr i

L cc: Commissioner Roberts l

Commissioner Rogers Commissioner Curtiss Distribution Central Files' HDenton PMAS:PTSB RDG EBeckjord,RES l

DPersinko JScinto, 0GC TCox DMossburg (Green Ticket No. 0004586)

FMiraglia DCrutchfield i

l VStello JPartlow i

JTaylor TMurley HThompson JSniezek JBlaha FGillespie (DEARDURANTE)

PT$ :PMAS PTSB: AS P>pPMAS D:PMA h D:NRR DPersinko

.TCox as FGillesp e TMurley G/)/89 4,/A/89

/30/89 (3 /20 /89

/ /89 EDO OC VStello KCarr

/ /89

/ /89 i

i

n. ~ - - -.

.4

,.)

, Y* /

d.

.f:

c /s+# **IQ' o L UNITED STATES -

G e

,...R g.

, f;

-g;

. NUCLEAR REGULATORY COMMISSION ;

a l;

E:

. WASHINGTON, D, C. 20655

' EDO P' incioal Correspondence ' Coritr

.f.

r u

.FROM:-

DUE: 07/05/89.

EDO CONTROL LOOO4586' i

DOC DT.'06/25/89

. FINAL REPLY -

Rtymond W.JDurante.

.i

- Ex::cutive Consultant i

'AECL' Technologies =

..1

?TO '

Commissioner Carr iFOR SIGNATURE-OF:'

CRC'NO: 89-0610' Chnirman-DESC:'

ROUTING:

't

DESIGN FOR.A NEW CANDU REACTOR UNDER PART 52-OF Stello-

.j

'THE NEW. RULE FOR STANDARD DESIGN CERTIFICATION --

Tayl o r-.

iJULY-13TH PRESENTATION Thompson Blaha DATE: 06/29/89

~Beckjord, RES Scinto, DGC.

' ASSIGNED TO:

CONTACTS.

NRR

'Murley l

~~w -

SPECIAL INSTRUCTIONS OR REMARKS:

~

SELECT PEOPLE FROM STAFF TO ATTEND..

.JCHAIRMAN CARR WILL NOT ATTEND.

NRR RECEIVED:.. JUNE 29, 1989

-ACTION:-

  • i PMAS:GILLE.S. PIC/THOM_A5p l

I MURLEY/SNIEZEK NRR-ROUTING:

'MIRAGLIA PARTLOW c

CRUTCHFIELD GILLESPIE j

MOSSBURG l

1;'

1 4

i

?

J

-c-

'7

&n m.

~< ~

7 e - m
gy 3.e

.,u

,147 3.

1,

' OFFICE OF THE' SECRETARY' i

CORRESPONDENCE ' CONTROL - TICKET ~ '

JPAPER NUMBER::

CRC-89-0610' LOGGING DATE: Jun 29!89-eACTION.-OFFICE:--

'EDO' r

I[

iAUTHOR:

IRiW. D u' r a n t e.

g

, '. AFFILIATION: 1 MD - (MARYLASTD);

<f.,

.a LETTER DATE:

Jun 25.89 FILE' CODE:-

SUBJECT:

Design'forfa newiCANDU reactor under part'52 ofithet New Rule.for Standard: Design Certification--July:

, 'E 13th presentation

' ACTION:

Signature :'of:- Chairman :

DISTRIBUTION
-

'RF JSPECIAL HANDLING:- None

-NOTES:'

EDO. SELECT PEOPLE FROM' STAFF TO ATTEND--Chairman

-Carr will'not; attend

DATE DUE:=

Jul 6'89'

' SIGNATURE:

DATE SIGNED:

. AFFILIATION:

-)

l'l' i

1 Rec'd Off, ED0 h Sh D l

l-

-gate he -

3

--i----

y 1

100 -- 00 4 5 b 6 l

[

.i

_.______.u___..____._:____

_ _j b__c__._..___.__._.__