JUL 10 Iggg Mr. Raymond W. Durante Executive Consultant AECL Technologies 15400 Calhoun Dr., Suite 100 Rockville, MD 20855
Dear Mr. Durante:
Chairman Carr has requested that I respond to your letter dated June 25, 1989, concerning AECL Technologies' proposed presentation on July 13, 1989, at the Crowne Plaza Hotel on the technical aspects of the CANDU 3 reactor r id AECL Technologies' licensing plan.
I understand that individual Commisst.oners have contacted you regarding their availability to attend.
Although such a presentation could be useful, I believe that the timing of the proposed meeting is premature.
In the meantime I recommend that AECL Technologies work with the NRC staff in reaching a mutually agreeable date and forum for such a meeting.
T;m NRC staff program manager for the CANDU 3 Standard Design Certification is Drew Persinko, who will serve as the PRC point of contact for all matters relating to the CANDU 3 licensing project.
Sincerely, Original signed W IidoNe lo, Jr.
4 Executive Director for Operations DISTRIBUTION NRC PDR FGillespie Central Files HDenton PMAS:PTSB RDG EBeckjord,RES DPersinko JScinto, OGC TCox DMossburg (Green Ticket No. 0004586)
FMiraglia DCrutchfield VStello JPartlow JTaylor
.TMurley HThompson JSniezek JBlaha MBridgers (Green Ticket NO. 0004586)
(DEARDURANTE)
RMc0sker, OC
, d,.
ED0 r/f is hk SEE PREVIOUS CONCURRENCE.
1EWRITTEN IN OC, OGC, AND E00'S OFFICE b
0FC
- 0GC DR
- E
....--.:- L...--..;....
--:....q.
NAME : H Ragan y: JM r :VS te.o:
DATE :7/10/89
- 7/10/89
- 7/10/81:
8907180113 890710 VFoi PDR PROJ D)] ((
f 679A PDC
Mr. Raymond W. Durante Executive Consultant:
AECL Technologies 15400 Calhoun Dr., Suite 100 Rockville, MD 20855
Dear Mr. Durante:
In your letter dated June 25, 1989, AECL Technologies oposed making a presen-tation on July 13, 1989 to inform the Commission abo the technical aspects of the'CANDU 3 reactor.and AECL Technologies' lice ing plan.
Although the Commission endorses such a presen tion, I believe that the timing l
of the proposed meeting is premature..The N staff is presently formulating l
l:
its approach to reviewing a CANDU 3 applic ion.
I recommend that AECL Technologies work with the NRC staff in r aching a mutually agreeable date and forum for such a meeting.
The NRC staff program manager for t CANDU 3 Standard Design Certification is Drew Persinko. You and your staf should deal directly with Mr. Persinko as the NRC point of contact for 1 matters relating to the CANDU 3 licensing project.
Sincerely, I
Kenneth M. Carr Distribution NRC PDR FGillespie Central File HDenton PMAS:PTSB G
EBeckjord, RES DPersinko JScinto, OGC TCox DMossburg (Green Ticket No. 0004586)
FMiragli DCrutchfield VStello JPartlow JTaylor TMurley HThompson JSniezek JBlaha MBridgers (Green Ticket No. 0004586)
(DEARDURANTE)
%N
- PTSB:PMAS
- PTSB:PMAS
- C:PTSB:PMAS
- D:PMAS h
DPersinko/lt TCox CThomas FGillespie iugley 6/30/89 6/30/89 6/30/89 6/30/89
/)O/89
/
OC t
KCarr 9
(, /8
/ /89
/
l Raymond W. Durante Executive Consultant L
AECL Ta hnologies 15400 Calhoun Dr.
uite 100 Rockville, MD 208
Dear Mr. Durante:
l.
.In your letter dated Jung 25, 1989, AECL Technologies proposed making a presen-tation'on July 13, 1989 to inform the Commission about the technical aspects
.of the.CANDU 3 reactor and AECL Technologies' licensing plan.
N Although'the Commission end rses such a presentation,~I believe that the timing of the proposed meeting is prsmature. The NRC staff is presently formulating its approach to reviewing a CANDU 3 application.
I recommend that AECL Technologies work with;the NRC staff in reaching a mutually agreeable date and forum for such a meeting.
y l
The NRC staff program manager for the CANDU 3 Standard Design Certification is Drew Persinko. You and your staff should deal directly with Mr. Persinko as the NRC point of contact for all matters relating to the CANDU 3 licensing l
project.
Kenneth Carr i
L cc: Commissioner Roberts l
Commissioner Rogers Commissioner Curtiss Distribution Central Files' HDenton PMAS:PTSB RDG EBeckjord,RES l
DPersinko JScinto, 0GC TCox DMossburg (Green Ticket No. 0004586)
FMiraglia DCrutchfield i
l VStello JPartlow i
JTaylor TMurley HThompson JSniezek JBlaha FGillespie (DEARDURANTE)
PT$ :PMAS PTSB: AS P>pPMAS D:PMA h D:NRR DPersinko
.TCox as FGillesp e TMurley G/)/89 4,/A/89
/30/89 (3 /20 /89
/ /89 EDO OC VStello KCarr
/ /89
/ /89 i
i
- n. ~ - - -.
.4
,.)
, Y* /
d.
.f:
c /s+# **IQ' o L UNITED STATES -
G e
,...R g.
, f;
-g;
. NUCLEAR REGULATORY COMMISSION ;
a l;
E:
. WASHINGTON, D, C. 20655
' EDO P' incioal Correspondence ' Coritr
.f.
r u
.FROM:-
DUE: 07/05/89.
EDO CONTROL LOOO4586' i
DOC DT.'06/25/89
. FINAL REPLY -
- Rtymond W.JDurante.
.i
- Ex::cutive Consultant i
'AECL' Technologies =
..1
?TO '
Commissioner Carr iFOR SIGNATURE-OF:'
- PRI i
CRC'NO: 89-0610' Chnirman-DESC:'
ROUTING:
't
- DESIGN FOR.A NEW CANDU REACTOR UNDER PART 52-OF Stello-
.j
'THE NEW. RULE FOR STANDARD DESIGN CERTIFICATION --
Tayl o r-.
iJULY-13TH PRESENTATION Thompson Blaha DATE: 06/29/89
~Beckjord, RES Scinto, DGC.
' ASSIGNED TO:
CONTACTS.
'Murley l
~~w -
SPECIAL INSTRUCTIONS OR REMARKS:
~
SELECT PEOPLE FROM STAFF TO ATTEND..
.JCHAIRMAN CARR WILL NOT ATTEND.
NRR RECEIVED:.. JUNE 29, 1989
-ACTION:-
- i PMAS:GILLE.S. PIC/THOM_A5p l
I MURLEY/SNIEZEK NRR-ROUTING:
'MIRAGLIA PARTLOW c
CRUTCHFIELD GILLESPIE j
MOSSBURG l
1;'
1 4
i
?
J
-c-
'7
&n m.
~< ~
- 7 e - m
- gy 3.e
.,u
,147 3.
1,
' OFFICE OF THE' SECRETARY' i
CORRESPONDENCE ' CONTROL - TICKET ~ '
JPAPER NUMBER::
CRC-89-0610' LOGGING DATE: Jun 29!89-eACTION.-OFFICE:--
'EDO' r
I[
iAUTHOR:
IRiW. D u' r a n t e.
g
, '. AFFILIATION: 1 MD - (MARYLASTD);
<f.,
.a LETTER DATE:
Jun 25.89 FILE' CODE:-
SUBJECT:
Design'forfa newiCANDU reactor under part'52 ofithet New Rule.for Standard: Design Certification--July:
, 'E 13th presentation
' ACTION:
Signature :'of:- Chairman :
- DISTRIBUTION
- -
'RF JSPECIAL HANDLING:- None
-NOTES:'
EDO. SELECT PEOPLE FROM' STAFF TO ATTEND--Chairman
-Carr will'not; attend
- DATE DUE:=
Jul 6'89'
' SIGNATURE:
DATE SIGNED:
. AFFILIATION:
-)
l'l' i
1 Rec'd Off, ED0 h Sh D l
l-
-gate he -
3
--i----
y 1
100 -- 00 4 5 b 6 l
[
.i
_.______.u___..____._:____
_ _j b__c__._..___.__._.__